Manhattan Midtown-Times Square
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
214 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Mar 25, 2026 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | TIMES SQUARE ALLIANCE COMPL ON MULT OCCASSIONS TO DOB ABOUT UNSAFE COND.BLDG STALLED CONST SITE,STEEL FRAME,WITH S/W VAULT HAVE SHORING 2FT OF WATER @ SUBCELLAR,SLABS DEMO W/HOIST IN PLACE.FULLY VACATE THE PREMISES.THE BLDG LACKS OF PROPER PROTECTION AND EGRESS |
| Mar 25, 2026 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | TIMES SQUARE ALLIANCE COMPL ON MULT OCCATIONS TO DOB ABOUT UNSAFE COND.BLDG STALLED CONST SITE,STEEL FRAME,WITH S/W VAULT HAVE SHORING 2FT OF WATER @ SUBCELLAR,SLABS DEMO W/HOIST IN PLACE.OWNER TO HIRE QUAL PERSON TO PREPARE MONITORING PLAN,DEWATER BLDG,CLOSE ALL OPENINGS ,EVAL SHORING EGRESS ON SITE |
| Feb 11, 2026 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER.AS NOTED AT TI ME OF INSPECTION,I OBSERVED AT EXP1 CRACKS AT PARAPET BRICKWORK,BOARDE D WINDOWS,DAMAGED COPING AT 18TH FL,COPING CRACKED AT 16TH FL.EXP4 BRO KEN WINDOW PANE 17TH FL.EXP2 BOARDED WINDOWS,DAMAGED LOOSE METAL CAPPI NG,OPEN MORTAR JOINT AT TOP PARAPET.REMEDY:REPAIR AND/OR REPLACE |
| Sep 18, 2025 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | (09182024SR10501DO) FTM EXTER BLDG WALL & APPURT. OBSERVED ON EXP 1,2, & 4 MULTIPLE BROKEN WINDOW/OPEN/NOT SECURED/MISSING WINDOWS AT EXP 1 OBSERVED MULTIPLE CRACKS & STEPCRACK AT VARIOUS LEVELS OF THE FACADE OBSERVED SPALLING/CRACKED DECROATIVE STONE IN MULTIPLE LEVELS & LOCATIONS. REMEDY: REPAIR AND OR REPLACE.[ACTUAL DATE 9/18/2024] |
| Sep 11, 2025 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER. OBSERVED SPALLED/SPALLING, CRACKED STONE WORK ON EXPOSURE 1 NORTH ELEVATION ALSO MISSING WINDOW PANES IN MULTIPLE LOCATIONS WITH BROKEN WINDOW ON EXPOSURE 4 WEST ELEVATION. REMEDY: REPAIR AND/OR REPLACE |
| Jan 6, 2025 | V*-DOB VIOLATION - DISMISSED | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | REMEDY: SEAL ALL ACCESSIBLE OPENINGS AT EXPOSURE #1 AND REPAIR CONSTRUCTION FENCE TO SAFEGUARD PUBLIC AND PROPERTY TO GUARD AGAINST UNLAWFUL ENTRY |
| Dec 1, 2024 | V-DOB VIOLATION - ACTIVE | EGRADE-FAILURE TO POST ENERGY GRADE/SCORE NONE | FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3 |
| Nov 23, 2024 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | NOTED SWS HIT BY VEHICLE AND IN DISREPAIR. ONE POST BENT AT WESTERN MOST SECTION BT DRIVE. |
| Sep 20, 2024 | V*-DOB VIOLATION - DISMISSED | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | REMEDY: .SEAL ALL ENTRANCES ALONG EXP. #1 (WEST43ST) TO PREVENT UNAUTH ORIZED ACCESS. LEAVE (1) WELL SECURED ACCESS POINT FOR CONTROLLED ACCESS |
| Sep 18, 2024 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN EXTERIOR BUILDING WALLS AND APPURTENCES. AS NOTED AT TIME OF INSPECTION OBSERVED ON EXPOSURE 1,2,4 MULTIPLE BROKEN WINDOWS OPENED NOT SECURED MISSING WINDOW.EXPOSURE 1 OBSERVED MULTIPLE CRACKS AND STEP CRACKS AT VARIOUS LEVELS OF THE FACADE REMEDY, NEEDS TO BE REPAIRED/OR REPLACED |
| Aug 2, 2024 | V-DOB VIOLATION - ACTIVE | BENCH-FAILURE TO BENCHMARK NONE | FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 |
| Jun 23, 2024 | V-DOB VIOLATION - ACTIVE | EARCX-FAILURE TO SUBMIT EER NONE | FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2023) |
| May 2, 2024 | V-DOB VIOLATION - ACTIVE | BENCH-FAILURE TO BENCHMARK NONE | FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 |
| Feb 22, 2024 | V-DOB VIOLATION - ACTIVE | BENCH-FAILURE TO BENCHMARK NONE | FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 |
| Dec 12, 2023 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | EMERGENCY WORK ORDER DUE TO MISSING AND BROKEN WINDOWS ON SEVERAL FLRS ON EXPOSURE#1 NORTH ELEVATION CRACKS&SPALLING MASONRY ON 2ND FLOOR AND ON SEVERAL OTHER FLOORS& LOCATIONS.REMEDY:IMMEDIATELY REPAIR DAMAGE FACADE AND APPURTENANCES REPAIR OR REPLACE DAMAGED WINDOW&CONTINUE PROVIDING ADEQUATE SAFETY MEASURES AS PER 1 RCNY 103-04 |
| Dec 1, 2023 | V-DOB VIOLATION - ACTIVE | EGRADE-FAILURE TO POST ENERGY GRADE/SCORE NONE | FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3 |
| Nov 2, 2023 | V-DOB VIOLATION - ACTIVE | BENCH-FAILURE TO BENCHMARK NONE | FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 |
| Aug 30, 2023 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.OBSERVED SPALLED /SPALLING STONEWORK AND MISSING WINDOWS ON EXPOSURE#1 NORTH ELEVATION MISSING WINDOW SASH AT EXPPOSURE 1&2 REMEDY:MAINTAIN BUILDING.REPAIR /REPLACE |
| Aug 2, 2023 | V-DOB VIOLATION - ACTIVE | BENCH-FAILURE TO BENCHMARK NONE | FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 |
| May 15, 2023 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.OBSERVED AT EXPOSURE#1 NORTH ELEVATION DAMAGED MASONRY AT 1ST FLOOR ALSO MISSING WINDOW SASH AT EXPOSURE#1 & EXPOSURE#2.REMEDY:MAINTAIN BUILDING REPAIR AND OR REPLACE |
| May 2, 2023 | V-DOB VIOLATION - ACTIVE | BENCH-FAILURE TO BENCHMARK NONE | FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 |
| Apr 22, 2023 | V-DOB VIOLATION - ACTIVE | EARCX-FAILURE TO SUBMIT EER NONE | FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2022) |
| Feb 6, 2023 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN BUILDING EXTERIOR WALLS FACADE AND APPURTENANCES NOTE:OBSERVED @ EXPOSURE#1&2,MISSING WINDOW PANES SOME WINDOWS COVERED WITH PLYWOOD.AT EXPOSURE#1,WINDOW COMPLETLY MISSING AND NOT BOARDED UP REMEDY:MAINTAIN BUILDING EXTERIOR WALLS,FACADE AND APPURTENANCES |
| Feb 2, 2023 | V-DOB VIOLATION - ACTIVE | BENCH-FAILURE TO BENCHMARK NONE | FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 |
| Dec 1, 2022 | V-DOB VIOLATION - ACTIVE | EGRADE-FAILURE TO POST ENERGY GRADE/SCORE NONE | FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3 |
| Nov 23, 2022 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | THE BOROUGH COMISSIONER HAS ISSUED A STOP WORK ORDER TO APPLICATION #121291244 DUE TO CONTRACTOR WITHDRAWAL. STOP ALL WORK UNDER REFERENCED APPLICATION AND MAKE SITE SAFE. |
| Nov 23, 2022 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | THE BOROUGH COMMISSIONER HAS ISSUED A STOP WORK ORDER TO APPLICATION #122818095 DUE TO CONTRACTOR WITHDRAWAL. STOP ALL WORK ASSOCIATED WITH REFERECED APPLICATION AND MAKE SITE SAFE. |
| Nov 23, 2022 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | THE BOROUGH COMMISSIONER HAS ISSUED A STOP WORK ORDER TO APPLICATION #122998355 DUE TO CONTRACTOR WITHDRAWAL. STOP ALL WORK UNDER REFERENCED APPLICATION AND MAKE SITE SAFE. |
| Nov 23, 2022 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | THE BOROUGH COMISSIONER HAS ISSUED A STOP WORK ORDER TO APPLICATION #120272025 DUE TO CONTRACTOR WITHDRAWAL. STOP ALL WORK UNDER REFERENCED APPLICATION AND MAKE SITE SAFE. |
| Nov 23, 2022 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | THE BOROUGH COMISSIONER HAS ISSUED A STOP WORK ORDER TO APPLICATION #122269892 DUE TO CONTRACTOR WITHDRAWAL. STOP ALL WORK UNDER REFERENCED APPLICATION AND MAKE SITE SAFE. |
| Nov 2, 2022 | V-DOB VIOLATION - ACTIVE | BENCH-FAILURE TO BENCHMARK NONE | FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 |
| Aug 21, 2022 | V-DOB VIOLATION - ACTIVE | EARCX-FAILURE TO SUBMIT EER NONE | FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2021) |
| Aug 2, 2022 | V-DOB VIOLATION - ACTIVE | BENCH-FAILURE TO BENCHMARK NONE | FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 |
| Jun 1, 2022 | V-DOB VIOLATION - ACTIVE | BENCH-FAILURE TO BENCHMARK NONE | FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 |
| Feb 22, 2022 | V-DOB VIOLATION - ACTIVE | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 |
| Feb 2, 2022 | V-DOB VIOLATION - ACTIVE | BENCH-FAILURE TO BENCHMARK NONE | FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 |
| Dec 1, 2021 | V-DOB VIOLATION - ACTIVE | EGRADE-FAILURE TO POST ENERGY GRADE/SCORE NONE | FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3 |
| Nov 2, 2021 | V-DOB VIOLATION - ACTIVE | BENCH-FAILURE TO BENCHMARK NONE | FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 |
| Oct 13, 2021 | V-DOB VIOLATION - ACTIVE | E-ELEVATOR ELEVATORREQUIRED | E-ELEVATOR ELEVATORREQUIRED |
| Oct 13, 2021 | V-DOB VIOLATION - ACTIVE | E-ELEVATOR ELEVATORREQUIRED | E-ELEVATOR ELEVATORREQUIRED |
| Oct 13, 2021 | V-DOB VIOLATION - ACTIVE | E-ELEVATOR ELEVATORREQUIRED | E-ELEVATOR ELEVATORREQUIRED |
| Oct 13, 2021 | V-DOB VIOLATION - ACTIVE | E-ELEVATOR ELEVATORREQUIRED | E-ELEVATOR ELEVATORREQUIRED |
| Oct 13, 2021 | V-DOB VIOLATION - ACTIVE | E-ELEVATOR ELEVATORREQUIRED | E-ELEVATOR ELEVATORREQUIRED |
| Oct 13, 2021 | V-DOB VIOLATION - ACTIVE | E-ELEVATOR ELEVATORREQUIRED | E-ELEVATOR ELEVATORREQUIRED |
| Oct 13, 2021 | V-DOB VIOLATION - ACTIVE | E-ELEVATOR ELEVATORREQUIRED | E-ELEVATOR ELEVATORREQUIRED |
| Aug 2, 2021 | V-DOB VIOLATION - ACTIVE | BENCH-FAILURE TO BENCHMARK NONE | FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 |
| Jun 20, 2021 | V-DOB VIOLATION - ACTIVE | EARCX-FAILURE TO SUBMIT EER NONE | FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2020) |
| Jun 2, 2021 | V-DOB VIOLATION - ACTIVE | BENCH-FAILURE TO BENCHMARK NONE | FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 |
| Apr 29, 2021 | V-DOB VIOLATION - ACTIVE | EGRADE-FAILURE TO POST ENERGY GRADE/SCORE NONE | FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3 |
| Feb 2, 2021 | V-DOB VIOLATION - ACTIVE | BENCH-FAILURE TO BENCHMARK NONE | FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 |