NYC Building Report

Manhattan Greenwich Village

15 East 9 Street, Manhattan

DOB violations

Department of Buildings violations attached to this BIN or tax lot.

15 records

Date Status Type Summary
Jan 16, 2026 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER AS PER 28.301 1 OF THE NYC ADMIN CODE, NOTED AT TIME OF INSPECTION OBSERVED NUMEROUS VERTICAL BRICK CRACKS ALONG EXPOSURE 1 ALSO SOME SPALLING BRICK WORK AT PARAPET ON EXPOSURE 1. REMEDY: REPAIR AND OR REPLACE
Apr 25, 2023 V-DOB VIOLATION - ACTIVE LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION
Sep 2, 2020 V-DOB VIOLATION - ACTIVE AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
Mar 5, 2020 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FTC WITH COMMISSIONER ORDER 322397 DATED 12/18/19 REQUIRING OWNER TO RETAIN NYSPE EVALUATE ENTIRE BLDG&PREPARE DWGS.BLGD REPAIRS STARTING UNDER PERMIT BY 3/2/20 & BE COMPLETED BY 6/5/20.NO PERMIT OBTAINED AS OF 3/5/20. IMMEDIATELY COMPLY W/COMMISSIONER'S ORDER 322397
Dec 18, 2019 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL EMERGENCY WORK ORDER:EXP1 BRICK BULGING 2-3 INCHES OUT-AREA APPROX 16SQFT.@1FL NEAR EXP 1/2 CORNER.WALLSECTION UNSTABLE.OWNR IMMD RETN PE AND CONTRCT TO IMMD STABALIZE BULGEXP1 WALL AT 1FL.WORK UNDER PE SUPV FILE JOB WITHIN 2 DAYS OF START OF WORK.PROVIDE FEU DAILY REPORTS FOR ALL WORK
Dec 18, 2019 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FTM:EXP1 BRICK FACADE BULGED 2-3"@1FL NEAR 1/2 CRNR.STEPCRACKS FULL HEIGHT CRACK NEAR 1/4 CRNR.CHIMNEYS @ INTERIOR DETERIORATED & CRACKED CHIMNEY FLUE BROKEN@EXP1/4 CRNR.INTR CRACK@4FL.INTERIOR CRACK @ 4TH FL WINDOW HEADER.OWNER RETAIN PE EVALUATE ENTIRE BLDG&PREPARE REPR PLANS REPR BLDG UNDER PERMIT STARTING BY 3/2/20 AND COMPLETE BY 6/5/20
Dec 18, 2019 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL EMERG WRK ORDER:EXP1 BRICK HAD BULGED OUT APPX 2 TO 3 INCHES APPX 16 SF NEAR EXP1/2 CRNR,STEP CRACKS BTWN WINDOWS;FULL HEIGHT CRACK NEAR 1/4 CRNR;CRACKED STONE SILL AT 4TH FLOOR FIRE BASKET.IMMD ERECT S/W/S ALONG EXP1.ERECT T/B/F WITH LATERAL BRACES AT EXP1 NEAR EXP1/2 FACADE FAÇADE BULGE.FILE&PULL PERMIT WITHIN 2 DAYS FROM START OF WORK
Nov 8, 2019 V-DOB VIOLATION - ACTIVE LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT
Apr 6, 2018 V-DOB VIOLATION - ACTIVE LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT
Feb 24, 2017 V-DOB VIOLATION - ACTIVE LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT
Oct 1, 2015 V*-DOB VIOLATION - DISMISSED LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2014 INSPECTION REPORT
Mar 3, 2015 V*-DOB VIOLATION - DISMISSED LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT
Dec 31, 2002 V*-DOB VIOLATION - DISMISSED LANDMK-LANDMARK NONE LANDMK-LANDMARK NONE
Sep 12, 1989 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL C-CONSTRUCTION OTHER OPTIONAL
Sep 12, 1989 VP-VIOLATION UNSERVED ECB-ACTIVE C-CONSTRUCTION OTHER OPTIONAL C-CONSTRUCTION OTHER OPTIONAL