Manhattan Harlem (South)
243 West 116 Street, Manhattan
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
13 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Mar 14, 2025 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN.AT TIME OF INSPECTION,CHAIN LIKE FENCE INSTLLD ON PROP LINE@EXP4(EAST)COURTYRD&EGRESS PATH FOR REAR FIRE ESCAPES DISCHARGD TO SDWLK THROUGH A SDWLK HATCH,WHICH IS NOT CODE CMP.1.PRVDE CODE COMPLIANT EGRESS PATH UNDRP PRMT,2.REINSTATE OBTAIN NEW PRMT FOR WRK BY 519/25,3.CMPLTE WRK&SGN OFF PMTS |
| Mar 14, 2025 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN.BLDG SFFRD 2-ALARM FIRE ON 3/1425 &SUSTAIND STRCTRL DMG TO 2ND&3RDFL FRAMNG.APT2 ON 2NDFL HAS SEVERELY DMGD JOISTS &FL W/OPEN HOLES&PARTIAL CLLPSD AREAS.1.NYS PE STRCTRL ENG TO IMMED EVAL ENT BLDG&DSGN RPAIR,2.FILE FOR RPAIRS BY 5/19/25,3.OBTN PRTMS& STRT WRK BY 6/2/25 |
| Mar 14, 2025 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | EMERGENCY WORK.BLDG SFFRD A 2-ALARM FIRE ON 3/14/25&SUSTAIND STRCTRL DMG TO 2ND&3RDFL FRAMNG@EXP4 SIDE OF BLDG.FL JOISTS&FLOOR SEVERELY CHARRD@APT2X ON 2NDFL W/LOCAL AREAS OF PRTL CLLPS&OPEN HOLES.1.IMMED INSTLL TEMP SHORNG PER PE, 2.ALL WRK TO BE DRCTLY SPRVSD*DIRECTD BY ONSITE NYS PE STRCTRL ENG&PERFRMD BY DOB |
| Mar 14, 2025 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | STRUCTURE RENDERED NON-COMPLIANT DUE TO FIRE. AT TIME OF INSPECTION OBSERVED PREMISES WITH WINDOWS REMOVED AND EXTENSIVE SMOKE AND WATER DAMAGE THROUGHOUT WITH CHARRING TO STRUCTURAL MEMBERS AT 1ST AND 2ND STY LEVELS, ROOF OPEN TO THE ELEMENTS AT MULTIPLE LOCATIONS. EGRESS FROM REAR YARD TO STREET OBSTRUCTED AT THIS TIME. |
| Mar 14, 2025 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | STRUCTURE RENDERED NON-COMPLIANT. AT TIME OF INSPECTION DAMAGE OBSERVED TO HAVE BEEN SUSTAINED TO 1ST & 2ND FLOOR, SEVERE FIRE WATER & SMOKE DAMAGE ALONG WITH SEVERE CHARRING OF FLOOR JOIST AT 2ND FLOOR WITH PARTIAL COLLAPSE OF 2 FLOOR. |
| Mar 14, 2025 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | STRUCTURE RENDERED NON-COMPLIANT. AT TIME OF INSPECTION OBSERVED SEVERE CHARRING OF 2ND LEVEL FLOOR JOIST WHERE A SECTION HAS COLLAPSED DUE TO FIRE AT 1ST FLOOR COMMERCIAL SPACE. |
| Nov 21, 2019 | V*-DOB VIOLATION - Resolved | E-ELEVATOR ELEVATORREQUIRED | E-ELEVATOR ELEVATORREQUIRED |
| Feb 24, 2017 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT |
| Sep 29, 2006 | V-DOB VIOLATION - ACTIVE | E-ELEVATOR ELEVATORREQUIRED | E-ELEVATOR ELEVATORREQUIRED |
| Mar 16, 2005 | V-DOB VIOLATION - ACTIVE | E-ELEVATOR ELEVATORREQUIRED | E-ELEVATOR ELEVATORREQUIRED |
| Jan 31, 2005 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Sep 16, 1997 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Sep 1, 1994 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |