NYC Building Report

Manhattan Harlem (South)

255 West 113 Street, Manhattan

HPD violations

Housing Maintenance Code violations are filed by tax lot (BBL 1-01829-0113), so they can include other buildings on the same lot.

109 records

Date Class Status Apartment Summary
Oct 1, 1982 C NOV CERTIFIED LATE Not available D26-10.01 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING BASEMENT FRONT ROOM 1A ER1.
Oct 1, 1982 B NOV CERTIFIED LATE Not available D26-10.01 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING BASEMENT PUBLIC HALL BATHROOM.
Oct 1, 1982 B NOV CERTIFIED LATE Not available D26-10.01 ADM CODE PROPERLY SECURE THE LOOSE STAIR TREADS 2ND TO 3RD STY PUBLIC HALL STAIRSTHROUGHOUT.
Oct 1, 1982 B NOV CERTIFIED LATE Not available D26-16.01 ADM CODE REMOVE ALL OBSTRUCTIONS AND REPAIR ALL DEFECTS IN SINK 3RD STY REAR EAST ROOM 6.
Sep 17, 1982 B NOV CERTIFIED LATE 3 D26-10.01 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE GROUT WALLS TILE 2ND STY APT 3 BATHROOM. , SECTION '' ''
Sep 17, 1982 B NOV CERTIFIED LATE 3 D26-10.01 ADM CODE REPLACE WITH NEW THE MISSING GLASS LOWER SASH 2ND STY APT 3 BATHROOM. , SECTION '' ''
Sep 17, 1982 B NOV CERTIFIED LATE 3 D26-10.01 ADM CODE REPLACE WITH NEW THE MISSING GLASS UPPER SASH 2ND STY APT 3 KITCHEN. , SECTION '' ''
Sep 17, 1982 B NOV CERTIFIED LATE 3 D26-10.01 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE PAINTED SPRINKLER HEADS 2ND STY APT 3 THROUGHOUT. , SECTION '' ''
Sep 17, 1982 B NOV CERTIFIED LATE 3 D26-10.01 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR 2ND STY APT 3 2ND ROOM FROM FRONT. , SECTION '' ''