NYC Building Report

Manhattan Greenwich Village

3 East 9 Street, Manhattan

DOB violations

Department of Buildings violations attached to this BIN or tax lot.

6 records

Date Status Type Summary
Jan 6, 2025 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL OBSERVED IN HALLWAY CEILING ON 2ND FLOOR A LARGE CRACK CASCADING ACROSS THE CEILING WHERE PLASTER APPEAR TO BE DETACHING DUE TO DAMAGES RESULTING FROM A FIRE IN APT 2F.
Jan 6, 2025 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL OBSERVED WATER DAMAGES AT APT 1F WITH A LARGE SECTION APPROXIMATELY 5FT X 3FT OF THE PLASTER CEILING HAS FALLEN IN KITCHEN. THE WOOD FLOORS BELOW RAISED FROM WATER DAMAGES DUE TO A FIRE IN UNIT 2F AT 2ND FLOOR.
Dec 31, 2009 V*-DOB VIOLATION - DISMISSED LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
Jan 11, 2008 V*-DOB VIOLATION - DISMISSED Z-ZONING NONE Z-ZONING NONE
Jan 11, 2008 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL C-CONSTRUCTION OTHER OPTIONAL
Mar 18, 1993 V*-DOB VIOLATION - DISMISSED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED