Manhattan East Village
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
51 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Nov 14, 2025 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION |
| Aug 8, 2025 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | STRUCT PEER REVIEW:EXP2 WALL ADJ TO NYC PARK PROP HAD OUTER WYTHE REMOVED&INADEQUATELY REPLACED.VARIOUS STRUCT DEFECTS THROUGHOUT INT& EXT NOTED IN FEU VIOLATIONS.IMMED COMPLY WITH COMMISSIONER'S ORDER #342065, VIOLATION 042425FEU10302FF DATED APRIL 24, 2025 |
| Aug 8, 2025 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | STUCT PEER REVIEW:EXP2 WALL ADJ NY NYC PARKS PROP HAS OUTER WYTHE REMOVED&INADEQUATELY REPLACED.VARIOUS STRUCT DEFECTS THROUGHOUT IN&EXT NOTED IN FEU VIOLATIONS.IMMED COMPLY W/COMMISSIONER'S ORDER #342064, VIOLATION 042425FEU10301FF DATED APRIL 24, 2025 |
| Apr 24, 2025 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | STRUCT PEER REVIEW:EXP2 WALL ADJ NY NYC PARKS PROP HAD OUTER WYTHE REMOVED&INADEQUATELY REPLACED.VARIOUS STRUCT DEFECTS THROUGHOUT INT& EXT NOTED IN FEU VIOLATIONS.ONWER TO PROVIDE NAMES OF(3)REPUTABLE NYSPE'S W/KNOWLEDGE &EXPERIENCE REPAIRING SIMILAR STRUCT BY MAY 9 2025 |
| Apr 24, 2025 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | STRUCT PEER REVIEW:EXP2 WALL ADJ TO NYC PARK PROP HAD OUTER WYTHE REMOVED&INADEQUATELY REPLACED.VARIOSU STRUCT DEFECTS THROUGHOUT INT& EXT NOTED IN FEU VIOLATIONS.OWNER TO PROVIDE NALES OF(3)REPUTABLE NYSPE'S W/KNOWLEDGE &EXPERIENCE REPAIRING SIMILAR STRUCT BY MAY 9 2025 |
| Apr 4, 2025 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | APPROVAL AND PERMIT#M08025026-I1 ARE HEREBY REVOKED. |
| Mar 18, 2025 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN BUILDINGS IN CIGE COMPLIANT MANNER AT TIME OF INSP ECTION OBSERVED A VERTICAL CRACK 1/1/2"X4' LOCATED AT REAR FLOOR WINDO W TO PARAPET |
| Nov 8, 2024 | V*-DOB VIOLATION - DISMISSED | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | REMEDY: IMMEDIATLEY INSTALL TEMPORARY SHORING AT CELLAR ALONG FULL LENGTH OF THE BUILDING AS FOLLOWS: A)TEMP SHORE (2) INTERIOR RELIEVING WALLS: B) TEMP SHORE 1ST FLOOR FRAMING ALONG EXPOSURE 2 AND 4 WALLS COORDINATE SHORING UNDER IED AT 207 AVE B |
| Nov 8, 2024 | V*-DOB VIOLATION - DISMISSED | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | REMEDY: IMEDIATLY INSTALL TEMPORARY SHORING AT CELLAR ALONG THE FULL LENTH OF THE BUILDING AS FOLLOWS: A) TEMP SHORE (2) INTERIOR RELIEVING WALLS: B)TEMP SHORE 1ST FLOOR FRAMING ALONG EXPOSURE 2 AND 4 WALLS CORDINATE SHORING WITH SHORING UNDER IED AT 207 REAR AVE. B |
| Nov 7, 2024 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | EMERGENCY WORK ORDER.UNPERMITTD/NON-ENGINEERD SHORNG&1STFL FRAMNG INSTALLD.VARIOUS 1STFL JOISTS CRACKD,SAGGNG,&INADEQUATELY ONE EXP2 FDN.1STFL STRUCTURE COMPROMISED.IMMEDIATELY COMPLY WITH COMMISSIONER'S ORDER 3341764 (101324FEU10302PN) DATED OCTOBER 31, 2024 |
| Nov 7, 2024 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | EMERGENCY WORK ORDER.UNPERMITTD NON-ENGINEERD STEEL GIRDERS INSTALLD ADJ TO GIRDER W/INADEQUATE JOIST BEARNG@APPRX 50% OF JOIST VARIOUS 1ST FL JOIST CRACKD,SAGGNG,&INADEQUATELY BEARNG ON EXP4 FDN.IMMEDIATELY COMPLY WITH COMMISSIONER'S ORDER #341763 (103124FEU10301PN) DATED OCTOBER 31, 2024 |
| Oct 31, 2024 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN BLDG IN A SAFE CONDITION.1STFL FRAMING SEVERELY DETERIORATD EXP4 SIDE CELLAR GIRDER BELOW RELIEVING WALL PARTIALLY FAILED,CRCKD,&SAGGNG.STEEL GIRDER INSTALLD ADJ TO GIRDER.OWNR TO RTAIN NYSPE TO EVAL ENT BLDG&FILE RPAIR DWGS.BLDG TO PERM RPARD UNDR PRMT STRTNG BY 12/9/24&CMPLTD/SGND OFF 1/17/25 |
| Oct 31, 2024 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | EMERGENCY WORK ORDER.UNPERMITTD NON-ENGINEERD STEEL GIRDER INSTALLD ADJ TO GIRDER W/INADEQUATE JOIST BEARNG@APPRX 50% OF JOIST VARIOUS 1ST FL JOIST CRACKD,SAGGNG,&INADEQUATELY BRARNG ON EXP4 FDN.IMMEDIATELY COMPLY WITH COMMISSIONER'S ORDER #341763 (103124FEU10301PN) DATED OCTOBER 31, 2024 |
| Oct 31, 2024 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN BLDG IN A SAFE CONDITION.UNPERMITTED/NON-ENGINEERD SHORNF/SCREW JACKS&1STFL JOISTS DETERIORATD,CRCKD,SAGGNG,&INADEQUATE BEARNG FDN WALL.OWNR TO RTAIN NYSPE TO EVAL ENT BLDG&FILE RPAIR DWGS BLDG TO BE PERM RPAIRD UNDR PRMT STRTNG BY 12/9/24&CMPLTD&SGND OFF |
| Oct 31, 2024 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | EMERGENCY WORK ORDER.UNPERMITTD/NON-ENGINEERD SHORNG&1STFL FRAMNG INSTALLD.VARIOUS1STFL JOISTS CRACKD,SAGGNG,&INADEQUATELY ONE EXP2 FDN 1STFL STRUCTURE COMPROMISED.IMMEDIATELY COMPLY WITH COMMISSIONER'S ORDER #341764 (103124FEU10302PN) DATED OCTOBER 31, 2024 |
| Sep 19, 2024 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN IN A SAFE CONDITION.EXP2 12IN LOAD BEARNG WALL WAS STRUCT CMPRMSD DUE TO OUTER WYTHE RMVD&INADEQUATELY RPLACD W/O PROPERTIES/LATERAL CONNCTNS;IMPROPR AIR GAP/MORTAR.IMMEDIATELY COMPLY WITH COMMISSIONER'S ORDERS 341652 (073124FEU10301PN) DATED 7/31/2024 |
| Sep 19, 2024 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN BLDG IN SAFE CONDITION.EXP2 BRCK WALL HAD OUTER WYTHE RMVD&RPLACD W/INADEQUATE MORTAR FILL.12"STRCTRL LOAD BEARNG WALL HA BEEN STRCTRL.IMMEDIATELY COMPLY WITH COMMISSIONER'S ORDERS 341652 (073124FEU10301PN) DATED 7/31/2024 |
| Jul 31, 2024 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN BLDG IN A SAFE CONDITION.EXP2 12IN LOAD BEARNG WALL STRUCT CMPRMSD DUE TO OUTER WYTHE RMVD&INADEQUATELY RPLACD W/O PROPERTIES/LATERAL CONNCTNS;IMPROPR AIR GAP/MORTAR.OWNR TO RTAIN NYSPE TO EVAL ENT BLDG&FILE RPAIR DWGS.BLDG TO BE RPAIRD UNDR PRMT STRTNG BY 9/17/24&CMPLTD/SGND OFF 11/22/24 |
| Jul 31, 2024 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN BLDG IN A SAFE CONDITION.EXP2 BRCK WALL HAS OUTER WYTHE RMVD&REPLACED W/INADEQUATE LATERAL TIES/CONNECTIONS,AIRGAP, INADEQUATE MORTAR FILL.12"STRCTRL LOAD BEARNF WALL HAS BEEN STRCTRL OWNR TO RTAIN NYSPE TO EVAL ENT BLDG&FILE RPAIR DWGS.BLDG TO BE RPAIRD UNDR PRMT STRTNG BY 9/16/24&CMPLTD/SGND OFF 11/22 |
| Nov 22, 2023 | V-DOB VIOLATION - ACTIVE | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Sep 21, 2023 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |
| Sep 21, 2023 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | COMPROMISED BULKHEAD AND FACADE.PROVIDE ENGINEERS REPORT FOR BULKHEAD & FACADE & COMPLY WITH PREVOUSLY ISSUED VIOLATION 021016CFEU10301PS |
| Jun 30, 2023 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION |
| Jun 20, 2023 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION |
| Mar 30, 2022 | V-DOB VIOLATION - ACTIVE | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Mar 2, 2022 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Jan 19, 2022 | V-DOB VIOLATION - ACTIVE | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Oct 27, 2021 | V-DOB VIOLATION - ACTIVE | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Jun 26, 2019 | V-DOB VIOLATION - ACTIVE | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Jun 26, 2019 | V-DOB VIOLATION - ACTIVE | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Nov 14, 2018 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Jul 25, 2018 | V-DOB VIOLATION - ACTIVE | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| May 16, 2018 | V-DOB VIOLATION - ACTIVE | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Apr 4, 2018 | V-DOB VIOLATION - ACTIVE | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Feb 7, 2018 | V-DOB VIOLATION - ACTIVE | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Nov 15, 2017 | V-DOB VIOLATION - ACTIVE | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Mar 10, 2017 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | THE BOROUGH COMMISSIONER HAS ORDERED ALL WORK STOPPED FOR APPLICATION #122760333. CONTRACTOR OF RECORD HAS WITHDRAWN AS PERMIT HOLDER. STOP ALL WORK IMMEDIATELY AND MAKE SITE SAFE/CONTACT DOB OFFICE |
| Oct 5, 2016 | V-DOB VIOLATION - ACTIVE | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Jun 15, 2016 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| May 4, 2016 | V-DOB VIOLATION - ACTIVE | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Feb 10, 2016 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FM. EXP#2 WALL APPEARS A PARTY WALL SHARED W/DEMOLISHED BLDG LOCATED @ 600 EAST 3 STREET.THE WALL IS DETACHING FROM BLDG EVIDENCE BY CRACKS IN FRONT WALL & REAR WALL.NO WALL TIES ARE OBSEVERED. WALL CRACKED AND PARTIALLY COLLAPSED ROOF BULKJEAD IS LEANING. REMEDY:OWNER TO IMMED HAVE NYSPE TO EVAL ENTIRE BLDG.START WRK UNDER PERMIT NO LTR 2/25/2016 |
| Oct 1, 2015 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2014 INSPECTION REPORT |
| Mar 3, 2015 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT |
| Dec 13, 2011 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2010 INSPECTION REPORT |
| Jan 1, 2009 | V-DOB VIOLATION - ACTIVE | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Jan 3, 2008 | V-DOB VIOLATION - ACTIVE | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| May 4, 1998 | V-DOB VIOLATION - ACTIVE | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Sep 1, 1994 | V-DOB VIOLATION - ACTIVE | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Feb 2, 1992 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |
| Feb 2, 1992 | VP-VIOLATION UNSERVED ECB-ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |