NYC Building Report

Manhattan Financial District-Battery Park City

29 Broadway, Manhattan

DOB violations

Department of Buildings violations attached to this BIN or tax lot.

157 records

Date Status Type Summary
Jun 23, 2024 V*-DOB VIOLATION - DISMISSED EARCX-FAILURE TO SUBMIT EER NONE FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2023)
Dec 1, 2023 V*-DOB VIOLATION - DISMISSED EGRADE-FAILURE TO POST ENERGY GRADE/SCORE NONE FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3
Apr 22, 2023 V*-DOB VIOLATION - DISMISSED EARCX-FAILURE TO SUBMIT EER NONE FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 IN 2022
Feb 22, 2023 V-DOB VIOLATION - ACTIVE FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023
Aug 2, 2022 V*-DOB VIOLATION - DISMISSED BENCH-FAILURE TO BENCHMARK NONE FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
Jun 1, 2022 V*-DOB VIOLATION - DISMISSED BENCH-FAILURE TO BENCHMARK NONE FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
Apr 29, 2021 V*-DOB VIOLATION - DISMISSED EGRADE-FAILURE TO POST ENERGY GRADE/SCORE NONE FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3
Jan 21, 2021 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
Jan 21, 2021 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
Jan 21, 2021 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
Jan 21, 2021 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
Jan 21, 2021 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
Jan 21, 2021 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
Jan 21, 2021 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
Jan 21, 2021 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
Jan 21, 2021 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
Sep 2, 2020 V*-DOB VIOLATION - DISMISSED AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
Sep 2, 2020 V*-DOB VIOLATION - DISMISSED AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
Sep 6, 2019 V*-DOB VIOLATION - DISMISSED ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST
Sep 3, 2019 V*-DOB VIOLATION - DISMISSED LL2604S-SPRINKLER NONE FAILED TO FILE FINAL SPRINKLER REPORT BY JULY 1, 2019
Jan 16, 2019 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
Jul 31, 2018 V*-DOB VIOLATION - DISMISSED FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED FAILED TO FILE FISP CYCLE 8B TECHNICAL REPORT BY 02/21/2018
Jan 26, 2018 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED VIO ISSUED TO ELEVATOR-FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST
Jan 26, 2018 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED VIO ISSUED TO ELEVATOR-FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST
Jan 26, 2018 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED VIO ISSUED TO ELEVATOR-FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST
Jan 26, 2018 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED VIO ISSUED TO ELEVATOR-FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST
Jan 26, 2018 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED VIO ISSUED TO ELEVATOR-FAIL TO VORRECT DEFECTS ON 2016 CAT 1 INSP/TST
Jan 26, 2018 V*-DOB VIOLATION - DISMISSED ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST
Jan 26, 2018 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED VIO ISSUED TO ELEVATOR-FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST
Jan 26, 2018 V-DOB VIOLATION - ACTIVE E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
Jan 26, 2018 V-DOB VIOLATION - ACTIVE E-ELEVATOR ELEVATORREQUIRED VIO ISSUED TO ELEVATOR-FAIL TO CORRECT DEFFECTS ON 2016 CAT 1 INSP/TST
Jan 26, 2018 V-DOB VIOLATION - ACTIVE E-ELEVATOR ELEVATORREQUIRED VIO ISSUED TO ELEVATOR-FAIL TO CORRECT DEFFECTS ON 2016 CAT 1 INSP/TST
Jan 26, 2018 V-DOB VIOLATION - ACTIVE E-ELEVATOR ELEVATORREQUIRED VIO ISSUED TO ELEVATOR-FAIL TO CORRECT DEFFECTS ON 2016 CAT 1 INSP/TST
Jan 26, 2018 V-DOB VIOLATION - ACTIVE E-ELEVATOR ELEVATORREQUIRED VIO ISSUED TO ELEVATOR-FAIL TO CORRECT DEFFECTS ON 2016 CAT 1 INSP/TST
Jan 26, 2018 V*-DOB VIOLATION - DISMISSED ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST
Jan 26, 2018 V*-DOB VIOLATION - DISMISSED ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST
Jan 26, 2018 V*-DOB VIOLATION - DISMISSED ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST
Jan 26, 2018 V*-DOB VIOLATION - DISMISSED ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST
Jan 26, 2018 V*-DOB VIOLATION - DISMISSED ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST
Jan 26, 2018 V*-DOB VIOLATION - DISMISSED ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST
Jan 26, 2018 V*-DOB VIOLATION - DISMISSED ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST
Jan 26, 2018 V*-DOB VIOLATION - DISMISSED ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST
Jan 26, 2017 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED VIO ISSUED TO ELEVATOR-FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST
Jan 26, 2017 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED VIO ISSUED TO ELEVATOR-FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST
Jan 26, 2017 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED VIO ISSUED TO ELEVATOR-FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST
Jan 26, 2017 V-DOB VIOLATION - ACTIVE E-ELEVATOR ELEVATORREQUIRED VIO ISSUED TO ELEVATOR-FAIL TO CORRECT DEFFECTS ON 2016 CAT 1 INSP/TST
Jan 26, 2017 V-DOB VIOLATION - ACTIVE E-ELEVATOR ELEVATORREQUIRED VIO ISSUED TO ELEVATOR-FAIL TO CORRECT DEFFECTS ON 2016 CAT 1 INSP/TST
Nov 14, 2016 V*-DOB VIOLATION - DISMISSED ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2014 CAT 1 INSP/TST
Nov 14, 2016 V*-DOB VIOLATION - DISMISSED ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2014 CAT 1 INSP/TST
Jan 25, 2016 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED