Manhattan East Harlem (North)
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
30 records
| Date | Status | Type | Summary |
|---|---|---|---|
| May 29, 2026 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER. NOTED AT THE TIME OF INSPECTION, OBSERVED SPALLING STUCCO AND EXPOSED MASONRY AND CRACK ON STUCCO AT EXPOSURE 2. REMEDY: REPAIR AND/OR REPLACE |
| Oct 3, 2024 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | EMERGENCY WORK ORDER DUE TO CRACK/MISSING PRE CAST COPING STONE AT EXP 1 PARAPET WALL & DEFECT AT SOUTH WEST CORNER PARAPET AREA INCLUDIN SPALLING STUCCO & DISPLACE BRICK WORK. REMEDY: IMMEDIATELY INSTALL SIDE WALK SHED FULL LENGTH OF EXPOSURE 1 SOUTH ELEV. MAKE REPAIRS UNDER SUPERVISION OF NYC LICENSED PROFESSIONAL |
| Oct 3, 2024 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER: OBSERVED CRACK/ MISSING PRECAST COPING STONE AT PARAPET INCLUDING SPALLING STUCCO AND DISPLCE BRICK WORK AT SOUTH WEST CORNER. REMEDY: REPAIR AND/OR REPLACE |
| Sep 21, 2023 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | EMERGENCY WORK ORDER DUE TO HAZARDOUS CONDITION OBSERVED ON EXP#1,2,&4 CONDITION SUCH AS CRACKED DETERIORATED MASONRY STONES SILL EYEBROWE.MI MISSING WINDOWS ON EXP#1&4 EXPOSURE#2 WEST ELEVATION BROKEN PROTECTIVE NETTING AROUND PIPE SCAFFOLDING.REMEDY:OWNER MUST IMMEDIATELY REPAIR DAMAGE FACADE,CLOSE AL OPEN WINDOW OPENING REPAIR BROKEN NETTING |
| Sep 21, 2023 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER:AS NOTED AT TIME OF INSPECTION OBSERVED ON EXP#1 SOUTH ELEVATION CRACKS&SPALLING SILLS &STONES/EYEBROWS AT SEVERAL LOCATIONS & FLOORS EXP#4 EAST ELEVATION DAMAGED MORTAR JOINTS IN BRICK WORK REMEDY:MAINTAIN BUILDING IN CODE COMPLIANT MANNER,REPAIR & OR REPLACE |
| May 23, 2023 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.OBSERVED SPALLING/SPALLED BRICKS WINDOW LEDGES AND CONCRETE LINTELS ABOVE WINDOWS,AT EXP#1 ALL WINDOWS ARE BOARDED UP WITH PLY WOOD.REMEDY: REPAIR AND/OR REPLACE |
| Apr 25, 2023 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION |
| Feb 15, 2023 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER:AT TIME OF INSPECTIONS.OBSERVED & DETERIORATION OF CONDITIONS:DAMAGED STONE, SPALLING,MISSING BRICKS AND DAMAGED MORTAR JOINTS AT VIEW ELEVATIONS EXPOSURE#1&EXPOSURE#4.REMEDY:MAINTAIN BULDING/REPAIR&OR REPLACE |
| Feb 6, 2023 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | ADDITIONAL INFORMATION:CURRENTLY EXISTING STRUCTURE AT 21 EAST 115TH ST,MN HAD TEMPORARY SHORING INSTALLED FROM GROUND FLOOR TO ROOF ON 5/25/2022. REMEDY:THE OWNER TO SUBMIT S/S MONTHLY STTRUCTURE STABILITY REPORTS BY A NYSPE TO THE DEPARTMENT. THE FIRST STRUCT STABILITY REPRT TO BE SUBMITTED NO LATER THAN 02/17/2023 BY SUBSEQUENT REPORTS |
| Aug 5, 2022 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FAIL TO COMPLY W/COMMISSIONER'S ORDER DOB VIO#063022CEU11101PW (COMPLAINT#1613062)ISSUED ON 6/30/22 ORDERED 115 SNV ASSOCIATES LLC TO OBTN WORK PRMT FOR PRMANENT REPAIR OF WHOLE BLDG STRUCTURE DTRIORATED NO LATER THAN 7/31/22.AS OF 8/5/2022,THE WRK PRMT HAS NOT BEEN OBTAIND COMPLY W/COMMISSIONER'S ORDER AND CODE |
| Jul 11, 2022 | V*-DOB VIOLATION - DISMISSED | UB-UNSAFE BUILDINGS NONE | UB-UNSAFE BUILDINGS NONE |
| Jun 30, 2022 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FTM BUILDING ROOF & FLOOR ARE TEMPORARILY SHORED AT EVERYFLOOR DUE TO EXTENSIVELY DEFLECTED & DETERIORATED FLOOR WOOD JOINTSTHE LOAD BEARING WALLS AT EXP2,3,4 WERE OBSERVD W/DISLODGED BRICKS OWNER TO OBTAIN THE WORK PERMIT FOR PERMANENT REPAIR OF THE WHOLE BLDG STRUCTURE NO LATER THAN 7/31/2022 |
| Jun 30, 2022 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FTM BUILDING ROOF AND FLOOR ARE TEMPORARILY SHORED @ EVERYFLOOR DUE TO EXTENSIVELY DEFLECTED & DETRIORATD FLOOR WOOD JOINTSTHE LOAD BEARING WALLS AT EXP2,3,4 WERE OBSERVD W/DISLODGED BRICKS OWNER TO OBTAIN THE WORK PERMIT FOR PERMANENT REPAIR OF THE WHOLE BLDG STRUCTURE NO LATER THAN 7/31/2022 |
| May 24, 2022 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | EMERGENCY WORK ORDER-THE FOLLOWING WORKS NEED TO BE DONE IMMED UNDER SUPERVISION OF NYSPE-PROVIDE TEMP SHORING TO FLOOR JOIST AT MID SPAN ALL FLOORS, FRONT TO BACK ALL THE WAY DOWN TO CELLAR. PROVIDE TEMP CONSTRUCT RAIL AT ROOF. COVER WINDOWS & HOLES IN FLOORS. REMEDY: WORK T/BE PERFORMED UNDER CONTINUOUS SUPERV OF NYSPE.SHORING JOB T/BE FILED |
| Nov 8, 2019 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT |
| Apr 6, 2018 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT |
| Sep 13, 2017 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |
| Feb 24, 2017 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT |
| Jun 1, 2016 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Oct 1, 2015 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2014 INSPECTION REPORT |
| Sep 21, 2015 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | BORO-COMM |
| Jun 3, 2015 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Jun 3, 2015 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Jun 3, 2015 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Mar 4, 2015 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | 5 STORY OLT UNDER EXTENSIVE RENOVATION. THE CONTRACTOR HAS REMOVED ALL PARTITION,FLOORS CEILING ETC & THE ROOF IS FULL OF RAIN WATER, ICE & SNOW. THE STRUCTURE IS INSTABLE.IMMEDIATELY ENGAGE LICENSED PE FOR DESIGN,SITE SUPERVISION.INSTALL STRUCTURAL SHORES FROM 2TH FL TO UNDER SIDE OF ROOF PROP ALL FLOOR JOIST.FILE & PERMIT ALL WORK |
| Mar 1, 2013 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2011 INSPECTION REPORT |
| Dec 13, 2011 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2010 INSPECTION REPORT |
| Jan 1, 2009 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Jan 3, 2008 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Sep 1, 1994 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |