Manhattan Chelsea-Hudson Yards
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
54 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Jan 20, 1989 | V*-DOB VIOLATION - Resolved | E-ELEVATOR ELEVATORREQUIRED | 51-REMOVE ALL LOCKS FROM ALL HOSITWAY DOOR 52-PROVIDE AN OUTSIDE COMMUNICATE SYSTEM 53-COVER ALL HOLES IN ALL HOSITWAY DOORS 54-PUT BACK IN OPERATION TO A PROPER INSPECTION CAN BE MADE |
| Jan 20, 1989 | V*-DOB VIOLATION - Resolved | E-ELEVATOR ELEVATORREQUIRED | 51-REMOVE ALL LOCKS FROM ALL HOSITWAY DOORS 52-PROVIDE AN OUT- SIDE COMMUNICATE SYSTEM 53-COVER HOLES IN ALL HOSITWAY DOORS |
| Jan 19, 1989 | V*-DOB VIOLATION - Resolved | E-ELEVATOR ELEVATORREQUIRED | 51-REPAIR SIDE WALK DOORS STREET LEVEL |
| Jan 19, 1989 | V*-DOB VIOLATION - Resolved | E-ELEVATOR ELEVATORREQUIRED | 45 REMOVE WATER |