Manhattan Greenwich Village
181 Bleecker Street, Manhattan
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
15 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Nov 14, 2025 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION |
| Sep 23, 2024 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION |
| Apr 6, 2018 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT |
| Sep 15, 2017 | V*-DOB VIOLATION - DISMISSED | EVCAT1-ELEVATOR ANNUAL INSPECTION / TEST ELEVATORREQUIRED | VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2016 INSPECTION/TEST |
| Feb 8, 2017 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Jan 17, 2017 | V*-DOB VIOLATION - DISMISSED | LANDMK-LANDMARK NONE | LANDMK-LANDMARK NONE |
| Jan 17, 2017 | V*-DOB VIOLATION - DISMISSED | LANDMK-LANDMARK NONE | LANDMK-LANDMARK NONE |
| Nov 17, 2016 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FM 3 STORY WOOD FRAME BEARING WALLS W/STUCCO FINISH&BRICK WALL@FRONT FACADE.EMERG WORK DONE TO STABILIZE FRONT,REAR&EAST WALLS THAT ARE BULDGING.OTHER STRL DEFECTS EXIST.DEFECTIVE PARAPET AT REAR WALL.ROOF OF REAR EXT IS ROTTING.REMEDY:OWNER TO FILE PLANS&OBTAIN PERMITS TO CARRY OUT LONG TERM REPAIR TO BLDG.WORK TO START NO LATER THAN 1/1/17 |
| Nov 17, 2016 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | EMERG WORK.3 STORY WOOD FRAME BEARING WALLSW/STUCCO FINISH&BRICK WALL @FRONT FACADE.SEVERE BULDGING @ FRONT,REAR&EAST WALLS.OTHER DEFECTS INCLUDE RUSTED STEEL WINDOW LINTELS&PIECES OF STUCCO FALLING FROM BLDG REMEDY:OWNER TO IMMED TAKE REMEDIAL MEASURES TO BRACE FRONT,REAR&EAST WALLS.START WORK NO LATER 11/18/16.APPLY FOR PERMITS W/48HRS |
| May 15, 2014 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT |
| Mar 1, 2013 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2011 INSPECTION REPORT |
| Dec 13, 2011 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2010 INSPECTION REPORT |
| Dec 31, 2009 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED |
| Feb 5, 2008 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |
| Jan 19, 2007 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |