Date Status Type Summary
Sep 21, 2016 V*-DOB VIOLATION - DISMISSED AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
Sep 21, 2016 V*-DOB VIOLATION - DISMISSED AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
Sep 21, 2016 V*-DOB VIOLATION - DISMISSED AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
Sep 21, 2016 V*-DOB VIOLATION - DISMISSED AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
Aug 4, 2016 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL DURING DEMOLITION OF 247 W34TH ST, MN IT WAS DISCOVERED THAT THE +/-4 STORY WALL BETWEEN 247 W34TH ST,MN IS A BEARING WALL FOR 247 W34TH ST REMEDY:STOP ALL WORK ALONG THE PARTY WALL FOR INVESTIGATION ON HOW TO MOVE FORWARD.COORDINATED STABILIZATION&BRACING BETWEEN 247&249 W34TH ST TO BE FILED BY 8/10/16.WORK TO COMMENCE UNDER PERMIT BY 8/17/16
Jul 22, 2016 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL EMERG WORK BLDG IS STRUCTURALLY COMPROMISED,PARTIALLY COLLAPSED&IN DANGER OF ADD'L COLLAPSE.THE BLDG IS A DANGER TO THE PUBLIC.REMEDY: DEMOLISH THE BLDG,BACKFILL&GRADE.WORK TO COMMENCE IMMED UNDER CONSTANT SUPERVISION OF NYS PE&SITE SAFETY MANAGER DURING DEMO OPS.PROVIDE MEANS&METHODS.CONTRACTOR TO BE DEMO ENDORSED BY BEST
Jul 12, 2016 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FM.THE BLDG HAS NOT BEEN MAINTAINED.THE ROOF IS OPEN ALLOWING WATER INFILTRATION.THE STRUCTURE HAS SIGNIFICANTLY DETERIORATED.ADD'L COLLAPSE IS ANTICIPATED W/CONTINUAL DETERIORATION.THE BLDG IS A DANGER TO THE PUBLIC.REMEDY:FULLY DEMOLISH THE BLDG UNDER PERMIT.PERMIT TO BE PULLED BY 7/27/16.DEMOLITION TO COMMENCE NO LATER THAN 8/10/16
Jul 12, 2016 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL FM. A COLLAPSE OF THE MIDDLE 1/3 OF 247 W 34TH ST WAS REPORTED/CONFIRM ON 6/8/16.ADD'L THE BLDG IS OPEN,EXPOSED&SEVERELY DETERIORATED.REMEDY: PROVIDE ENGINEERING SIGNED&SEALED CONDITIONS REPORTS DOCUMENTING ANY CHANGES FROM THE CONDITIONS OBSERVED ON 6/8/16.REPORTS TO BE SUBMITTED EVERY 2WKS TO DOB W/FIRST REPORT SUBMITTED ON 7/25/16
Jun 24, 2016 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL FM ADDT'L INFO A PARTIAL COLLAPSE OF THE MIDDLE 1/3 OF THE BLDG WAS OBSERVED ON 06/08/16.ON 06/09/16 THE OWNER WAS INSTRUCTED TO IMMED EESTABLISH TRANSIT MONITORING POINTS AT THE EXTERIOR WALLS.OF 247 WEST 34TH ST&245 W 34TH ST.REMEDY:IMMED PROVIDE TRANSIT MONITORING AT BOTH 247 W 34TH ST&245 W 34TH ST
Dec 23, 2015 V*-DOB VIOLATION - DISMISSED EGNCY-EMERGENCY NONE FULL VACATE EXSISTS ON PROPERTY
Nov 24, 2015 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL BLDG IS 3S+C WOOD FRAMED W/BRICK MASONRY BEARING WALLS. BLDG IS FIRE DAMAGED W/COMPROMISED ROOF FRAMING AND EXPOSED TO THE ELEMENTS.2ND FLR FRAMING WAS PREVIOUSLY REMOVED TO CREATE A DOUBLE HGHT SPACE.THE STAIR BULKHEAD ABOVE ROOF IS SIGNIFICANTLY LEANING.REMEDY:IMMED DEMOLISH ALL HAZARDOUS CONDITIONS INCLUDING BUT NOT LIMITED TO THE BULKHEAD
Nov 18, 2015 V*-DOB VIOLATION - DISMISSED AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
Aug 14, 2013 V*-DOB VIOLATION - DISMISSED AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
Jan 2, 2013 V*-DOB VIOLATION - DISMISSED AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
Aug 7, 2012 V*-DOB VIOLATION - DISMISSED IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL
Feb 20, 2004 V-DOB VIOLATION - ACTIVE Z-ZONING NONE Z-ZONING NONE
Feb 4, 2004 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL C-CONSTRUCTION OTHER OPTIONAL
Sep 24, 1996 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL C-CONSTRUCTION OTHER OPTIONAL
Sep 24, 1996 V-DOB VIOLATION - ACTIVE Z-ZONING NONE Z-ZONING NONE