Manhattan Greenwich Village
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
6 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Jan 6, 2025 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | OBSERVED IN HALLWAY CEILING ON 2ND FLOOR A LARGE CRACK CASCADING ACROSS THE CEILING WHERE PLASTER APPEAR TO BE DETACHING DUE TO DAMAGES RESULTING FROM A FIRE IN APT 2F. |
| Jan 6, 2025 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | OBSERVED WATER DAMAGES AT APT 1F WITH A LARGE SECTION APPROXIMATELY 5FT X 3FT OF THE PLASTER CEILING HAS FALLEN IN KITCHEN. THE WOOD FLOORS BELOW RAISED FROM WATER DAMAGES DUE TO A FIRE IN UNIT 2F AT 2ND FLOOR. |
| Dec 31, 2009 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED |
| Jan 11, 2008 | V*-DOB VIOLATION - DISMISSED | Z-ZONING NONE | Z-ZONING NONE |
| Jan 11, 2008 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |
| Mar 18, 1993 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |