NYC Building Report

Manhattan Greenwich Village

28 West 11 Street, Manhattan

DOB violations

Department of Buildings violations attached to this BIN or tax lot.

6 records

Date Status Type Summary
Apr 27, 2022 V*-DOB VIOLATION - DISMISSED AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
Sep 15, 2021 V*-DOB VIOLATION - DISMISSED AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
Jun 14, 2021 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL OBSERVED SPRINKLER HEADS ARE PAINTED WITH THICK PAINT WHICH OBSTRUCTING SPRINKLER OPERATING SYSTEM ON 4TH FLOOR LEVEL & APT # 4B OCCUPIED AT TIME OF INSPECTION. PROVIDE A FIRE GUARD UNTIL SPRINKLER ISSUE RESOLVE.
Jan 6, 2020 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL BOROUGH COMMISSIONER HAS ISSUED A STOP WORK ORDER UNDER APPLICATION #122473563 DUE TO APPLICANT WITHDRAWAL. STOP ALL WORK IMMEDIATELY AND MAKE SITE SAFE
Jan 16, 2018 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL THE BOROUGH COMMISSIONER HAS ORDERED ALL WORK STOPPED A/O 1.16.18 FOR JOB# 121929226. THE APPLICANT PROFESSIONAL OF RECORD HAS WITHDRAWNN FR OM THE JOB. CANNOT DETERMINE HOW MUCH WORK WAS COMPLETED. STOP ALL WOR K AT SITE UNDER THE JOB# 121929226
Feb 4, 2016 V*-DOB VIOLATION - DISMISSED LANDMK-LANDMARK NONE LANDMK-LANDMARK NONE