Manhattan Harlem (South)
2057 Adam Clayton Powell Jr Blvd, Manhattan
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
13 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Nov 14, 2025 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION |
| May 1, 2024 | V-DOB VIOLATION - ACTIVE | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Apr 15, 2024 | V-DOB VIOLATION - ACTIVE | COMPBLD-STRUCTURALLY COMPROMISED BUILDING NONE | FAILURE TO SUBMIT AN ACCEPTABLE INSPECTN RPT FOR STRUCTURALLY COMPROMISED BLDG. |
| Mar 22, 2024 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FTM.BLDG SFFRD A FIRE ON 3/1/24.ROOF OPEN OVER '2'APT LINE 2NDFL WOOD JOISTS ABOVE DELI MODERATELY CHARRD.FIRE&SMOKE DAMAGE THROUGHOUT'2' LINE.OBSRVD FLRS SLOPING&SAGGNG THROUGHOUT PART@STAIRWL.COMPLY WITH COMMISSIONER'S ORDER:DOB VIOLATION 030124FEU11002AK(CONTROL 343465) IMMEDIATELY |
| Mar 1, 2024 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FTM.BLDG SFFRD A FIRE ON 3/1/24.ROOF OPEN OVER '2'APT LINE 2NDFL WOOD JOISTS ABOVE DELI MODERATELY CHARRD.FIRE&SMOKE THROUGHOUT '2'LINE OBSRVD FLRS SLOPING&SAGGNG THROUGHOUT PART @STAIRWL.OWNR TO ENGAGE NYS PE &ENDRSD PRMT TO RPAIR BY 3/22/24.SGN OFF RPAIR PRMTY BY 5/22/24 |
| Mar 1, 2024 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | EMERGENCY WORK ORDER.BLDG SFFRD A FIRE ON 3/1/24.ROOF OPEN OVER '2' APARTMENT LINE.2NDFL WOOD JOISTS OVER DELI MODERATELY CHARRD FIRE & SMOKE DAMAGE THROUGHOUT '2'LINE.OBSRVD FLRS SLOPNG&SAGGNG THROUGHOUT OWNR TO IMMED RTAIN NYS PE&ENDRSD CNTCTR TO 1.INSTALL TEMP ROOF@AN OPEN AREA,2.INSTALL TEMP SHORNG ABOVE 1STFL CMMRCL |
| Mar 1, 2024 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | STRUCTURE RENDERED NON-COMPLAINT. AT TIME OF INSPECTION DAMAGE OBSERVED TO HAVE BEEN SUSTAINED TO APT LINE 2 INCLUDING DELI DUE TO FIRE AT 2059 ADAM CLAYTON POWELL BLVD MANHATTAN. A VACATE ORDER ISSUED ON APT # 2A, 2B, 2C, 2D & DELI. |
| Mar 1, 2024 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | OBSERVED FIRE INITIATED IN COMMERCIAL SPACE ( DELI STORE ) AND SUSTAINED EXTENSIVE DAMAGED WITH CHARRED CEILING JOISTS AND SLIGHTLY BENDED. ALSO OBSERVED INTERIOR STAIRWELL LANDINGS ARE LEANING 1ST TO 5TH FLOOR. |
| Feb 24, 2017 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT |
| May 15, 2014 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT |
| May 4, 1998 | V-DOB VIOLATION - ACTIVE | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Sep 16, 1997 | V-DOB VIOLATION - ACTIVE | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Jul 28, 1995 | V-DOB VIOLATION - ACTIVE | ES-ELECTRIC SIGNS NONE | ES-ELECTRIC SIGNS NONE |