Manhattan Chelsea-Hudson Yards
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
5 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Apr 24, 2019 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO COMPLY WITH COMMISSIONER'S ORDER # 334056 ISSUED ON 8/9/18 TO REPAIR BLDG UNDER PERMIT.PERMIT FOR REPAIR WORK TO BE OBTAINED BY 9/1/18 AS OF 4/24/19 NO JOB HAS BEEN FILED WITH THE DEPARTMENT COMPLY WITH COMMISSIONER ORDER # 334056 IMMEDIATELY |
| Aug 9, 2018 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FTM 4 STRY+CELL SEMI ATTACH MASONRY WALLS&WOOD FRAMED FLRS.BLDG EXT WALLS IN DISREPAIR AT FRONT WALL PARAPET IS SEPARATING&BOWING.VARIOUS CRACK ON BRICK ARE NOTED THROUGHOUT.CRACK&SPALL STUCCO FOUND AT SOUTH WALL.BRICK CRACK NOTED AT FRONT WALL.REMEDY:OWN ENGAGE LIC PE&CONT'R EVAL BLDG&PERF RPR.FILE PERM NO LATER 8/23/18.START WRK BY 9/1/18 |
| Aug 7, 2018 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | EMERG WRK.4 STRY+CELL MASONRY WALLS&WOODFRAME BLDG.FRONT PARAPET IS BOWING&BRICKS ARE MISS AT CORNER W/NORTH WALL LOOSE BRICK&COOPING IN DANGER OF FALL.FIRE ESCAPE DETER&1 STEP IS LOOSE.REMEDY:OWN IMMED PROV FIRE GAURD UNTIL OVERHEAD HAZZARD BEEN REMOVE&RPRS OF FIRE ESCAPE ARE PERFORM.REMOVE ALL LOOSE BRICK&COOP.START IMMED&FILE PERM BY 8/10/18 |
| Aug 6, 2018 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | DUE TO BUILDING AT 156 8TH AVENUE HAD FACADE COLLAPSE AT THE 4TH FLOOR AFFECTING THE MASONRY FACADE AT 154 8TH AVENUE |
| Nov 14, 1988 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |