Manhattan West Village
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
9 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Jan 14, 2026 | V-DOB VIOLATION - ACTIVE | LANDMK-LANDMARK NONE | LANDMK-LANDMARK NONE |
| Jan 14, 2026 | V-DOB VIOLATION - ACTIVE | LANDMK-LANDMARK NONE | LANDMK-LANDMARK NONE |
| Jan 14, 2026 | V*-DOB VIOLATION - DISMISSED | LANDMK-LANDMARK NONE | LANDMK-LANDMARK NONE |
| Jan 14, 2026 | V-DOB VIOLATION - ACTIVE | LANDMK-LANDMARK NONE | LANDMK-LANDMARK NONE |
| Apr 27, 2022 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Feb 1, 2022 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN BUILDING IN A CODE-COMPLIANT MANNER. AT TIME OF INSPECTION, OBSERVED DAMAGE STAIR TREADS BETWEEN THE 3RD AND 4TH FLOORS ON BOTH THE LEFT AND RIGHT FIRE ESCAPES AT EXPOSURE #1. DAMAGED FIRE ESCAPES NON COMPLIANT TO CODE. |
| Jun 5, 2020 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | STRUCTURE RENDERED NON-COMPLIANT. AT TIME OF INSPECTION, POTENTIAL DAMAGE OBSERVED TO HAVE BEEN SUSTAINED TO REAR PATIO OF APT # 7 2ND FLOOR LEVEL DUE TO DEBRIS FALLING FROM ADJACENT BUILDING ( 240 W 10 ST.) CONSTRUCTION OPERATION AT 236 WEST 10 STREET MN. A PARTIAL VACATE ORDER ISSUED ON REAR PATIO OF APT # 7. |
| Nov 8, 2019 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT |
| Mar 18, 1993 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |