DOB violations

Department of Buildings violations attached to this BIN or tax lot.

149 records

Date Status Type Summary
Jul 20, 2026 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL EMERGENCY WORK ORDER DUE TO DISPLACED CAVITY WALL BRICK. ROOF PROTECTION IS REQUIRED TO PROTECT PUBLIC & PROPERTY FROM DOCUMENTED UNSAFE CONDITIONS. REMEDY: IMMEDIATELY TAKE/PROVIDE ADEQUATE SAFETY MEASURES PROTECTION AT ADJACENT PROPERTY. ALSO MAKE IMMED ADJACENT REPAIRS TO UNSAFE FACADE CONDITIONS U/FULL SUPV OF NYS LICENSED PROFES
Mar 26, 2026 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANNER. EXP1 CRACKS IN BRICKWORK & CRACK WINDOW PANE AT MULT LOC. EXP2-MULTIPLE CRACKED WINDOW PANES. EXP3-MISSING COPING METAL ON ROOF PARAPET & SPALLING BRICK.EXP4-CRACKS ON SETBACK PARAPET @ 8TH&9TH FLS,DAMAGED WINDOW SILLS,BROKEN WINDOW PANE @ MULT LOC. REMEDY: REPAIR AND/OR REPLACE
Dec 23, 2025 V*-DOB VIOLATION - DISMISSED IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL REMEDY: IMMEDIATELY RE-INSTALL SIDEWALK. INSTALL APPROXIMATELY.100' LINEAR FEET OF SIDEWALK SHED AT.EXPOSURE # 1 WEST ELEVATION (3RD AVENUE) AND INSTALL APPROXIMATELY 235' LINEAR FEET OF SIDEWALK.SHED AT EXPOSURE # 4 SOUTH ELEVATION (EAST 58TH STREET)
Dec 18, 2025 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FTM BLDG. OBSERVED ON EXP 1 W.ELEV: CRACKS IN BLOCK WORK @ MULTI FLRS, BROKN WINDOWPANES @ MULTI FLRS. EXP 2 N.ELEV; SPALLED SILLS & BROKN WINDOWPANES @ MULTI FLRS.EXP 3 E.ELV:DAMAGD SPALLD MORTAR JOINTS ON 18 FL & @ PARAPET: CRACKD WINDOWPANE ON 7FL. EXP 4 S.ELEV: CRACKD &SPAL -LIN BRICKWORK ON MULTI FLRS.REMDY:REPAIR/REPLACE DAMAGD FACADE/APPURT
Dec 18, 2025 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL EMERGENCY WORK ORDER DUE TO UNSAFE CONDITIONS ON FACADE & NOTIFICATION BY SIDEWALK SHED CONTRACTOR TO DOB THAT SIDEWALK SHED WILL BE REMOVED WITHOUT OWNER PERFORMING FACADE REPAIRS. REMEDY:OWNER TO ARRANG FOR RE INSTALLATION OF SIDEWALK SHED U/DIRECTION OF A RDP @ ALL PUBIC RIGHT OF WAYS. NO LAPSE IN TIME BETWEEN OLD SHED BEING REMOVED
Sep 2, 2025 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. OBSERVED CRACKED WINDOW PANE AT MULTIPLE LOCATIONS, DEFECT AT WINDOW LINTELS, DAMAGED WINDOW SILL AT EXPOSURE 2 ALSO CRACKS. EXPOSURE 4 CRACK AT 9FL SETBACK ROOF AREA: DEFECT AT COOLING TOWER WALL, CRACK AT BULKHEAD AND SPALLING AT PARAPET WALL. REMEDY: REPAIR AND OR REPLACE
Apr 1, 2024 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL VIO24-50343
Feb 22, 2024 V-DOB VIOLATION - ACTIVE FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024
Apr 10, 2021 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL OBSERVED BROKEN WINDOW ON 1ST AND MINOR MASOMRY DAMAGE AT FIRST FLOOR LEVEL DUE TO VEHICLE INPACTING IT
Apr 10, 2021 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL OBSERVED APPROXIMATELY 60 LINEAR FEET OF SWS DISPALCING AND COLLAPSING ON TO THE PUBLIC SIDEWALK AND STREET DUE TO VEHICLE IMPACT
Jan 23, 2021 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL DUE TO VEHICLE IMPACTING SHED. AT TIME OF INSPECTION A VEHICLE DROVE INTO A SIDEWALK SHED DAMAGING AND DISPLACING APPROXIMATELY 50 PERCENT OF SHED AND CAUSING NON STRUCTURAL DAMAGE TO BUILDING
Sep 6, 2019 V*-DOB VIOLATION - DISMISSED ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST
Sep 3, 2019 V-DOB VIOLATION - ACTIVE LL2604S-SPRINKLER NONE FAILED TO FILE FINAL SPRINKLER REPORT BY JULY 1, 2019
Aug 7, 2019 V-DOB VIOLATION - ACTIVE AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
May 20, 2019 V-DOB VIOLATION - ACTIVE EVCAT5-NON-RESIDENTIAL ELEVATOR PERIODIC INSPECTION/TEST ELEVATORREQUIRED FAILURE TO PERFORM CATEGORY 5 INSPECTION
May 8, 2019 V-DOB VIOLATION - ACTIVE FISP-FACADE SAFETY PROGRAM FACADE REQUIRED FISP-FACADE SAFETY PROGRAM FACADE REQUIRED
Apr 30, 2019 V-DOB VIOLATION - ACTIVE FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED FAILED TO FILE FISP CYCLE 8C TECHNICAL REPORT BY 02/21/2019
Apr 5, 2019 V-DOB VIOLATION - ACTIVE EVCAT1-ELEVATOR ANNUAL INSPECTION / TEST ELEVATORREQUIRED VIOLATION ISSUED TO ELEVATOR - FAILURE TO FILE CATEGORY 1 2017 INSPECTION/TEST
Apr 3, 2019 V-DOB VIOLATION - ACTIVE E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
Apr 1, 2019 V-DOB VIOLATION - ACTIVE E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
Apr 1, 2019 V-DOB VIOLATION - ACTIVE E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
Apr 1, 2019 V-DOB VIOLATION - ACTIVE E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
Apr 1, 2019 V-DOB VIOLATION - ACTIVE E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
Apr 1, 2019 V-DOB VIOLATION - ACTIVE E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
Apr 1, 2019 V-DOB VIOLATION - ACTIVE E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
Apr 1, 2019 V-DOB VIOLATION - ACTIVE E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
Jan 26, 2018 V*-DOB VIOLATION - DISMISSED ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST
Jan 26, 2018 V*-DOB VIOLATION - DISMISSED ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST
Jan 26, 2018 V*-DOB VIOLATION - DISMISSED ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST
Jan 26, 2018 V*-DOB VIOLATION - DISMISSED ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST
Jan 26, 2018 V*-DOB VIOLATION - DISMISSED ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST
Jan 26, 2018 V*-DOB VIOLATION - DISMISSED ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST
Jan 26, 2018 V*-DOB VIOLATION - DISMISSED ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST
Jan 26, 2018 V*-DOB VIOLATION - DISMISSED ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST
Sep 15, 2017 V*-DOB VIOLATION - DISMISSED EVCAT1-ELEVATOR ANNUAL INSPECTION / TEST ELEVATORREQUIRED VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2016 INSPECTION/TEST
Sep 15, 2017 V*-DOB VIOLATION - DISMISSED EVCAT1-ELEVATOR ANNUAL INSPECTION / TEST ELEVATORREQUIRED VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2016 INSPECTION/TEST
Nov 14, 2016 V*-DOB VIOLATION - DISMISSED ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2014 CAT 1 INSP/TST
Nov 14, 2016 V*-DOB VIOLATION - DISMISSED ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2014 CAT 1 INSP/TST
Nov 14, 2016 V*-DOB VIOLATION - DISMISSED ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2014 CAT 1 INSP/TST
Nov 14, 2016 V*-DOB VIOLATION - DISMISSED ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2014 CAT 1 INSP/TST
Nov 14, 2016 V*-DOB VIOLATION - DISMISSED ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2014 CAT 1 INSP/TST
Nov 14, 2016 V*-DOB VIOLATION - DISMISSED ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2014 CAT 1 INSP/TST
Nov 14, 2016 V*-DOB VIOLATION - DISMISSED ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2014 CAT 1 INSP/TST
Nov 14, 2016 V*-DOB VIOLATION - DISMISSED ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2014 CAT 1 INSP/TST
Nov 14, 2016 V*-DOB VIOLATION - DISMISSED ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2014 CAT 1 INSP/TST
Nov 14, 2016 V*-DOB VIOLATION - DISMISSED ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2014 CAT 1 INSP/TST
Apr 2, 2016 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
Apr 2, 2016 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
Apr 2, 2016 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
Apr 2, 2016 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED