Manhattan Chelsea-Hudson Yards
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
6 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Oct 4, 2023 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Apr 25, 2023 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION |
| Oct 14, 2022 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | EMRGNCY WRK-EXP4 CELLAR RUBBLE FDN WALL BULGING @FRNT ~5' &PARTLY COLLPSD.ALONG NEXT~25(@FUEL TANK).EXP4 UPPR APTS CRCKD @FRNT W/SAGGING FLRS.BLDG STRCTURLLY COMPRMISD & RISK OF FURTHER COLLAPSE IMMED INSTLL SHORNG/BRACNG-STABLIZ BLDG.ALL WRK UNDR CONTI SUPRV/DIRCT OF ONSITE PE.FILE W/IN 2 DAYS.INSTLL FENCE @EXP1 |
| Oct 14, 2022 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FTM-EXP4 CELLAR RUBBLE FDN WALL BULGING @FRNT ~5FT & PARTLY COLLPSD ALONG NEXT ~25FT(@FUEL TANK).EXP4 UPPER APTS CRCKD @FRNT WITH SAGGING BLDG STRCTRLY COMPRMISD @RISK OF FURTHER COLLAPSE OWNR RTAIN NYSPE-EVAL ENTIRE BLDG &PREPARE RPR DWGS.RPR BLDG PERMANTLY UNDR PRMT STRTNG BY 12/12/22 &CMPLTD BY 2/10/23 |
| Aug 27, 2020 | V*-DOB VIOLATION - DISMISSED | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | PROVIDE APPROXIMATELY 30 LINEAR FEET OF SIDEWALK SHED OVER PEDESTRIAN SIDEWALK AT EXPOSURE 1 TO PROTECT THE PUBLIC AND PROPERTY |
| May 15, 2014 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT |