Manhattan Harlem (North)
26 Edgecombe Avenue, Manhattan
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
9 records
| Date | Status | Type | Summary |
|---|---|---|---|
| May 12, 2026 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER AS PER SECTION 28.301.1 OF THE NYC ADMIN CODE.AS NOTED AT TIME OF INSPECTION,OBSERVED AT EXP1,BROKEN GLASS AT MAIN ENTRANCE,DAMAGE CORNICE AT PARAPET LEVEL ALSO OBSERVED AT EXP4,NUMEROUS VERTICAL STEP CRACKSS AND DETERIORATION REMEDY:REPAIR AND/OR REPLACE |
| Mar 18, 2025 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER.OBSERVED CRACK ED STUCCO,OPEN UNFINISHED SOFFIT,CORRODED CORNICE AND BORDED UP WINDOW S ON EXP1 WEST ELEV.ALSO BOARDED UP WINDOWS,ROTTED CORNICE AND HOLE IN ROOF WITH EXPOSED PLYWOOD ON EXP4.REMEDY:REPAIR AND/OR REPLACE DAMAGED FACADE AND APPURTENANCES |
| Oct 1, 2024 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER.AS NOTED AT TI ME OF INSPECTION I OBSERVED ON EXP1 WEST ELEV CRACKS IN STUCCO,OPEN UN FINISHED SOFFIT,ROTTEN CORNICE,BOARDED UP WINDOWS ON SEVERAL FLOORS.EX P4 SOUTH ELEV ROTTED METAL CORNICE,BOARDED UP WINDOWS.ROOF ROTTED PLYW OOD,LOOSE PLYWOOD.REMEDU:REPAIR AND/OR REPLACE ALL DAMAGED FACADE |
| May 23, 2024 | V*-DOB VIOLATION - DISMISSED | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | REMEDY: IMMEDIATLY REMOVE ENTIRE AWNING. IMMEDIATELY REPAIR SIDEWALK SHED AND CONSTRUCTION FENCE |
| May 14, 2024 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | EMERGENCY WORK ORDER DUE TO IMMEDIATELY HAZARDOUS MATERIAL HANGING FRO M THE CORNICE OF THE BUILDING.LIGHT CANISTER AND A SECTION OF METAL CO RNICE HANGING.REMEDY:IMMEDIATELY REMOVE HAZARDOUS MATERIALS NOTED.IMME DIATELY PROVIDE SAFETY MEASURES UNDER DIRECTION OF LIC PROFESSIONALS |
| May 14, 2024 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER.AT THE TIME OF INSPECTION,OBSERVED WINDOWS WERE ALL BOARDED UP AT EXP1,4.AT MULTIPLE LOCATIONS OBSERVED CRACKS/STEP CRACKS.EXP1 OBSERVED DAMAGED CORNICE HA NGING BY AN ELECTRIC WIRE.REMEDY:REPAIR AND/OR REPLACE |
| Mar 3, 2021 | V-DOB VIOLATION - ACTIVE | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Dec 4, 2020 | V*-DOB VIOLATION - DISMISSED | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | SEAL ENTIRE BUILDING, WINDOW OPENINGS AND DOOR OPENINGS TO PREVENT UNWANTED ENTRY TO ALL EXPOSURES. MAKE ROOF WATERTIGHT |
| Dec 1, 2013 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN BUILDING DUE TO VEHICLE ACCIDENT |