NYC Building Report

Manhattan Midtown South-Flatiron-Union Square

152 Madison Avenue, Manhattan

DOB violations

Department of Buildings violations attached to this BIN or tax lot.

84 records

Date Status Type Summary
Sep 23, 2024 V*-DOB VIOLATION - DISMISSED LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION
Apr 24, 2024 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. NOTE: OBSERVED AT VIEW AREA EXPOSURE 1 EAST ELEVATION DEFECT AT WINDOW LINTEL AND SILL. 38TH FLOOR. EXPOSURE 2 DEFECTED WINDOW LINTELS. EXPOSURE4 BULGING AT PARAPET & VERTICAL CRACK NORTH EAST CORNER. ROOF: BULGING, CRACKS, SPALLING ERRODED JOINTS. REMEDY: REPAIR AND/OR REPLACE
Dec 19, 2023 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL EMERGENCY WORK ORDER DUE TO LARGE VERTICLE CORNER OF EXPO#4 SPALLING COATING ON STONE WORK&SPALLING STONE ON EXP#1GRD LEVELSPALLING/SPALLED BRICK WORK.BULGING BRICK WORK,DAMAGED @ FIRESTAIR ON EXP##3 ALL EXPO DAMAGED MORTAR JOINTS& BLDGE BRICK ON EXP#4 BULGING BRICK@ ROOF REMEDY IMMED.REPAIR/TAKE DOWN ANY LOOSE MATERIAL UNDER DIRECT SUPERVLIC PROF
Dec 19, 2023 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER LARGE VERTICLE CRACK AT THE CORNER OF EXPOSURE#4 SPALLED STONE ON EXPO#1@GROUND LEVEL SPALLED/SPALLING BRICK WORK BUILDING BRICK WORK DAMAGED MASONRY AT ALL EXPOSURESDAMAGED MORTAR JOINTS AND BULGING BRICK AT ROOF LEVEL STEP CRACK ANDSPALLED BRICK REMEDY MAINTAIN BLDGE FIX OR REPLACE
Oct 4, 2023 V-DOB VIOLATION - ACTIVE AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
Oct 4, 2023 V-DOB VIOLATION - ACTIVE AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
Aug 24, 2023 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER.OBSERVE LARGE VERTICLE CRACK@CORNER OF EXPOSURES/AND 4 SPALLING COATING ON STONE WORK&SPALLED STONE ON EXP#1 @GROUND LEVEL.SPALLED/SPALLINGBRICK WORK BUILDING BRICK WORK,DAMAGED MASONRY @FIRE STAIRS ALL @ EXP#3DAMAGE MORTAR JOINTS&BULGING ON EXP#4 REMEDY:MAINTAIN BUILDING FIX OR REPLACE
Jun 30, 2023 V*-DOB VIOLATION - DISMISSED LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION
Jun 20, 2023 V*-DOB VIOLATION - DISMISSED LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION
Jun 20, 2023 V*-DOB VIOLATION - DISMISSED LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION
May 19, 2023 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER:EXPOSURE 1 EAST ELEVATION DAMAGE AT 1 FLR CORNER AND 2NDCRACK WINDOW PANE AT LOWER FLR EXPOSURE#2SPALL AT LOWER WINDOW SILLS AND AT 3 FLR DAMAGED AT LINTEL EXPPOSURE DAMAGED MASONRY@ EMERGENCY FIRE STAIRS.BULGING 4 FLR CORNER OF 1&4.REMEDY:MAINTAIN BUILDING REPAIR AND OR REPLACE
Apr 25, 2023 V*-DOB VIOLATION - DISMISSED LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION
Aug 2, 2022 V*-DOB VIOLATION - DISMISSED BENCH-FAILURE TO BENCHMARK NONE FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
May 11, 2021 V-DOB VIOLATION - ACTIVE FISPHAZ-HAZARDOUS CONDITION (FACADE) FACADE REQUIRED CYCLE 9C UNSAFE REPORT FILED
May 11, 2021 V-DOB VIOLATION - ACTIVE FISPHAZ-HAZARDOUS CONDITION (FACADE) FACADE REQUIRED CYCLE 8C UNSAFE REPORT FILED
Aug 31, 2020 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
Aug 31, 2020 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
Aug 31, 2020 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
Aug 31, 2020 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
Dec 26, 2019 V-DOB VIOLATION - ACTIVE AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
Nov 8, 2019 V*-DOB VIOLATION - DISMISSED LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT
Sep 3, 2019 V*-DOB VIOLATION - DISMISSED LL2604S-SPRINKLER NONE FAILED TO FILE FINAL SPRINKLER REPORT BY JULY 1, 2019
Jul 26, 2019 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
Jul 26, 2019 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
Jul 26, 2019 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
Jul 26, 2019 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED CEASE USE
May 16, 2019 V*-DOB VIOLATION - DISMISSED AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
Apr 30, 2019 V-DOB VIOLATION - ACTIVE FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED FAILED TO FILE FISP CYCLE 8C TECHNICAL REPORT BY 02/21/2019
Oct 4, 2018 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
Oct 4, 2018 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
Oct 4, 2018 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
Oct 4, 2018 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
Aug 11, 2017 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
Aug 2, 2016 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
Aug 2, 2016 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
Aug 17, 2015 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
Aug 17, 2015 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
Aug 17, 2015 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
Aug 17, 2015 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
Aug 12, 2014 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
Aug 12, 2014 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
Aug 12, 2014 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
Jun 6, 2014 V*-DOB VIOLATION - DISMISSED BENCH-FAILURE TO BENCHMARK NONE FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
Dec 31, 2013 V*-DOB VIOLATION - DISMISSED FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED FAILED TO FILE FISP CYCLE 7C TECHNICAL REPORT BY 02/21/2013
Jun 3, 2013 V*-DOB VIOLATION - DISMISSED BENCH-FAILURE TO BENCHMARK NONE FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
Aug 29, 2012 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
Aug 29, 2012 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
Aug 29, 2012 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
Aug 29, 2012 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
May 3, 2012 V*-DOB VIOLATION - DISMISSED BENCH-FAILURE TO BENCHMARK NONE FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4