20 records

Date Status Type Summary
May 2, 2023 V*-DOB VIOLATION - DISMISSED BENCH-FAILURE TO BENCHMARK NONE FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
Apr 25, 2023 V*-DOB VIOLATION - DISMISSED LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION
Apr 29, 2021 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL SIDE WALK SHED RENDERED NON COMPLAINT DUE TO VEHICLE IMPACTING SHED ON 103RD STREET . TWO UPRIGHT POST HAVE BEEN DISLODGEG AFFECTING SUPPORT OF PALNK DECKING 8 FEET
Nov 8, 2019 V*-DOB VIOLATION - DISMISSED LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT
May 18, 2016 V*-DOB VIOLATION - DISMISSED AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
Mar 18, 2016 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL OWNERS RESPONSIBILITIES. THE FACADE @ THE SOUTH BLDG WALL IS SIGNIFICANTLY DETERIORATED W/CRACKED & PARTIALLY FAILED STUCCO CRACKED LOOSE MATERIAL IN DANGER OF COLLAPSE INTO THE ADJACENT LOT 50 REMEDY IMMED PROVIDE OVERHEAD PROTECTION FOR THE ADJACENT LOT 50
Mar 18, 2016 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL OWNERS RESPONSIBILITIES.THE FACADE @ THE ADJACENT BLDG @ 1998 2ND AVE IS SIGNIFICANTLY DETERIORATED W/CRACKED & PARTIALLY FAILED STUCCO CRACKED BRICK LOOSE MATERIAL IN DANGER OF COLLAPSE INTO THE EMPTY LOT 50.REMEDY:IMMED PROVIDE OVERHEAD PROTECTION AT LOT 50
Mar 17, 2016 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL FM.ALL WALLS TO BE PLUMG. AND TRUE.THE FACADE AT ECP1(WEST)WALL IS BULGING SEPARATED AND LEANING AWAY FROM THE RETURN WALLS.THE STORE FRONT MASONRY PIERS ARE DETERIORATED W/SIGNIFICANT STRUCTURAL CRACKS AND LOOSE BRICKS.REMEDY: IMMED RETAIN A NYS LIC PE TO FILE STABILIZATION AND REPAIR DWGS BY 3/31/16
Mar 16, 2016 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL FM.EMERG.WORK.THE FACADE @ EXP(WEST) WALL IS BULGING&LEANING AWAY FROM RETURN WALLS.THE FCADE @ EXP2(NORTH)WALL IS SEVERELY DETERIORATED W/ SIGNIFICANT CRACKING BULGING BRICK AND OUT OF PLANE MOVEMENT.THE NORTH AND WEST FACADE IS A DANGER TO THE PUBLIC. REMEDY:IMMED ERECT SIDEWALK SHED TO BE IN PLACE NO LATER THAN 8AM MONDAY 3/21/16
Nov 23, 2012 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL C-CONSTRUCTION OTHER OPTIONAL
Dec 31, 2009 V*-DOB VIOLATION - DISMISSED LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
Dec 18, 2007 VW*-VIOLATION - WORK W/O PERMIT DISMISSED C-CONSTRUCTION OTHER OPTIONAL C-CONSTRUCTION OTHER OPTIONAL
Dec 10, 1999 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL C-CONSTRUCTION OTHER OPTIONAL
Sep 16, 1997 V*-DOB VIOLATION - DISMISSED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
Jul 2, 1997 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL C-CONSTRUCTION OTHER OPTIONAL
Jul 2, 1997 VP-VIOLATION UNSERVED ECB-ACTIVE C-CONSTRUCTION OTHER OPTIONAL C-CONSTRUCTION OTHER OPTIONAL
Feb 10, 1997 V*-DOB VIOLATION - DISMISSED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
Aug 29, 1995 V*-DOB VIOLATION - DISMISSED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
Sep 1, 1994 V*-DOB VIOLATION - DISMISSED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
Jul 22, 1991 VP*-VIOLATION UNSERVED ECB- DISMISSED C-CONSTRUCTION OTHER OPTIONAL C-CONSTRUCTION OTHER OPTIONAL