NYC Building Report

Manhattan Morningside Heights

180 Claremont Avenue, Manhattan

DOB violations

Department of Buildings violations attached to this BIN or tax lot.

23 records

Date Status Type Summary
Dec 3, 2019 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
May 3, 2019 V*-DOB VIOLATION - DISMISSED BENCH-FAILURE TO BENCHMARK NONE FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
Oct 23, 2018 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
Jul 11, 2018 V*-DOB VIOLATION - DISMISSED AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
Nov 28, 2016 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL FAILURE TO COMPLY WITH COMMISSIONER'S ORDER. AT THE TIME OF INSPECTION WE OBSERVED THE RETAINING WALL LOCATED AT THE REAR YARD WAS CRACK AND OUT OF PLUMB. ON 2/11/16 VIOLATION WAS ISSUED FOR FAILURE TO MAINTAIN THE STRUCTURE. REMEDY: IMMEDIATELY RETAIN A LIC. DESIGN PROFESSIONAL AND PROVIDE ENGINEERING ASSESMENT TO R/W UNIT BY 12/12/2016
Nov 28, 2016 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FAILURE TO COMPLY WITH COMMISSIONER'S ORDER. AT THE TIME OF INSPECTION WE OBSERVED THE RETAINNING WALL LOCATED AT THE REAR YARD WAS CRACK AND OUT OF PLUMB. ON 2/11/16 VIOLATION WAS ISSUED FOR FAILURE TO MAINTAIN THE STRUCTURE.REMEDY: IMMEDIATELY RETAIN A LIC. DESIGN PROFESSIONAL PROVIDE ENGINEERING ASSESMENT TO R/W UNIT BY 12/12/2016
Oct 5, 2016 V*-DOB VIOLATION - DISMISSED AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
Sep 21, 2016 V*-DOB VIOLATION - DISMISSED AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
Feb 11, 2016 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FM STRUCTURE IN A CODE COMPLIANT MANNER. AT REAR YARD PROPERTY LINE RETAINING WALL IS CRACKED AND OUT OF PLUMB. REMEDY: REQUIRE LIC DESIGN PROFESSIONAL TO EVALUATE RETAINING WALL AND SUBMIT REPORT TO FEU BY 6/6/16. CONSTRUCT NEW RETAINING WALL TO BE DESIGNED BY A LIC DESIGN PROFESSIONAL. WORK TO START NO LATER THAN 10/25/16
Nov 12, 2015 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
Dec 1, 2014 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
Dec 16, 2013 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
Jan 20, 2011 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
Apr 15, 2010 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
Jun 16, 2008 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
Oct 11, 2006 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
Aug 20, 2006 VW*-VIOLATION - WORK W/O PERMIT DISMISSED C-CONSTRUCTION OTHER OPTIONAL WORK W/OUT PERMIT
Feb 20, 2004 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
Jan 24, 2001 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED 1 P10022
May 4, 1998 V*-DOB VIOLATION - DISMISSED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
Dec 24, 1990 V*-DOB VIOLATION - DISMISSED ES-ELECTRIC SIGNS NONE ES-ELECTRIC SIGNS NONE
Oct 2, 1990 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED (74) CLEAN PIT PROVIDE ACCESS MOTOR ROOM AND OVERHEAD
Jun 12, 1989 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED 21 CLEAN OFF HOIST ROPES SO A BETTER INSPECTION CAN BE MADE