Manhattan Chelsea-Hudson Yards
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
8 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Feb 9, 2026 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER AS PER SEC.28 301.1 OF NYC ADMIN CODE. OBSERVED NUMEROUS CONDITIONS AT EXPOSURE ONE AS FOR DAMAGED WINDOW SILL AND WATER TABLES SPALLING STUCCOS AND CRACKS AND DETETERIORATION AT SEVERAL LOCATIONS. REMEDY: REPAIR AND/OR REPLACE |
| Nov 26, 2024 | V-DOB VIOLATION - ACTIVE | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Sep 18, 2024 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | OBSERVED EXTERIOR FRONT FACADE INSTATE OF DISREPAIR CONDITIONS INCLUDING DECORATIVE STONES CRACKS, SPALLING, SECTION MISSING, DETERIORATED THROUGHOUT ON EXPO # 01. ALSO OBSERVED LARGE STEP CRACKS ON EXTERIOR BRICKS WALL AT EXPO # 04 CENTER COURTYARD |
| May 17, 2022 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | STRUCTURE RENDERED NON COMPLAINT -FAILURE TO MAINTAIN 4TH FLOOR WINDOW LINTEL, SEMIDETACHED AND IN DANGER OF FALLING ONTO SIDEWALK AND WINDO W JAMS RATTLED THROUGHOUT |
| Feb 10, 1997 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Aug 29, 1995 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Mar 18, 1994 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Mar 18, 1993 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |