Date Status Type Summary
Oct 4, 2023 V-DOB VIOLATION - ACTIVE AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
Oct 4, 2023 V-DOB VIOLATION - ACTIVE AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
Aug 12, 2023 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL STRUCTURE RENDERED NON COMPLIANT DUE TO VEHICLE IMPACT. NOTED: SIDEWALK SHED ERECTED UNDER ACTIVE PERMIT #M00824476-I1-SH IS LEANING WITH DISPLACED COLUMNS, BEAMS, DECK AND PARAPET PANELS DUE TO VEHICLE IMPACT.
Feb 22, 2023 V-DOB VIOLATION - ACTIVE FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023
Feb 2, 2023 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL EMERGENCY WORK ORDER DUE TO DEFECTIVE FACADE@EXPOSURES 1&2(SOUTH&WEST ELEVATIONS)AT THE CORNEREDGE BUILDING OBSERVED SPALLING?PEELING OFF/CR CRACK STUCCO AND TILE IN SEVERAL LOCATIONS WITHOUT ANY SAFETY MEASURES REMEDY IMMEDIATLY PROVIDE SAFETY MEASURES AT EXPO#1&2 (SOUTH&WEST ELEV ATIONS)TO SEURE / PROTECT THE PUBLIC
Feb 2, 2023 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL EMERGENCY WORK ORDER DUE TO DEFECTIVE FACADE AT EXPOSURE 1&2 (SOUTH&WEST.ELEVATION A7
Oct 4, 2021 V-DOB VIOLATION - ACTIVE E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
Jun 10, 2021 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FAILURE TO COMPLY. ON 10/11/19 COMMISSIONER'S ORDER 101119CLL10701OS WAS ISSUED TO OWNER TO HAVE 100% OF BUILDING FACADE INSPECTED BY A QEWI. AS OF 06/07/21 OWNER HAS NOT COMPLIED WITH IMMED CURE ORDER REMEDY: IMMED COMPLY WITH CODE AND COMMISSIONER'S ORDER
Jan 6, 2021 V*-DOB VIOLATION - DISMISSED AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
Jan 6, 2021 V*-DOB VIOLATION - DISMISSED AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
Jan 6, 2021 V*-DOB VIOLATION - DISMISSED AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
Jan 6, 2021 V*-DOB VIOLATION - DISMISSED AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
Jan 9, 2020 V*-DOB VIOLATION - DISMISSED AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
Jan 9, 2020 V*-DOB VIOLATION - DISMISSED AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
Oct 22, 2019 V*-DOB VIOLATION - DISMISSED IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL PROVIDE A SIDEWALK SHED THE FULL WIDTH OF THE BUILDING AT EXP#1 WITH AN ADDITIONAL APPROX.5' ON EACH SIDE FOR TOTAL LENGTH OF 35 LINEAR FT
Oct 11, 2019 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL ON 10/11/19 PEICES OF FACADE PANEL FELL TO THE STREET REMEDY: OWNER TO IMMED RETAIN A NYS LIC PROFESSIONAL TO EVALUATE STREET FACADE. IMMED INSPECT 100% HANDS ON ENTIRE SITE PROVIDE ENG'R REPORT AND REPAIR DRAWINGS BY 11/11/19. INSTALL PUBLIC PROTECTION ON ENTIRE PERIMETER OF BUILDING TO PROTECT PEDESTRIANS.FILE AN PERMIT