Manhattan Upper East Side-Carnegie Hill
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
5 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Jan 16, 2021 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | CURB CUT MUST BE RESTORED. AS PER BC 3202.2.2.4.1 THE VEHICULAR ACCESS ACROSS A CURB CUT THAT NO LONGER SERVES AS VEHICULAR ACCESS ACROSS A CURB OR SIDEWALK. THE CURB SHALL BE RESTORED TO THE STANDARDS OF THE DEP. OF TRANS. BLDG ALTERED PER APP. #110052228 AND SIGNED OFF 07/07/2011 BUT CURB CUT REMAINS AND CURB CUT HEIGHT NOT RESTORED. |
| May 20, 2019 | V*-DOB VIOLATION - DISMISSED | JVCAT5-RESIDENTIAL ELEVATOR PERIODIC INSPECTION/TEST ELEVATORREQUIRED | FAILURE TO PERFORM CATEGORY 5 INSPECTION |
| Sep 15, 2017 | V*-DOB VIOLATION - DISMISSED | JVIOS-PRIVATE RESIDENTIAL ELEVATOR ELEVATOROPTIONAL | 2016 VIOS ISSUED TO ELEVATORS IN PRIVATE RES DWELLINGS(1 OR 2 FAMILY DWELLINGS) |
| Jun 10, 2015 | V*-DOB VIOLATION - DISMISSED | JVIOS-PRIVATE RESIDENTIAL ELEVATOR ELEVATOROPTIONAL | 2014 VIOS ISSUED TO ELEVATORS IN PRIVATE RES DWELLINGS(1 OR 2 FAMILY DWELLINGS) |
| Jan 5, 2009 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | MISCELLANEOUS VIOLATIONS FAILURE TO EXTEND CHIMNEY AT LEAST 3 FEET ABO VE ROOF DUE TO NEW CONSTRUCTION THE CHIMNEY OF THE ADJOINING PROPERTY IS APPROXIAMATELY 4 FEET FROM THE BUILDING AND DOES NOT EXTEND OVER TH E NEW CONSTRUCTION 160 EAST 92 ST REMEDY: COMPLY WITH NOTICE OF VIOLAT ION OBTAIN ALL NECESSARY PERMITS |