NYC Building Report

Manhattan Harlem (South)

279 West 118 Street, Manhattan

HPD violations

Housing Maintenance Code violations are filed by tax lot (BBL 1-01924-0005), so they can include other buildings on the same lot.

290 records

Date Class Status Apartment Summary
Feb 3, 2019 C VIOLATION CLOSED Not available § 27-2005, 2007 ADM CODE REMOVE THE ILLEGAL FASTENING CONSISTING OF EYE LATCH CAPABLE OF BEING PADLOCKED AT LOT LINE GATE AND FENCE AT BUILDING FRONT
Jan 30, 2019 B NOV SENT OUT 2B § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH
Jan 30, 2019 B NOV SENT OUT 2B § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK CEILING IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH
Jan 30, 2019 B NOV SENT OUT 2B § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING AND EAST WALL IN THE PRIVATE HALLWAY LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH
Jan 30, 2019 B NOV CERTIFIED LATE 2B § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING AND ALL WALLS IN THE BATHROOM LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH
Jan 30, 2019 B NOV CERTIFIED LATE 2B § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK CEILING AND ALL WALLS IN THE BATHROOM LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH
Nov 27, 2018 B NOV SENT OUT 2B § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). DEFECTIVE LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH
Nov 27, 2018 B NOV SENT OUT 2B § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR DEFECTIVE LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH
Nov 27, 2018 A NOV CERTIFIED LATE 2B § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS AND CEILING IN THE BATHROOM LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH
Nov 27, 2018 B NOV CERTIFIED LATE 2B § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE BATHROOM LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH
Oct 3, 2018 A VIOLATION CLOSED Not available § 27-2014 ADM CODE AND DEPT. RULES AND REGULATIONS. SCRAPE AND REMOVE RUST SCALES AND PAINT WITH 2 COATS OF PAINT ALL BALCONIES, ALL PARTS ALL COMPONENTS OF FIRE ESCAPE AT FRONT OF BUILDING
Oct 3, 2018 B NOV SENT OUT 2B § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR DEFECTIVE LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH
Oct 3, 2018 B NOV CERTIFIED LATE 2B § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING AND NORTH WALL IN THE BATHROOM LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH
Oct 3, 2018 B NOV CERTIFIED LATE 2B § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING AND NORTH WALL IN THE BATHROOM LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH
May 16, 2018 A NOV SENT OUT 2B § 27-2005 ADM CODE REFIT THE ENTRANCE DOOR IN THE 2nd ROOM FROM NORTH AT WEST LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH
May 16, 2018 B NOV SENT OUT 2B § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING DOOR KNOB AT ENTRANCE DOOR IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH
May 16, 2018 B NOV SENT OUT 2B § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND ALL WALLS IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH
May 16, 2018 B NOV SENT OUT 2B § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH
May 16, 2018 C VIOLATION CLOSED 2B § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND NORTH WALL IN THE BATHROOM LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH
May 16, 2018 C VIOLATION CLOSED 2B § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING AND NORTH WALL IN THE BATHROOM LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH
Mar 18, 2018 B NOV CERTIFIED LATE 2B § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING AND NORTH WALL IN THE BATHROOM LOCATED AT APT 2B, 2nd STORY, APARTMENT AT NORTH
Mar 18, 2018 C NOV CERTIFIED LATE 2B § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE BATHROOM LOCATED AT APT 2B, 2nd STORY, APARTMENT AT NORTH
Feb 24, 2018 B NOV SENT OUT 2B § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH
Feb 24, 2018 B NOV SENT OUT 2B § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 1st BEDROOM FROM EAST LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH
Feb 24, 2018 B NOV CERTIFIED LATE 2B § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE BATHROOM LOCATED AT APT 2B, 2nd STORY
Feb 12, 2018 B NOV SENT OUT 2B § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND NORTH WALL IN THE BATHROOM LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH
Feb 12, 2018 B NOV CERTIFIED LATE 2B § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING AND NORTH WALL IN THE BATHROOM LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH
Feb 12, 2018 A NOV CERTIFIED LATE 2B § 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE RUBBER GASKET AT REFRIGERATOR DOOR IN THE KITCHEN LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH
Feb 12, 2018 A NOV SENT OUT 2B § 27-2005 ADM CODE REFIT ENTRANCE DOOR IN THE 3rd ROOM FROM NORTH AT WEST LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH
Feb 6, 2018 B NOV CERTIFIED LATE 2B § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING, AND WALLS. IN THE BATHROOM LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH
Feb 6, 2018 B NOV CERTIFIED LATE 2B § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING. IN THE BATHROOM LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH
Feb 6, 2018 C VIOLATION CLOSED 2B § 27-2070 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF GAS TO THE FIXTURES AT GAS RANGE. IN THE KITCHEN LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH
Feb 1, 2018 B NOV SENT OUT 2B § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR ALL WALLS AND CEILING IN THE 3rd ROOM FROM EAST LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH
Jan 31, 2018 C VIOLATION CLOSED 2B § 27-2070 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF GAS TO THE FIXTURES AT RANGE IN THE KITCHEN LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST
Jan 31, 2018 B NOV CERTIFIED LATE 2B § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT EAST WALL IN THE BATHROOM LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST
Jan 31, 2018 C NOV CERTIFIED LATE 2B § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE BATHROOM LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST
Jan 31, 2018 B NOV CERTIFIED LATE 2B § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE BATHROOM LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST
Jan 28, 2018 B NOV SENT OUT 2B § 27-2005 HMC:TRACE AND REPAIR THE SOURCE AND ABATE THE NUISANCE CONSISTING OF MOLD ... AT CEILING APPROX 10 SQ FEET IN THE BATHROOM LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH
Jan 28, 2018 B NOV CERTIFIED LATE 2B § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE BATHROOM LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH
Jan 28, 2018 C VIOLATION CLOSED 2B § 27-2070 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF GAS TO THE FIXTURES AT RANGE IN THE KITCHEN LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH
Dec 29, 2017 C VIOLATION CLOSED Not available § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM LOCKED DOOR AT BASEMENT
Dec 29, 2017 C NOV SENT OUT 2B § 27-2029 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH
Nov 30, 2017 B NOV SENT OUT 2B § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING & WALLS IN THE BATHROOM LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH
Nov 30, 2017 A NOV SENT OUT 2B § 27-2005 ADM CODE REFIT ENTRANCE DOOR IN THE BATHROOM LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH
Nov 30, 2017 A NOV SENT OUT 2B § 27-2005 ADM CODE REFIT ENTRANCE DOOR IN THE 3rd ROOM FROM NORTH AT WEST LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH
Nov 30, 2017 A NOV CERTIFIED LATE 2B § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING CABINET DOOR UNDER SINK IN THE KITCHEN LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH
Nov 30, 2017 B NOV SENT OUT 2B § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE BATHROOM LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH
Sep 12, 2017 A VIOLATION CLOSED Not available § 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES THAT SHOULD BE FOLLOWED WHEN A GAS LEAK IS SUSPECTED AT PUBLIC HALL, 1st STORY
Sep 12, 2017 B NOV SENT OUT 2B § 27-2026 ADM CODE REPAIR THE BROKEN OR DEFECTIVE CONNECTION WASTE LINE AT SINK IN THE KITCHEN LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH
Jun 21, 2017 A VIOLATION CLOSED Not available § 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES THAT SHOULD BE FOLLOWED WHEN A GAS LEAK IS SUSPECTED AT PUBLIC HALL, 1st STORY