Manhattan SoHo-Little Italy-Hudson Square
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
5 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Sep 16, 2022 | V*-DOB VIOLATION - DISMISSED | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | INSTALL APPROXIMATELY 25 LINEAR FEET OF SIDEWALK SHED ALONG EXP#1(MOTT STREET) ADD ADDITIONAL 5 LINEAR FEET OF SIDEWALK SHED TO OVERLAP ADJACENT PROPERTIES TO SAFEGUARD THE PUBLIC AND PROPERTY.SECURE.LOOSE STONES OVER FRONT ENTRANCE |
| Sep 16, 2022 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MATTER: FACADE AT EXP-1 IS IN STATE OF DISREPAIR WITH CRACKS IN CONCRETE FINISHES AT 1ST AND SECOND FLOOR LEVEL, CRACKED CONCRETE WINDOW SILLS AT 3RS D FLOR AND CRACKED AND LOOSE CONCRETE FINISHES DIRECTLY OVER FRONT ENTRANCE IN DANGER OF FALLING TO BUSY SIDEWALK. |
| Dec 28, 2011 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Jan 3, 2008 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Jan 19, 2007 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |