Manhattan Hamilton Heights-Sugar Hill
1761 Amsterdam Avenue, Manhattan
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
8 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Jun 30, 2025 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN BLDG IN SAFE CONDITION.DUE TO ADJ CONSTRCTN/ EXCAVATION:EXP2&EXP3@REAR CRNR UNDERMINED:CELLAR SLAB@MORGUE OFFICE& BATHRM CRCKS APPRX 1FT FRM EXP2 FDN WALL W/APPRX 3/8"CRCK.OWNR TO RTAIN NYSPE TO EVAL ENT BLDG&FILE RPAIR DWGS W/DOB PERM RPAIRS TO STRT UNDR PRMT STRTNG BY 8/11/25&CMPLTD&SGND |
| Jun 23, 2025 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | EXP1 ALONG AMSTERDAM AVE & EXP4 ALONG W. 147 ST EXP2 HAS SPALLING STUCCO & DETERIORATED BRICKS ESPECIALLY @ REAR HALF EXP3 WALL HAD SEVERE CRACKS NEAR 5FL & ROOF NEAR 2/3 CORNER WITH THE REAR FIRE ESCAPE STRUCT COMPROMISED. PARTIALLY VACATE THE EXP2&3 YARDS & REAR APTS #3 #6 #G UNTIL HAZ CONDITIONS HAVE BEEN REMEDIED |
| Jun 23, 2025 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | EMERGENCY WORK ORDER TO INSTALL PEDESTRIAN PROTECTION ALONG PUBLIC SIDEWALK AND/ORE PREMISES AS REQ'D. HAZ COND EXISTS W/EXTERIOR FACADE ON ALL SIDE OF THE BLDG. MASONRY WINDOW HEADER ON 2FL SAGGING/BULGING OWNER TO IMMED RETAIN GC TO INSTALL SIDEWALK SHED ALONG EXP01/04 FILE PERMIT W/IN 2 DAYS FROM START WORK |
| Jun 23, 2025 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | CORRECTIVE ACTION PLAN. OBSVD HAZ COND TO EXT FACADE WALLS @ THE BLDG @01 DISLODGED STONE HEADERS DISLODGED STUCOO & MISSING MORTAR AROUND BRICKS @ EXP02 DISLODGE FIRE ESCAPE & BRICKS @03 STEP CRACK & BROKEN SILL. OWNER TO IMMED RETAIN REG DESIGN PROF TO EVAL ENTIRE BLDG.SUBMIT CORRECTIVE ACTION PLAN TO PROACTIVEINSP@BUILDINGS.NYC.GOV BY 07/03/25 |
| Jan 11, 2017 | V-DOB VIOLATION - ACTIVE | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Mar 3, 2015 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT |
| Mar 1, 2013 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2011 INSPECTION REPORT |
| Dec 13, 2011 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2010 INSPECTION REPORT |