NYC Building Report

Manhattan Chelsea-Hudson Yards

223 West 24 Street, Manhattan

DOB violations

Department of Buildings violations attached to this BIN or tax lot.

100 records

Date Status Type Summary
Aug 3, 2023 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL ADDITIONAL INFORMATION.REQUEST TO SUSPERSEDE APPLICANT OF RECORD WAS FILED ON 6/2/23 AND APPROVED ON 7/12/23.CURRENT APPLICATION OF RECORD, FRUMA NAROV PE,SHALL PROVIDE ALL INSPECTION DATES&SGND&SEALD INSPECTION RPORTS SUMMARIZNG THE REQUEST FOR LETTER OF COMPLETION ISSUED ON 7/13/23 SUBMIT BY 8/17/23.EMAIL TO XCEL@BUILDINGS.NYC.GOV
Aug 3, 2023 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL ADDTIONAL INFORMATION.REQUEST TO SUPERSEDE APPLICANT OF RECORD WAS FILED ON 6/30/23 AND APPROVED ON 7/12/23.THE REQUEST FOR LETTER OF COMPLETION ISSUED ON 7/13/23 SUBMIT BY 8/17/23.EMAIL XCELO@BUILDINGS.NYC.GOV
Aug 3, 2023 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL ADDITIONAL INFORMATION.REQUEST TO SUPERSEDE APPLICANT OF RECORD WAS FILED ON 6/29/23&APPROVED ON 7/13/23.CURRENT APPLICANT OF RECORD,FRUMA NAROV PE,SHALL PROVIDE ALL INSPECTION DATES&SGND&SEALD INSPECTION REPORTS OR SUMMARIZNG THE REQUEST FOR LETTER OF COMPLETION ISSUED ON 7/20/23.SUBMIT BY 8/17/23.EMAIL XCELO@BUILDINGS.NYC.GOV
Jun 30, 2023 V*-DOB VIOLATION - DISMISSED LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION
Jun 30, 2023 V*-DOB VIOLATION - DISMISSED LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION
Apr 25, 2023 V*-DOB VIOLATION - DISMISSED LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION
May 13, 2022 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL BLDG CURRENTLY IN STATE OF STRUCT DISREPAIR. AT HALLWAYS,STAIRS,AND BATHROOMS THERE IS VISIBLE SAGGING,DISPLACEMENT, ANDDISREPAIR @ FLOORS FRAMING W/MEMBERS LOCALLY UNSUPPORTED/DISCONNECTED OWNER TO PROVIDE WEEKLY S/S REPORTS BY REGISTERED DESIGN PROFRESSION OF WORK PERFOMED AND CURRENT STRUCT CONDITION
May 13, 2022 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL BLDG CURRENTLY IN STATE OF STRUCT DISREPAIR. AT HALLWAYS,STAIRS AND AND BATHROOMS THERE IS VISIBLE SAGGING, DISPLACEMENT ANDDISREPAIR OF FLOOR FRAMING W/MEMEBERS UNSUPPORTED/DISCONNECTED OWNER TO PROVIDE WEEKLY S/S REPORTS BY REG DESIGN PROF OF WORK PERFORMED AND CURRENT STRUCT CONDITIONS OF BLDG
May 13, 2022 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL BLDG CURRENTLY IN STATE OF STRUCTURAL DISREPAIR.ATHALLWAYS,STARIS AND BATHROOMS. THERE IS VISIBLE SAGGING, DISPLACEMENT& DISREPAIR OF FLR FRAMING W/MEMBERS LOCALLY UNSUPPORTED/DISCONNECTED OWNER TO PROVIDE WEEKLY S/S REPORTS BY REG DESIGN PROF OF WORK PERFORMED AND CURRENT STRUCT CONDITION OF BLDG
Jan 13, 2022 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL ADD INFO REQUIRD-@ALL FLS,@HALLWAYS,STAIRS& BATHRM SAGGING &DISPLACE OF FL FRAMNG.SOME LOCATIONS FL FRAMNG MEMBRS NOT PROPERLY CONNECTD/ SUPPORTD.WRK BE DONE UNDR FULL TIME SUPERV PE &DAILY CONSTRCTN SUPER SUPERV.AMEND DRWG TO SHOW EXISTNG CONDITIONS &REPAIR REQUIRD
Jan 13, 2022 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL ADD INFO REQUIRD-@ALL FLS,@HALLWAYS,STAIRS& BATHRM SAGGING &DISPLACE OF FL FRAMNG.SOME LOCATIONS FL FRAMNG MEMBRS NOT PROPERLYCONNECTD/ SUPPORTD.WRK BE DONE UNDR FULL TIME SUPERV PE &DAILY CONSTRCTN SUPER SUPERV.AMEND DRWG TO SHOW EXISTNG CONDITIONS &REPAIR REQUIRD
Jan 13, 2022 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL ADD INFO RQUIRD-ALL FLS @HALLWAYS STAIRS &BATHROOM SAGGING &DISPLACE OF FL FRAMNG.SOME LOCATIONS FL FRAMNG MEMBRS ARE NOT PROPRLY CONNECTD/ SUPPORTD.WRK BE DONE UNDR FULL TIME SUPERV PE &DAILY CONSTRCTN SUPER SUPERV.AMEND DRWG TO SHOW EXISTNG CONDITIONS &REPAIR REQUIRD
Jan 5, 2022 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL ADD INFO REQUIRD-@ALL FLS,@HALLWAYS,STAIRS& BATHRM SAGGING &DISPLACE OF FL FRAMNG.SOME LOCATIONS FL FRAMNG MEMBRS NOT PROPERLY CONNECTED/ SUPPORTD.AT ALL FLS REMVE ALL FINSHES BATH,HALLWAYS&ADJ TO STAIR OPEN -EVALU CONDITN &CONNEC.AMEND DRWG-EXIST CONDITN &RPR REQUIRE
Jan 5, 2022 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL ADD INFO REQUIRD-@ALL FLS,@HALLWAYS,STAIRS& BATHRM SAGGING &DISPLACE OF FL FRAMNG.SOME LOCATIONS FL FRAMNG MEMBRS NOT PROPERLY.CONNECTED/ SUPPORTD.AT ALL FLS REMVE ALL FINSHES BATH,HALLWAYS&ADJ TO STAIR OPEN -EVALU CONDITN &CONNEC.AMEND DRWG-EXIST CONDITN &RPR REQUIRED
Jan 5, 2022 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL ADD INFO RQUIRD-ALL FLS @HALLWAYS STAIRS &BATHROOM SAGGING &DISPLACE OF FL FRAMNG.SOME LOCATIONS FL FRAMNG MEMBRS ARE NOT PROPRLY.CONNECTD/ SUPPORTD.AT ALL FLS REMVE ALL FINSHES BATH,HALLWAYS&ADJ TO STAIR OPEN- EVALU CONDITN &CONNEC.AMEND DRWG-EXIST CONDITN &RPR REQUIRD
Sep 24, 2021 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL EMERG WORK:RESID,SRO,W/SHARED PARTY WALL W/219+223 WEST 24 ST.AT FRONT OF BUILDING MISSING DRAIN ROOF LEADER IS DISCHARGING WATER TO THE FRNT FAÇADE.FRONT FACADE IS IN SEVERE DISREPAIR.IMMEDIATELY REPR DRAIN ROOF LEADR TO AVOID FURTHER DISREPAIR OF FRNT FACADE.ALL WRK TO BE PERFORMD UNDR THE CONTINUOUS SUPERVISION OF NYSPE ONSITE BY ENDORSED CONTRCTOR
Sep 24, 2021 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL EMERG WORK:RESID,SRO,W/SHARED PARTY WALL W/221 WEST 24 ST.AT FRONT OF BUILDING MISSING DRAIN ROOF LEADER IS DISCHARGING WATER TO THE FRONT FAÇADE.FRONT FACADE IS IN SEVERE DISREPAIR.IMMEDIATELY REPR DRAIN ROOF LEADER TO AVOID FURTHER DISREPAIR OF FRNT FACDE.ALL WRK TO BE PEFORMED UNDER CONTINUOUS SUPERVISION OF NYSPE ONSITE BY ENDORSED CONTRACTOR
Feb 3, 2021 V*-DOB VIOLATION - DISMISSED AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
Feb 3, 2021 V*-DOB VIOLATION - DISMISSED AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
Feb 3, 2021 V*-DOB VIOLATION - DISMISSED AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
Feb 3, 2021 V*-DOB VIOLATION - DISMISSED AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
Feb 3, 2021 V*-DOB VIOLATION - DISMISSED AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
Feb 3, 2021 V*-DOB VIOLATION - DISMISSED AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
Feb 3, 2021 V*-DOB VIOLATION - DISMISSED AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
Feb 3, 2021 V*-DOB VIOLATION - DISMISSED AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
Feb 3, 2021 V*-DOB VIOLATION - DISMISSED AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
Dec 30, 2020 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL EMERG WORK ORDR:SRO BLDG W/PRTY WALL @EXP2 OBS.SEVRE HAZ DEFECTS@FRNT FACADE AS FOLLOWS:OUTER SOLID MASN ARND FRNT DRAIN LEADR SEVRE DISRPR, WEATHERED&MORTAR MISS.BRCK WRK@FRNT FACDE PRSNTS DIAG/STEP/VERT CRCKS DNGR PUBL&ADJ PROP.IMMED HIRE NYSPE&CONTRCT TO RPR REPLACE FRNT FACDE ALL WORK PERFORMD UNDER CONTIN SUPERV PE.FILE JOB W/IN 2 DAYS OF WORK
Dec 30, 2020 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL EMGY WRK ORDER:SRO BLDG W/PRTY WALL @EXP4 OBS.SEVERE HAZ DEFECTS@FRONT FACADE AS FOLLOWS:SOLID MASN ARND FRNT DRAIN LEDR SEVRE DISRPR,WEATHER DISPL,BULG&MORTAR MISS.BRCK WRK@FRNT FACADE PRSNT DIAG/STEP/VERT CRKS PRESENTS DANGR PUBL&ADJ PROP.IMMED HIRE NYSPE&CONTRCTR TO REPR/REPLACE FRNT FAÇADE.ALL WRK PERFRMD UNDR CONTIN SUPERV PE.FILE JOB W/IN 2 DAYS
Dec 30, 2020 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL EMGY WRK ORD:SRO BLDG W/PRTY WALLS @EXP2&4.OBS.SEVRE HAZ DEFECTS@FRONT FACADE AS FOLLOWS:SOLID MASN ARND FRONT DRAIN LEADER SEVERE DISREPAIR, WEATHERED DISPL,BULG&MORTAR MISS.BRCK WRK@FRNT FACADE PRESNT DIAG/STEP VERT CRKS.DNGR PUBLC&ADJ PROP.IMMED HIRE NYSPE&CONTRCT TO REPR REPLACE FRNT FACDE.ALL WRK PERFORMD UNDR CONTIN SUPERV PE.FILE JOB W/IN 2 DAYS
Nov 12, 2020 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL EMERG WORK:SHARED PARTY WALL WITH 221 WEST 24 ST.WINDOWS AT FRONT AND REAR FACADE ARE OPEN/BROKEN WTR ENTERING INTER OF BLDG.AT FRNT OF BLDG DRAIN ROOF LEADER IMPROPER DISCHARGING WTR&AFFECT FRNT FAÇDE.IMMD SEAL ALL OPENGS@REAR&FRNT FACDE.RPR DRAIN ROOF LEADER TO AVOID FURTH DISRPR FRNT FACDE.ALL WRK BE PERF UNDR CONTIN SUPV NYSPE.FILE PRMT 2 BUSN DAY
Nov 12, 2020 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL EMERG WORK:SHARED PARTY WALL W/219&223 WEST 24 ST.WINDOWS AT FRONT AND REAR FACADE ARE OPEN/BROKEN WTR ENTERING INTER OF BLDG.AT FRNT OF BLDG MISSING DRAIN ROOF LEADER DISCHARGING WTER TO THE FRNT FAÇDE.IMMD SEAL ALL OPENGS@REAR&FRNT FACDE.RPR DRAIN ROOF LEADER TO AVOID FURTH DISRPR FRNT FACDE.ALL WRK BE PERF UNDR CONTIN SUPV NYSPE.FILE PRMT 2 BUSN DAY
Nov 12, 2020 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL EMERG WORK:SHARED PARTY WALL W/221 WEST 24 ST.WINDOWS @FRONT AND REAR FACADE ARE OPEN/BROKEN WATER ENTERING INTER OF BLDG.AT FRONT OF BLDG MISSING DRAIN ROOF LEADER DISCHARGING WTER TO THE FRNT FAÇDE.IMMD SEAL ALL OPENGS@REAR&FRNT FACDE.RPR DRAIN ROOF LEADER TO AVOID FURTH DISRPR FRNT FACDE.ALL WRK BE PERF UNDR CONTIN SUPV NYSPE.FILE W/IN 2 BUSN DAY
Nov 6, 2020 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL EMGY WRK:JOIST@ROOF 4TH,3RD,2ND,&1ST FLRS SEVERE DISRPR,SPLIT&EXCESSVE SAGGNG@BATHROMS&STAIR AREAS.STAIRS EXCESSVE LEAN&ROTATE AWAY FROM MASN BEAR WALLS.ALL AREAS STRCTLY COMPROM&UNABLE TO PROPERLY SUPPORT LOADS OWNER IMMED ENGAGE PE,LIC CONST SUPERINTENDENT&ENDORSE CONTR PROV TEMP SHORNG@AREAS IMPROPERLY SUPPRTD.SHORNG WRK CONT SUPV PE.FILE JOB 2DAYS
Nov 6, 2020 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL EMGY WRK:JOIST@ROOF 4TH,3RD,2ND,&1ST FLRS SEVERE DISRPR,SPLIT&EXCESSVE SAGGNG@BATHROMS&STAIR AREAS.STAIRS EXCESSVE LEAN&ROTATE AWAY FROM MASN BEAR WALLS.ALL AREAS STRCTLY COMPROM&UNABLE TO PROPERLY SUPPORT LOADS OWNER IMMED ENGAGE PE,LIC CONST SUPERINTENDENT&ENDORSE CONTR PROV TEMP SHORNG@AREAS IMPROPERLY SUPPRTD.SHORNG WRK CONT SUPV PE.FILE JOB 2DAYS
Nov 6, 2020 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL EMGY WRK:JOIST@ROOF 4TH,3RD,2ND,&1ST FLRS SEVERE DISRPR,SPLIT&EXCESSVE SAGGNG@BATHROMS&STAIR AREAS.STAIRS EXCESSVE LEAN&ROTATE AWAY FROM MASN BEAR WALLS.ALL AREAS STRCTLY COMPROM&UNABLE TO PROPERLY SUPPORT LOADS OWNER IMMED ENGAGE PE,LIC CONST SUPERINTENDENT&ENDORSE CONTR PROV TEMP SHORNG@AREAS IMPROPERLY SUPPRTD.SHORNG WRK CONT SUPV PE.FILE JOB 2DAYS
Jan 17, 2020 V*-DOB VIOLATION - DISMISSED IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL SEAL ROOF AND SKYLIGHTS
Jan 17, 2020 V*-DOB VIOLATION - DISMISSED IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL SEAL ROOF AND SKYLIGHTS
Jan 17, 2020 V*-DOB VIOLATION - DISMISSED IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL SEAL RPPF AND SKYLIGHTS
Aug 27, 2019 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL ADD'L INFO REQ.FTM:BLDG IN STATE OF DISREPAIR.FRNT WALL IS BULG@CORNER OF EXP1&4 FROM 1FL TO ROOF.REAR WALL BULG@CORNER OF EXP3&4 FROM 1FL TO ROOF.CRACK NOTED@THE EXP4 WALL DUE TO BULG&DISPLACED REAR WALL.OWNER ENGAGE PE&LIC SURVEYOR DEVELP MONITOR PROG FOR WHOLE BLDG FACADES.1ST SET NO LATER THAN 8/28/19.MINIMUM WEEKLY READINGS,NOTIFY DOB IF>1/8IN
Aug 27, 2019 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL ADD'L INFO REQ:FTM;4STY+C BUILDING IN A STATE OF DISREPAIR.THE FRONT WALL IS BULGING @CORNER OF EXPOSURE 1&2 FROM FIRST FLOOR TO ROOF.REAR WALL IS BULGING @CORNER OF EXP2 AND 3 FROM FIRST TO ROOF.OWNER ENGAGE PE&LIC SURVEYOR DEVELOP MONITOR PROGRAM FOR WHOLE BLDG FACADES.1ST SET NO LATER THAN 8/28/19.MINIMUM WEEKLY READINGS,NOTIFY DOB IF>1/8 IN
Aug 27, 2019 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL ADD'L INFO REQ:FTM;4STY+C BLDG IN STATE OF DISREPAIR.IT WAS OBSERVED ON FRNT FACADE STUCCO SPALLING IN SEVERAL LOCAT.CRACKED&SPALLED STUCCO DISPLACED BRICK THRU-OUT REAR WALL.DETERIOR MORTAR JOINTS OBSERVED AT CHIMNEY.OWN ENGAGE SURVEYOR DEVELP MONITOR PROG FOR WHOLE BLDG FACADE 1ST SET NO LATER THAN 8/28/19.MIN WKLY READINGS,NOTIFY DOB IF >1/8 IN
Jul 24, 2019 V*-DOB VIOLATION - DISMISSED AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
Jul 2, 2019 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL FAILURE TO MAINTAIN:4 STRY+C,WOOD FRAME,17'X48',SRO BUILDING,CURRENTLY IN A STATE OF DISREPAIR.IT WAS OBS.ON THE FRNT FACADE STUCCOSPALLING IN SEV LOCAT.CRACK&SPALLING STUCCO&DISPLACE BRICK OBS.THROUGHOUT REAR WALL.MISSING BRICK&DETER MORTAR JOINTS OBS@CHIMNEY.OWNR RETAIN PE TO PREPRE PLNS FOR REPRS&OBT PRMT N/L/THAN 8/26/19.WRK ST N/L/THAN 9/2/19
Jul 2, 2019 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL FAILURE TO MAINTAIN:4 STRY+C,WOOD FRAME,17'X48',SRO BUILDING CURRENTLY IN A STATE OF DISREPAIR.FRNT WALL IS BULGING&CORN OF EXP1&4 FROM 1FL TO ROOF.REAR WALL BULGING@CORN OF EXP3&4 FROM 1FL TO ROOF.CRACK NOTED@ EXP4 WALL DUE TO BULGING&DISPLACE REAR WALL.OWNR RETAIN LIC PE PREPARE PLNS FOR REPRS&OBT PRMT NO LATER THAN 8/26/19,WRK STRT N/L/THAN 9/2/19
Jul 2, 2019 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL FAILURE TO MAINTAIN:4 STRY+C,WOOD FRAME,17'X48',SRO BUILDING CURRENTLY IN A STATE OF DISREPAIR.THE FIRST FLR NEAR TO THE REAR WALL COLLAPSED THEREBY AFFECTING THE FLOORING STYSTEM.OWNER RETAIN A LIC PROFESSIONAL ENGINEER TO PREPARE PLANS FOR REPAIRS AND OBTAIN PERMIT NO LATER THAN 8/26/19.WORK TO START NO LATER THAN 9/2/19
Jul 2, 2019 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL FAILURE TO MAINTAIN:4 STRY+C,WOOD FRAME,17'X48'SRO BUILDING CURRENTLY IN STATE OF DISREPAIR.ROOF IS SAGGING DETERIORATED WITH EVIDENCE OF WATER PONDING IN SEVERAL LOCAT.OWNER TO RETAIN A LICENSED PROFESSIONAL ENGINEER TO PREPARE PLANS FOR REPAIRS AND OBTAIN PERMIT NO LATER THAN 8/26/19. WORK TO START NO LATER THAN 9/2/19
Jul 2, 2019 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL FAILURE TO MAINTAIN:4 STRY+C,WOOD FRAME,17'X48',SRO BUILDING,CURRENTLY IN STATE OF DISREPAIR.IT WAS OBSERVED THAT SEVERAL WOOD FLR JOIST ARE ROTTED AND SOME SPLIT DUE TO THE WATER DAMAGE & DETERIORATION ON EVERY FLR.OWNER TO RETAIN A LIC PROFESSIONAL ENGINEER TO PREPARE PLANS FOR REPR&OBT PRMT NO LATER THAN 8/26/19.WORK TO START NO LATER THAN 9/2/19
Jul 2, 2019 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL FAILURE TO MAINTAIN:4 STRY+C,WOOD FRAME,17'X48',SRO BUILDING,CURRENTLY IN A STATE OF DISREPAIR.THE FLOOR IS SAGGING DUE TO THE POOR CONDITION OF THE REMEDIAL WALL-DISCONTINUOUS IN CELLAR & OTHER FLOORS.OWNER TO RETAIN LICENSED PROFESSIONAL ENGINEER TO PREPARE PLANS FOR REPAIRS AND OBTAIN PERMIT NO LATER THAN 8/26/19.WORK TO START NO LATER THAN 9/2/19
Jul 2, 2019 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL FAILURE TO MAINTAIN:4 STRY+C,WOOD FRAME,17'X48',SRO BUILDING,CURRENTLY IN A STATE OF DISREPAIR.THE INTERNAL WOOD STAIR IS LEANING FROM 1ST TO 4TH FLOOR CREATING A HAZARD TO THE 1ST MEANS OF EGRESS.OWNER TO RETAIN A LICENSED PROFESSIONAL ENGINEER TO PREPARE PLANS FOR REPAIRS & OBTAIN PERMIT NO LATER THAN 8/26/19.WORK TO START NO LATER THAN 9/2/19
Jul 2, 2019 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL FAILURE TO MAINTAIN:4 STRY+C,WOOD FRAME,17'X48',SRO BUILDING CURRENTLY IN A STATE OF DISREPAIR.VERTICAL CRACK OBSERVED AT THE FOUNDATION WALL OF THE FRONT WALL.OWNER TO RETAIN A LICENSED PROFESSIONAL ENGINEER TO PREPARE PLANS FOR REPAIRS AND OBTAIN PERMIT NO LATER THAN 8/26/19,WORK TO START NO LATER THAN 9/2/19