Manhattan Upper East Side-Carnegie Hill
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
4 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Sep 15, 2017 | V*-DOB VIOLATION - DISMISSED | JVIOS-PRIVATE RESIDENTIAL ELEVATOR ELEVATOROPTIONAL | 2016 VIOS ISSUED TO ELEVATORS IN PRIVATE RES DWELLINGS(1 OR 2 FAMILY DWELLINGS) |
| Oct 1, 2012 | V*-DOB VIOLATION - DISMISSED | EVCAT1-ELEVATOR ANNUAL INSPECTION / TEST ELEVATORREQUIRED | VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2011 INSPECTION/TEST |
| Oct 15, 2009 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | MISCELLANEOUS VILATIONS FAILURE TO PROTECT ADJOINING ROOFS SKYLIHTS CH EMNEYS AND OUTLETS BY CONSTRUCTION OR DEMOLITION OPERATIONS NOTED: UPO N INSPECTION NO ROOF PROTECTION/INADEQUATE ON ADJOINING BUILDING AT 16 1 EAST 82 STREET STOP ALL WORK ON ROOF AT 163 EAST 82 STREET REMEDY: C OMPLY WITH NOTICE OF VIOLATION PROVIDE REQUIRED PROTECTION CALL EXCAVA |
| Aug 13, 2009 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | WORK IS CONTRARY TO APPROVED PLANS NOTED: CELLAR HAS BEEN EXCAVATED TO APPROX 14 FEET WITH NO UNDERPINNING INSTALLED AS PER PLANS/SECTIONS STRUCTURAL STEEL FRAMING HAS BEEN MODIFIED UNDER ROOF W12X15 NOT INSTA LLED REAR OF STAIR PENDING AND FRAMING HAS BEEN AT ELEVATOR SHAFT MODI FIED REMEDY: STOP ALL WORK FORTHWITH SUBMIT PLANS TO SEP EX FOR ENG |