Manhattan Upper East Side-Carnegie Hill
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
4 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Jun 10, 2015 | V-DOB VIOLATION - ACTIVE | JVIOS-PRIVATE RESIDENTIAL ELEVATOR ELEVATOROPTIONAL | 2014 VIOS ISSUED TO ELEVATORS IN PRIVATE RES DWELLINGS(1 OR 2 FAMILY DWELLINGS) |
| Oct 1, 2012 | V*-DOB VIOLATION - DISMISSED | JVIOS-PRIVATE RESIDENTIAL ELEVATOR ELEVATOROPTIONAL | 2011 VIOS ISSUED TO ELEVATORS IN PRIVATE RES DWELLINGS(1 OR 2 FAMILY DWELLINGS) |
| Oct 15, 2009 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | MISCELLANROUS VIOLATIONS FAILURE TO PROTECT ROOFS SKYLIGHTS CHMNEYS AN D OUTLETS AFFECTED BY CONSTRUCTION OR DEMOLITION OPERATIONS NOTED: UPO J INSPECTION NO ROOF/INADEQUATE PROTECTION ON ADJOINING BUILDING 1ST F LOOR AT 167 EAST 82 STREET STOP WORK ON ROOF OF 165 EAST 82 STREET REM EDY: COMPLY WITH NOTICE OF VIOLATION PROVIDE REQUIRED PROTECTION CALL |
| Aug 13, 2009 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | WORK DOES NOT CONFORM TO APPROVED PLANS NOTED: CONCRETE LEDGER WALL AT EXPOSURE 4 IN CELLAR AND/OR UNDERPINNING IS NOT SHOWN ON PLANS STEEL ANGLE LEDGERS AND CHANNELS HAVE BEEN INSTALLED TO SUPPORT FLOOR BEAMS AT LOWER FLOORS WHERE EXISTING & WALL EMBEDMENT IS SHOWN STOP ALL WORK REMEDY: STOP ALL WORK SUBMIT PLANS TO SEP EX FOR ENG REVIEW |