NYC Building Report

Manhattan Chinatown-Two Bridges

26 Mulberry Street, Manhattan

DOB violations

Department of Buildings violations attached to this BIN or tax lot.

7 records

Date Status Type Summary
Jun 20, 2023 V-DOB VIOLATION - ACTIVE LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION
Mar 16, 2022 V*-DOB VIOLATION - DISMISSED AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
Nov 30, 2021 V-DOB VIOLATION - ACTIVE P-PLUMBING NONE COMMISSIONERS REQUEST FOR IMMEDIATE CORRECTIVE ACTION I OBSERVED HOT WATER VENT NOT INSTALLED CORRECTLY USING GAS METER ROOM AS STORAGE HAVING FUTURES ON LINE OBSERVED CONDITION(S) DOES NOT COMPLY WITH SECTION 28-301.1 OF THE B102 AND PRESENTS AN IMMINENT RISK TO PUBLIC SAFETY. CORRECT THE SITUATION WITHIN 48 HOURS
Nov 24, 2021 V*-DOB VIOLATION - DISMISSED P-PLUMBING NONE COMMISSIONERS REQUEST FOR IMMEDIATE CORRECTION ACTION I OBSERVED NO GPS1 FORM ON SITE AT TIME OF INSPECTION
Jan 1, 2009 V*-DOB VIOLATION - DISMISSED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
Feb 27, 2001 V*-DOB VIOLATION - DISMISSED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
Sep 1, 1994 V*-DOB VIOLATION - DISMISSED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED