Manhattan SoHo-Little Italy-Hudson Square
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
9 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Oct 10, 2023 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | EMERGENCY WORK ORDER DUE TO BUILDING MASONRY FACADE AT EXPOSURES#1,2,4 REMEDY:IMMEDIATELY TAKE AND PROVIDE SAFETY MEASURES TO SECURE AND PROTECT PUBLIC AND INSTALL PUBLIC PROTECTION@EXPOSURE#1,2,4 OF THE BUILDING.REMEDY:MAKE IMMEDIATE REPAIRS UNDER SUPERVISION OF LICENSED PROFESSIONAL AND REMOVE/SECURE ANY LOOSE/HANGING MATERIAL |
| Oct 6, 2023 | V-DOB VIOLATION - ACTIVE | FISPHAZ-HAZARDOUS CONDITION (FACADE) FACADE REQUIRED | CYCLE 9C UNSAFE REPORT FILED |
| Apr 8, 2021 | V*-DOB VIOLATION - Resolved | E-ELEVATOR ELEVATORREQUIRED | E-ELEVATOR ELEVATORREQUIRED |
| Jun 11, 2020 | V*-DOB VIOLATION - Resolved | E-ELEVATOR ELEVATORREQUIRED | E-ELEVATOR ELEVATORREQUIRED |
| Sep 15, 2017 | V*-DOB VIOLATION - DISMISSED | EVCAT1-ELEVATOR ANNUAL INSPECTION / TEST ELEVATORREQUIRED | VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2016 INSPECTION/TEST |
| Feb 19, 2016 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |
| Feb 19, 2016 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | CONSTRUCTION DOCUMENTS SHALL BE COMPLETE AND OF SUFFICIEANT CLARITY TO INDICATE THE PARTIAL DEMO AND TEMPORARY SHORING. DEFICIENCY: EXPS 2 & 4 WITH IMPROPERLY SHORED UNREINFORCED MASONRY AT TOP +/- 12' OF 4STORY SHELL OF ORIGINAL STRUCTURE. POTENTIAL COLLAPSE HAZARD. STOP ALL WORK AND MAKE SAFE. SUBMIT PLANS FOR REVIEW BY 2/22/16, FOR ALL UNDERWALLS |
| Mar 3, 2015 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT |
| Dec 31, 2009 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED |