2277 3 Avenue, Manhattan

DOB violations

Department of Buildings violations attached to this BIN or tax lot.

15 records

Date Status Type Summary
Sep 23, 2024 V*-DOB VIOLATION - DISMISSED LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION
Jun 30, 2023 V*-DOB VIOLATION - DISMISSED LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION
Apr 25, 2023 V*-DOB VIOLATION - DISMISSED LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION
Apr 15, 2023 V*-DOB VIOLATION - DISMISSED COMPBLD-STRUCTURALLY COMPROMISED BUILDING NONE FAILURE TO SUBMIT AN ACCEPTABLE INSPECTN RPT FOR STRUCTURALLY COMPROMISE
Jan 30, 2023 V*-DOB VIOLATION - DISMISSED IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL FULLY DEMOLISH THE 2277 3RD AVENUE BUILDING AND GRADE SITE.COORDINATE ALL WORK WITH FDNY BATTALION 12 (212-570-4312/4235) AND FIRE MARSHAL (718-281-8402) TO ASSIST WITH SEARCHES AND INVESTIGATIONS
Jan 30, 2023 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL EMER WORK ORDER.DUE TO 4ALARM FIRE ON 1/23/23,2ND FL ROOF&2NDFL PRTLLY CLLPDS APPRX 25 FTY.EXP4 CMU WALL UNBRCD @2ND FL TO ROOF.2ND,3RD,&ROOF JOISTS@REAR OF 3STORY BLDG FIRE DMGD.BLDG@RISK OF FRTHRCLLP. IMMED COMPLY WITH COMMISSIONER'S ORDER #341042 (012423FEU11101PN) DATED JANUARY 24,2023
Jan 24, 2023 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL EMER WRK ORDER.DUE TO 4ALARM FIRE ON 1/23/23,2ND FL PRTLLY CLLPSD APPX 25FT.EXP4 CMU WALL UNBRCD@2ND FL TO ROOF.2ND,3RD,&ROOF JOISTS@REAR OF 3STORY BLDG FIRE DMGD.BLDG@RISK OF FRTHR CLLPSE.OWNR TO IMMED:1.RTAIN NYSPE PE&GC ENDRSD FOR DEMO&ASBESTOS CNTRCTR,2.PRTLLY DEMO REAR EXT DOWN TO SAFE LVL,BRACE/SHORE
Jan 23, 2023 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL STRUCTURE RENDERED NON-COMPLIANT. PREMISES SUSTAINED DAMAGES DUE TO FIRE CAUSING EXTENSIVE SMOKE AND WATER DAMAGE THROUGHOUT WITH CHARRING TO STRUCTUAL MEMBERS AND PARTIAL COLLAPSE OF ROOF. VACATE FORTHWITH
Jan 23, 2023 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL FAILURE TO MAINTAIN BUILDING IN A A CODE COMPLIANT MANNER. AT TIME OF INSPECTION OBSERVED PARTIAL COLLAPSE OF ROOF OF COMMERCIAL STRUCTURE DUE TO FIRE.
Oct 1, 2015 V*-DOB VIOLATION - DISMISSED LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2014 INSPECTION REPORT
May 4, 1998 V*-DOB VIOLATION - DISMISSED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
Mar 18, 1994 V*-DOB VIOLATION - DISMISSED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
Mar 18, 1994 V*-DOB VIOLATION - DISMISSED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
Mar 18, 1993 V*-DOB VIOLATION - DISMISSED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
Mar 18, 1993 V*-DOB VIOLATION - DISMISSED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED