Manhattan Inwood
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
14 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Jan 9, 2019 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Jan 9, 2019 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Feb 24, 2017 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT |
| Dec 15, 2014 | V*-DOB VIOLATION - Resolved | E-ELEVATOR ELEVATORREQUIRED | E-ELEVATOR ELEVATORREQUIRED |
| Apr 14, 2012 | V*-DOB VIOLATION - Resolved | E-ELEVATOR ELEVATORREQUIRED | E-ELEVATOR ELEVATORREQUIRED |
| Jan 28, 2009 | V*-DOB VIOLATION - Resolved | E-ELEVATOR ELEVATORREQUIRED | E-ELEVATOR ELEVATORREQUIRED |
| Jan 10, 2007 | V*-DOB VIOLATION - Resolved | E-ELEVATOR ELEVATORREQUIRED | E-ELEVATOR ELEVATORREQUIRED |
| Nov 28, 2005 | V*-DOB VIOLATION - Resolved | E-ELEVATOR ELEVATORREQUIRED | E-ELEVATOR ELEVATORREQUIRED |
| Jul 31, 2002 | V*-DOB VIOLATION - Resolved | E-ELEVATOR ELEVATORREQUIRED | 1P1143 |
| Aug 31, 1999 | V*-DOB VIOLATION - Resolved | E-ELEVATOR ELEVATORREQUIRED | 1P1143 |
| Apr 23, 1991 | VP-VIOLATION UNSERVED ECB-ACTIVE | E-ELEVATOR ELEVATORREQUIRED | E-ELEVATOR ELEVATORREQUIRED |
| Feb 20, 1990 | V*-DOB VIOLATION - Resolved | E-ELEVATOR ELEVATORREQUIRED | (03) CAPACITY PLATED (52) FILE APPLICATION AND OBTIAN PERMIT FOR NEW BROKENS |
| Mar 13, 1989 | V*-DOB VIOLATION - Resolved | E-ELEVATOR ELEVATORREQUIRED | (28)CLEAN UP OIL(51)POST NAME OF RESPONSIBLE MAINT. CO. IN MOTOR RM.(52)CLEAN CAR TOP(53)PROVIDE SELECTOR CHAIN GUARD(54)PRMOVE EXCESSI VE VIBRATION WHEN ELEVATOR IS IN MOTION (55)PROVIDE AGENT IN CAB AND GUARD |
| Jul 12, 1988 | V*-DOB VIOLATION - Resolved | E-ELEVATOR ELEVATORREQUIRED | (51)ELIMINATE CABLE SLIPPAGE ON TRACTION SHEEVE AND CONDUCT FULL LOAD LIFT PERFORMANCE TEST IN PRESENCE OF AN INSPECTOR FROM THIS DEPT (52)TIGHTEN ALL HOISTWAY DOOR KEEPER.(53)REPLACE ALL MISSING COVERS (54)FILE BN FOR NEW HOIST MOTOR AND BRAKE AND CONDUCT NECESSARY TESTS (55)POST NAME OF MAINT. CO |