Manhattan East Harlem (South)
162 East 109 Street, Manhattan
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
23 records
| Date | Status | Type | Summary |
|---|---|---|---|
| May 29, 2026 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FTC W/COMMISSIONER'S ORDER CONTROL#370476 VIO#042126PI11110SB DATED 04/21/26 REQUIRING OWNER TO PROVIDE A CORRECTIVE ACTION PLAN BY 05/21/26. AS OF 05/29/26 THE REQ'D CAP WAS NOT REC'D. IMMED COMPLY W/ COMMISSIONER'S ORDER CONTROL#370476 & VIO#042126PI1110SB |
| May 29, 2026 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FTC W/COMMISSIONER'S ORDER CONTROL#370477 VIO#042126PI11111SB DATED 04/21/26 REQUIRING OWNER TO PROVIDE A CORRECTIVE ACTION PLANY BY 05/21/26. AS OF 05/29/26 THE REQ'D CAP WAS NOT REC'D. IMMED COMPLY WITH COMMISSIONER'S ORDER CONTROL#370477 AND VIO#042126PI11111SB |
| Apr 21, 2026 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | CORRECTION ACTION PLAN REQ'D-OBSVD CRACKED AND LEANING PARAPET WALL ON EXP1. CRACKS UNDER FIRE ESCAPE CONNECTIONS ON EXP1 ON 2FL AND 3FL MULT CRACKED STONE HEADERS & SILLS ON EXP1 BROKEN STONE HEADERS EXP1 ABOVE MAIN ENTRANCE.OWNER TO IMMED RETAIN REG DESIGN PROF IN GOOD STANIDN W/DOB&NYS TO EVAL ENTIRE BLDG&SUBMIT CORRECTIVE ACTION PLAN |
| Apr 21, 2026 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | CORRECTION ACTION PLAN REQ'D-OBSVD SEVERAL MASONRY CRACKS @ MULT LOCATIONS INCLUDING NEAR THE FIRE ESCAPE CONNECTION POINTS & CRACKS ON STONE HEADERS.ON ROOF OBSVD EXP1 PARAPET LEANING OUTWARD. OWNER TO IMMED RETAIN A REG DESIGN PROF IN GOOD STANDING W/DOB&NYS TO EVAL ENTIRE BLDG & SUBMIT A CORRECTIVE ACTION PLAN |
| Apr 21, 2026 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | EMERGENCY WORK ORDER-IMMED HAZ CONDITIONS OBSVD @ EXP1 SUCH AS CRACKED & LEANING PARAPET WALL,CRACK ON STONE HEADERS ABOVE ENTRANCE DOOR AND BULGING ON MULT LOCATIONS OF EXP1. OWNER TO IMMED RETAIN DOB REG GC TO INSTALL S/W SHED ON EXP1 ON EAST 109TH ST APPROX 25 LINEAR FT START WORK IMMED |
| Apr 21, 2026 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | EMERGENCY WORK ORDER-IMMED HAZ CONDITIONS OBSV @ EXP1 SUCH AS CRACKED & LEANING PARAPET WALL CRACKS UNDER FIRE ESCAPE CONNECTION POINTS MULT CRACKS ON STONE HEADERS ABOVE ENTRANCE DOOR,BROKEN STONE HEADERS ON 2ND & 3RD FLOOR WINDOWS. OWNER TO IMMED RETAIN DOB REG GC TO INSTALL S/W SHED FULL WIDTH OF EXP1 ON EAST 109TH ST |
| Jan 3, 2026 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER. AT TIME OF INSPECTION OBSERVED CRACKS ON FACADE EXPOSURE#1 OF BUILDING. OBSERVED CRACKS ON DECORATIVE WINDOW LINTEL AND ABOVE 1FL WINDOW. ACTIVE CONSTRUCTION IN FOUNDATION PHASE AT EXP#3 OF BUILDING (157 EAST 108 ST) UNDER PERMIT#M01211560-S2-SE/M01211560-S1-FO |
| Apr 25, 2023 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION |
| Apr 6, 2018 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT |
| Mar 1, 2013 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2011 INSPECTION REPORT |
| Dec 13, 2011 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2010 INSPECTION REPORT |
| Dec 31, 2009 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED |
| Dec 31, 2009 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED |
| Jan 19, 2007 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Jan 6, 2006 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Feb 27, 2001 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Feb 7, 2000 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Mar 16, 1999 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Aug 29, 1995 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Aug 29, 1995 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Mar 18, 1994 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Mar 22, 1993 | V*-DOB VIOLATION - DISMISSED | UB-UNSAFE BUILDINGS NONE | UB-UNSAFE BUILDINGS NONE |
| Mar 18, 1993 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |