Manhattan Chelsea-Hudson Yards
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
4 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Apr 13, 2026 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | EMERGENCY WORK ORDER.DUE TOFIRE@210 7AVE,ON/AROUND 4/12/26,203 WEST W22ST WAS DMGD W/CRCKD SAGGNG ROOF DUE TO 200 7AVE'S CHIMNEY THAT PRTLLY CLLPSD ONTO ROOF.ROOF DRAIN CLOGGED W/POOLED WATR APPROX UP TO OWNR TO IMMED RTAIN NYSPE&DOB REG CG TO 1.IMMED SHORNG ROOF,AS REQ,2 DRAIN ROOF&CLEAN OFF CLLPSD DEBRIS,3.ALL WRK TO BE UNDR FULLTIME NYS |
| Apr 13, 2026 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FTM BLDG IN A SAFE CONDITION.DUE TO FIRE @ 210 7TH AVE ON/AROUND 4/12, THE 203 W 22ND ST BLDG WAS DAMAGED W/210 CHIMNEY PARTIALLY COLLAPSED ONTO ROOF W/CRACKED ROOF JOIST,SAGGING ROOF.OWNER TO RETAIN NYSPE TO EVAL ENTIRE BLDG,FILE REPAIR JOB W/DOB,BLDG TO BE PERM REPAIRED UNDER PERMIT, START 5/25/26 |
| Apr 12, 2026 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FTM BLDG IN A SAFE CONDITION.DUE TO FIRE @210 7TH AVE ON/AROUND 4/12, THE 203 W22ND ST BLDG WAS DAMAGED W/210 CHIMNEY PARTIALLY COLLAPSED ONTO ROOF W/CRACKED ROOF JOISTS,SAGGING ROOF.OWNER TO RETAIN NYSPE TO EVAL ENTIRE BLDG,FILE REPAIR JOB W/DOB,BLDG TO BE PERM RPAIRED UNDER PERMIT,START 5/25/26 |
| Apr 12, 2026 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | STRUCTURE RENDERED NON COMPLAINT. AT TIME OF INSPECTION OBSERVED WATER DAMAGE THROUGHOUT, AT APARTMENT#4 AND 3 CEILING AND WALL DAMAGED, WINDOWS OUT, ROOF JOIST SNAPPED AND CHIMNEY FROM ADJACENT BUILDING FELL ON ROOF DUE TO FIRE AT 210 7 AVENUE MANHATTAN. VACATE ENTIRE BUILDING. |