NYC Building Report

Manhattan Chinatown-Two Bridges

301 Grand Street, Manhattan

DOB violations

Department of Buildings violations attached to this BIN or tax lot.

8 records

Date Status Type Summary
Nov 14, 2025 V-DOB VIOLATION - ACTIVE LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
Sep 23, 2024 V-DOB VIOLATION - ACTIVE LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION
Jun 30, 2023 V-DOB VIOLATION - ACTIVE LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION
Apr 25, 2023 V-DOB VIOLATION - ACTIVE LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION
Dec 23, 2020 V-DOB VIOLATION - ACTIVE AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
Sep 17, 2020 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FTM BLDG SAFE CONDN:DUE TO FIRE 9/17/20,REAR WD FRAME ROOF EXTEN/ROOF WD FRAMG BURNED/COLPSD ONTO 3FLR ROOF APRX 22'WX15'D.WATER DMG THR-OUT BLDG.FIRE CUT@ROOF HATCH.EXP2 WALL AT REAR HAD DETERIOR MORTAR JOINTS EXP3 @3FLR PART DETCH STUCCO.OWNR RETN NYSPE EVAL ENTRE BLDG&PREP REPR DWGS.BLDG TO BE REPR'D UNDR PRMT START BY 11/2/20 & COMPLT BY 12/11/20
Sep 17, 2020 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL DUE TO FIRE
Mar 1, 2013 V-DOB VIOLATION - ACTIVE LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2011 INSPECTION REPORT