Manhattan Upper West Side (Central)
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
5 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Oct 6, 2025 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN.DUE TO A FIRE WHICH ORIGINATED AT NEIGHBORING 28 W57TH STREET,OBSRVD PENTHOUSE ROOF WITH VENT OPENINGS,SKYLIGHT OUT, MINOR CHARRNG TO PENTHOUSE STRCTRE,INT DMG TO PNTHSE APT.COMPLY WITH COMMISSIONER'S ORDER:DOB VIOLATION #082625FEU10702AK (CONTROL #341628) IMMEDIATELY |
| Aug 26, 2025 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | EMERGENCY WORK ORDER.DUE TO A FIRE WHICH ORIGINATED@NEIGBORNG 28 W75TH STREET,OBSRVD PENTHOUSE ROOF W/VENT OPENINGS,SKYLIGHT OUT,MINOR CHARRNG TO PENTHOUSE STRCTRE.INTERIOR DMG TO PNTHSE.OWNR TO IMMED ENAGAGE A NYSPE&ENDRSD CNTRCTR TO EVAL THE ENT BLDG&IMMED STBLZE&MAKE WEATHERTGHT PENTHOUSE WALLS&ROOF |
| Aug 26, 2025 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN.DUE TO A FIRE WHICH ORIGINATED AT NEIGHBORING 28 W75TH STREET,OBSRVD PENTHOUSE ROOF WITH VENT OPENINGS,SKYLIGHT OUT, MINOR CHARRNG TO PENTHOUSE STRCTRE,INT DMG TO PNTHSE APT.OWNR TO ENGAGE NYSPE&ENDRSD CNTRCTR TO EVAL THE ENT BLDG&RPAIR UNDR PRMT.FILE FOR PRMTS BY 926/25.SGN OFF RPAIRS |
| Aug 25, 2025 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | STRUCTURE RENDERED NON-COMPLIANT. ROOF OPEN TO THE ELEMENTS, SKYLIGHT OUT, WALLS AND CEILING DAMAGED AT TOP FLOOR APARTMENTS DUE TO FIRE AT ADJACENT PROPERTY 28 WEST 75 STREET. VACATE ENTIRE BUILDING. |
| Jan 6, 2006 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |