| Date | Status | Type | Summary |
|---|---|---|---|
| Jul 7, 2025 | V*-DOB VIOLATION - DISMISSED | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | REMEDY: SEAL OF ALL ACCESSIBLE OPENINGS.TO APARTMENTS 6E, 5E, 4E.3E, 2E, 1E, 6D, 5D, 4D, 3D, 2D, AND 1D |
| Jul 7, 2025 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | BUILDING RENDERED NON COMPLIANT DUE TO FIRE. FIRE DAMAGED ROOF OVER D & E LINES COVERTING A HOLE. FIRE DAMAGE THROUGHOUT APT. 6E. HOLES IN CEILINGS IN APT. 6D. WATER DAMAGE FROM 1ST TO 6TH FLOOR . VACATE D & E LINES MAKE ALL NECESSARY REPAIRS |
| Jun 17, 2025 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO COMPLY WITH COMMISIONERS ORDER #051325RW20805BH CONTROL # 365771, ISSUED ON MAY 13, 2025 UP TO TODAY'S DATE. NO PERMITS HAVE BEEN OBTAINED TO REPAIR STRUCTURALLY COMPROMISED RW. REMEDY: IMMEDIATELY COMPLY WITH COMMISSIONER'S ORDER 051325RW20805BH ISSUED ON MAY 13, 2025 |
| May 13, 2025 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN RETAINING WALL IN SAFE CONDITION. PROPERTY IS STRUCTURALLY COMPROMISED AND POSES A DANGER TO PUBLIC. REMEDY: IMMEDIATELY RETAIN A NYS LICENSED ENGINEER & ENDORSED CONTRACTOR TO PROVIDE DRAWINGS FOR THE FULL REPAIRS OF THE RW NO LATER THAN JUNE 3, 2025. COMMENCE CONSTRUCTION UNDER PERMITS BY 6/16/2025 |
| Mar 4, 2025 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | EMERGENCY WORK. NOTED: AT THE TIME OF INSPECTION WE OBSERVED THAT THE RETAINING WALL LOCATED ALONG THE REAR OF THE BUILDING IS STRUCTURALLY COMPROMISED AND POSES A THREAT TO PUBLIC SAFETY SINCE IT MAY COLLAPSE AT ANY TIME |
| Feb 26, 2025 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | NOTED CRACKS IN REAR RETAINING WALL AND FACADE. REAR RETAINING WALL IS RESTING ON STONE THAT IS CRUMBLING AND BREAKABLE. INSPECT STABILITY OF REAR WALL. |
| Nov 26, 2024 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Jun 10, 2024 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | EMERGENCY WORK ORDER DUE TO CRACKED,BULGING BRICKEXP#1 NORTH EAST CORNER BELOW TOP FL WINDOW SILL CRACKED BELT CAUSE BY 5FL WITH BULGING BRICK ABOVE BELT COUSE DETERIORATED/SAGGING LINTELS MULTI LOC.COND PRESENT A SEVERE HAZARD TO THE PUBLIC RIGHT OF WAY.REMEDY:IMMEDIATELY TAKE& PROVIDE SAFETY MESURES,SUCH AS A SHED,TO SECURE &PROTECT PUBLIC |
| Jan 14, 2021 | V*-DOB VIOLATION - Resolved | E-ELEVATOR ELEVATORREQUIRED | E-ELEVATOR ELEVATORREQUIRED |
| May 4, 2018 | V*-DOB VIOLATION - Resolved | E-ELEVATOR ELEVATORREQUIRED | E-ELEVATOR ELEVATORREQUIRED |
| Sep 15, 2017 | V*-DOB VIOLATION - DISMISSED | EVCAT1-ELEVATOR ANNUAL INSPECTION / TEST ELEVATORREQUIRED | VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2016 INSPECTION/TEST |
| Jan 3, 2017 | V*-DOB VIOLATION - DISMISSED | ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED | VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST |
| Nov 14, 2016 | V*-DOB VIOLATION - DISMISSED | ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED | VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2014 CAT 1 INSP/TST |
| Dec 6, 2013 | V*-DOB VIOLATION - Resolved | E-ELEVATOR ELEVATORREQUIRED | E-ELEVATOR ELEVATORREQUIRED |
| Mar 1, 2013 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2011 INSPECTION REPORT |
| Apr 11, 2012 | V*-DOB VIOLATION - Resolved | E-ELEVATOR ELEVATORREQUIRED | E-ELEVATOR ELEVATORREQUIRED |
| Jan 1, 2012 | V*-DOB VIOLATION - DISMISSED | BENCH-FAILURE TO BENCHMARK NONE | FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 |
| Apr 30, 2010 | V*-DOB VIOLATION - Resolved | E-ELEVATOR ELEVATORREQUIRED | E-ELEVATOR ELEVATORREQUIRED |
| Jun 18, 2008 | V*-DOB VIOLATION - Resolved | E-ELEVATOR ELEVATORREQUIRED | E-ELEVATOR ELEVATORREQUIRED |
| Jan 19, 2007 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Jan 5, 2007 | V*-DOB VIOLATION - Resolved | E-ELEVATOR ELEVATORREQUIRED | E-ELEVATOR ELEVATORREQUIRED |
| Nov 29, 2005 | V*-DOB VIOLATION - Resolved | E-ELEVATOR ELEVATORREQUIRED | E-ELEVATOR ELEVATORREQUIRED |
| Jan 31, 2005 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Nov 8, 2004 | V*-DOB VIOLATION - Resolved | E-ELEVATOR ELEVATORREQUIRED | E-ELEVATOR ELEVATORREQUIRED |
| Feb 13, 2004 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Mar 19, 2003 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Sep 1, 1999 | V*-DOB VIOLATION - Resolved | E-ELEVATOR ELEVATORREQUIRED | 1P11504 |
| Aug 29, 1995 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Mar 18, 1994 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Mar 18, 1993 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Jan 22, 1992 | VH*-VIOLATION HAZARDOUS DISMISSED | E-ELEVATOR ELEVATORREQUIRED | E-ELEVATOR ELEVATORREQUIRED |
| Jul 13, 1989 | V*-DOB VIOLATION - Resolved | E-ELEVATOR ELEVATORREQUIRED | (73)REPAIR CAB FLOORING (74)PROVIDE ACCESS TO MACHINE ROOM |
| Apr 3, 1989 | V*-DOB VIOLATION - Resolved | E-ELEVATOR ELEVATORREQUIRED | (51)PROVIDE LIGHT GUARD IN ELEVATOR(52)FILE BUILDING NOTICE FOR NEW CONTROLLER,DOOR INTERLOCKS,HOIST MOTOR,BRAKE AND HAVE TESTED IN THE PRESENCE OF AN INSPECTION FROM THIS DEPT |
| Jul 25, 1988 | V*-DOB VIOLATION - Resolved | E-ELEVATOR ELEVATORREQUIRED | (51(PROVIDE LIGHT IN OVERHEAD LOCK.(52)CLEAN CAR TOP.(53)PROVIDE CAPACITY PLATE.(54)FILE BN FOR ALL MAJOR CHANGES-NEW CONTROLLER, HOIST MOTOR,ETC AND CONDUCT NECESSARY TESTS IN THE PRESENCE OF AN INSP FROM THIS DEPARTMENT |