NYC Building Report

Manhattan Washington Heights (North)

187 Pinehurst Avenue, Manhattan

DOB violations

Department of Buildings violations attached to this BIN or tax lot.

5 records

Date Status Type Summary
May 5, 2026 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FTM. OBSRVD RETAINING WALL ALONG EXP3 EAST ELEV OF SUBJECT ADDRESS EXHIBITS DEFECTIVE CONDITS: DISPLACD/SPALLD STONE, VERTICAL/HORIZONTL CRACKS & LOOSE MATERIAL @ MULTI LOCATS. REMEDY: OWNER TO HIRE A NYS PE TO PREPARE AN ENGINEERING REPORT ADDRESSING THE CONDITIONS. OWNER TO SUBMIT ENGINEERING REPORT & REPAIRS REPORTS TO FACADES@BNG BY 5.15.26
Jul 9, 2024 V*-DOB VIOLATION - DISMISSED P-PLUMBING NONE THE DEPARTMENT OF BUILDINGS INTENDS TO REVOKE THE PERMIT AND APPROVALS ISSUED IN CONNECTION TO JOB#M00911358-I1-LA DUE TO SUSPENSION OF THE MASTER PLUMBER LICENSE #2286. ALL PLUMBING WORK IN CONNECTION WITH THIS APPLICATION HAS BEEN ORDERED STOPPPED IMMEDIATELY.
Dec 15, 2022 V*-DOB VIOLATION - DISMISSED RWNRF-RETAINING WALL NONE FAILED TO FILE CYCLE 1 TECHNICAL REPORT BY 12/31/2018 PER RCNY 103-09
Jul 31, 2013 V*-DOB VIOLATION - DISMISSED AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
Sep 1, 1994 V*-DOB VIOLATION - DISMISSED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED