Manhattan East Midtown-Turtle Bay
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
5 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Aug 5, 2024 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | AT THE TIME OF INSPECTION, AT REAR EXP. 3 I OBSERVED THE REAR MASONRY BRICK WALL 5'-3 HIGH THAT IS IN A STATE OF DISREPAIR WITH A LARGE VERTICAL CRACK FROM THE FLOOR TO THE TOP COPING STONE AND IS LEANING INWARD. THIS IS DUE TO THE DAMAGED WOOD STRUCTURE AT THE REAR OF THE BUILDING. |
| Aug 29, 1995 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Mar 18, 1994 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Mar 18, 1993 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| May 29, 1990 | VP*-VIOLATION UNSERVED ECB- DISMISSED | B-BOILER BOILER OPTIONAL | 36 |