NYC Building Report

Manhattan Upper West Side (Central)

159 West 80 Street, Manhattan

DOB violations

Department of Buildings violations attached to this BIN or tax lot.

30 records

Date Status Type Summary
Nov 8, 2019 V-DOB VIOLATION - ACTIVE LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT
Aug 22, 2018 V*-DOB VIOLATION - DISMISSED AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
Apr 6, 2018 V-DOB VIOLATION - ACTIVE LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT
Jun 1, 2011 V*-DOB VIOLATION - DISMISSED AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
Jun 1, 2011 V*-DOB VIOLATION - DISMISSED AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
Oct 18, 2006 V-DOB VIOLATION - ACTIVE A-SEU NONE RESULTING FROM PENTHOUSE DEMOLITION WERE CONTINUAL WATER DAMAGE INTO A PT.#5C,CAUSING CRACKED & SAGGING LIV.RM CEILING; SCARRING ON BRICK FAC ADES OF ADJACENT PREMISES TO EAST & WEST,DEBRIS LANDING ON ALLEYWAYS T O EAST & WEST;INADEQUATE COVERING OF ROOF DESPITE WARNINGS & DAMAGE TO INTERIOR FROM HEAVY RAINS-WATER WAS NOT DIRECTED TO ROOF DRAINS,BUT
Oct 18, 2006 V*-DOB VIOLATION - DISMISSED A-SEU NONE RESULTING FROM PENTHOUSE DEMOLITION WERE CONTINUAL WATER DAMAGE INTO A PT. 5C, CAUSING CRACKES & SAGGING LIV.RM CEILING,SCARRING ON BRICK FAC ADES OF ADJACENT PREMISES TO EAST & WEST,DEBRIS LANDING ON ALLEYWAYS T O EAST & WEST;INADEQUATE COVERING OF ROOF DESPITE WARNINGS & DAMAGE TO INTERIOR FROM HEAVY RAINS-WATER WAS NOT DIRECTED TO ROOF DRAINS, BUT
Oct 18, 2006 V-DOB VIOLATION - ACTIVE A-SEU NONE RESULTING FROM PENTHOUSE DEMOLITION WERE CONTINUAL WATER DAMAGE INTO A PT.5C,CAUSING CRACKED & SAGGING LIV.RM CEILING, SCARRING ON BRICK FACA DES OF ADJACENT PREMISES TO EAST & WEST,DEBRIS LANDING ON ALLEYWAYS TO EAST & WEST;INADEQUATE COVERING OF ROOF DESPITE WARNINGS & DAMAGE TO INTERIOR FROM HEAVY RAINS-WATER NOT DIRECTED TO ROOF DRAINS, BUT ALLOW
Mar 5, 2004 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL C-CONSTRUCTION OTHER OPTIONAL
Mar 5, 2004 VW*-VIOLATION - WORK W/O PERMIT DISMISSED C-CONSTRUCTION OTHER OPTIONAL C-CONSTRUCTION OTHER OPTIONAL
Jul 30, 2003 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL C-CONSTRUCTION OTHER OPTIONAL
Jul 30, 2003 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL C-CONSTRUCTION OTHER OPTIONAL
Jul 15, 2003 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL C-CONSTRUCTION OTHER OPTIONAL
Jul 15, 2003 VW*-VIOLATION - WORK W/O PERMIT DISMISSED C-CONSTRUCTION OTHER OPTIONAL C-CONSTRUCTION OTHER OPTIONAL
Feb 14, 2002 VW*-VIOLATION - WORK W/O PERMIT DISMISSED C-CONSTRUCTION OTHER OPTIONAL C-CONSTRUCTION OTHER OPTIONAL
Jan 16, 2002 VW*-VIOLATION - WORK W/O PERMIT DISMISSED C-CONSTRUCTION OTHER OPTIONAL C-CONSTRUCTION OTHER OPTIONAL
Sep 25, 2001 VW*-VIOLATION - WORK W/O PERMIT DISMISSED C-CONSTRUCTION OTHER OPTIONAL C-CONSTRUCTION OTHER OPTIONAL
Jun 8, 2001 VW*-VIOLATION - WORK W/O PERMIT DISMISSED C-CONSTRUCTION OTHER OPTIONAL C-CONSTRUCTION OTHER OPTIONAL
Jun 6, 2001 VW*-VIOLATION - WORK W/O PERMIT DISMISSED C-CONSTRUCTION OTHER OPTIONAL C-CONSTRUCTION OTHER OPTIONAL
Mar 28, 2001 VW*-VIOLATION - WORK W/O PERMIT DISMISSED C-CONSTRUCTION OTHER OPTIONAL C-CONSTRUCTION OTHER OPTIONAL
Aug 29, 2000 VW*-VIOLATION - WORK W/O PERMIT DISMISSED C-CONSTRUCTION OTHER OPTIONAL WORK WITHOUT A PERMIT. ILLEGAL WORK NOTED AT NORTH SIDE OF ROOF, ERECT ED AN APPROX 35' WIDE X 24' LONG ADDITION. THIS ADDITION HAS TWO GLASS SLIDING DOORS ON SOUTH SDIE, AND WINDOWS AND TWO A/C UNITS ON THE NORT H. ROOF HAS BEEN DENERATED AND STAIRS INSTALLED TO ACESS ADDITION FROM 5 FLOOR. REMEDY: OBTAIN APPROVALS AND PERMITS FOR ABOVE NOTED WORK OR
Apr 28, 2000 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL C-CONSTRUCTION OTHER OPTIONAL
Apr 28, 2000 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL C-CONSTRUCTION OTHER OPTIONAL
Apr 6, 2000 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL C-CONSTRUCTION OTHER OPTIONAL
Apr 7, 1993 VP*-VIOLATION UNSERVED ECB- DISMISSED B-BOILER BOILER OPTIONAL B-BOILER BOILER OPTIONAL
Apr 6, 1993 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL C-CONSTRUCTION OTHER OPTIONAL
Apr 6, 1993 VP-VIOLATION UNSERVED ECB-ACTIVE C-CONSTRUCTION OTHER OPTIONAL C-CONSTRUCTION OTHER OPTIONAL
Mar 18, 1993 V-DOB VIOLATION - ACTIVE LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
Mar 16, 1990 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL C-CONSTRUCTION OTHER OPTIONAL
Mar 16, 1990 VP-VIOLATION UNSERVED ECB-ACTIVE C-CONSTRUCTION OTHER OPTIONAL C-CONSTRUCTION OTHER OPTIONAL