NYC Building Report

Manhattan Murray Hill-Kips Bay

145 East 35 Street, Manhattan

HPD violations

Housing Maintenance Code violations are filed by tax lot (BBL 1-00891-0030), so they can include other buildings on the same lot.

182 records

Date Class Status Apartment Summary
Jan 10, 2024 B VIOLATION CLOSED 8FW § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE 3rd ROOM FROM NORTH LOCATED AT APT 8FW, 8th STORY, 1st APARTMENT FROM SOUTH AT WEST
Jan 10, 2024 B VIOLATION CLOSED 8FW § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING IN THE 3rd ROOM FROM NORTH LOCATED AT APT 8FW, 8th STORY, 1st APARTMENT FROM SOUTH AT WEST
Dec 19, 2023 B VIOLATION CLOSED 8RW § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE 2nd ROOM FROM EAST LOCATED AT APT 8RW, 8th STORY, 3rd APARTMENT FROM SOUTH AT WEST
Dec 19, 2023 B VIOLATION CLOSED 8RW § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER THE CEILING IN THE 2nd ROOM FROM EAST LOCATED AT APT 8RW, 8th STORY, 3rd APARTMENT FROM SOUTH AT WEST
Dec 18, 2023 C VIOLATION CLOSED 2RE § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES IN THE ENTRANCE LOCATED AT APT 2RE, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST
Dec 18, 2023 B VIOLATION CLOSED 2RE § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 2RE, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST
Dec 18, 2023 B VIOLATION CLOSED 2RE § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 2RE, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST
Dec 18, 2023 B VIOLATION CLOSED 2RE § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE NORTH WALL IN THE 2nd ROOM FROM EAST LOCATED AT APT 2RE, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST
Dec 18, 2023 B DEFECT LETTER ISSUED 2RE § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROXIMATELY 15 SQ FT AT THE CEILING IN THE 2nd ROOM FROM EAST LOCATED AT APT 2RE, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST
Dec 18, 2023 A VIOLATION CLOSED 2RE § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING IN THE 2nd ROOM FROM EAST LOCATED AT APT 2RE, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST
Dec 18, 2023 B VIOLATION CLOSED 2RE § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 2nd ROOM FROM EAST LOCATED AT APT 2RE, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST
Nov 30, 2023 B VIOLATION CLOSED 8RW § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 8RW, 8th STORY, 3rd APARTMENT FROM SOUTH AT WEST
Nov 30, 2023 B VIOLATION CLOSED 8RW § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 8RW, 8th STORY, 3rd APARTMENT FROM SOUTH AT WEST
Nov 30, 2023 B VIOLATION CLOSED 8RW § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT WEST WALL IN THE 2nd ROOM FROM EAST LOCATED AT APT 8RW, 8th STORY, 3rd APARTMENT FROM SOUTH AT WEST
Nov 30, 2023 B VIOLATION CLOSED 8RW § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER THE CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 8RW, 8th STORY, 3rd APARTMENT FROM SOUTH AT WEST
Nov 30, 2023 C VIOLATION CLOSED 8RW § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 1st ROOM FROM EAST LOCATED AT APT 8RW, 8th STORY, 3rd APARTMENT FROM SOUTH AT WEST
Nov 30, 2023 B DEFECT LETTER ISSUED 8RW § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT CEILING APPROXIMATELY 4 SQ. FT AND EAST WALL APPROXIMATELY 7 SQ. FT. IN THE PRIVATE HALLWAY LOCATED AT APT 8RW, 8th STORY, 3rd APARTMENT FROM SOUTH AT WEST
Nov 30, 2023 B VIOLATION CLOSED 8RW § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER THE CEILING IN THE 2nd ROOM FROM EAST LOCATED AT APT 8RW, 8th STORY, 3rd APARTMENT FROM SOUTH AT WEST
Nov 30, 2023 B VIOLATION CLOSED 8RW § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER THE CEILING IN THE 1st ROOM FROM EAST LOCATED AT APT 8RW, 8th STORY, 3rd APARTMENT FROM SOUTH AT WEST
Oct 18, 2023 B VIOLATION CLOSED 8RW § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 8RW, 8th STORY, 3rd APARTMENT FROM SOUTH AT WEST
Oct 18, 2023 B VIOLATION CLOSED 8RW § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 8RW, 8th STORY, 3rd APARTMENT FROM SOUTH AT WEST
Oct 18, 2023 B VIOLATION CLOSED 8RW § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND EAST WALL IN THE PRIVATE HALLWAY LOCATED AT APT 8RW, 8th STORY, 3rd APARTMENT FROM SOUTH AT WEST
Oct 18, 2023 B VIOLATION CLOSED 8RW § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 8RW, 8th STORY, 3rd APARTMENT FROM SOUTH AT WEST
Oct 18, 2023 B VIOLATION CLOSED 8RW § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND WEST WALL IN THE 2nd ROOM FROM EAST LOCATED AT APT 8RW, 8th STORY, 3rd APARTMENT FROM SOUTH AT WEST
Oct 18, 2023 B VIOLATION CLOSED 8RW § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING, SOUTH AND EAST WALLS IN THE 3rd ROOM FROM EAST LOCATED AT APT 8RW, 8th STORY, 3rd APARTMENT FROM SOUTH AT WEST
Oct 18, 2023 B VIOLATION CLOSED 8RW § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT CEILING IN THE 2nd ROOM FROM EAST LOCATED AT APT 8RW, 8th STORY, 3rd APARTMENT FROM SOUTH AT WEST
Oct 18, 2023 B VIOLATION CLOSED 8RW § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT CEILING IN THE 3rd ROOM FROM EAST LOCATED AT APT 8RW, 8th STORY, 3rd APARTMENT FROM SOUTH AT WEST
Oct 6, 2023 B VIOLATION CLOSED 8RW § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 8RW, 8th STORY, 3rd APARTMENT FROM SOUTH AT WEST
Oct 6, 2023 B VIOLATION CLOSED 8RW § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 8RW, 8th STORY, 3rd APARTMENT FROM SOUTH AT WEST
Oct 6, 2023 B VIOLATION CLOSED 8RW § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE 2nd ROOM FROM EAST LOCATED AT APT 8RW, 8th STORY, 3rd APARTMENT FROM SOUTH AT WEST
Oct 6, 2023 B VIOLATION CLOSED 8RW § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING IN THE 2nd ROOM FROM EAST LOCATED AT APT 8RW, 8th STORY, 3rd APARTMENT FROM SOUTH AT WEST
Oct 6, 2023 B VIOLATION CLOSED 8RW § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE 1st ROOM FROM EAST LOCATED AT APT 8RW, 8th STORY, 3rd APARTMENT FROM SOUTH AT WEST
Oct 6, 2023 B VIOLATION CLOSED 8RW § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER THE CEILING IN THE 1st ROOM FROM EAST LOCATED AT APT 8RW, 8th STORY, 3rd APARTMENT FROM SOUTH AT WEST
Sep 30, 2023 C VIOLATION CLOSED Not available § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES AT BULKHEAD TO ROOF , 8th STORY
Sep 30, 2023 B VIOLATION CLOSED 8RW § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 8RW, 8th STORY, 3rd APARTMENT FROM SOUTH AT WEST
Sep 30, 2023 B VIOLATION CLOSED 8RW § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 8RW, 8th STORY, 3rd APARTMENT FROM SOUTH AT WEST
Sep 30, 2023 B VIOLATION CLOSED 8RW § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE 2nd ROOM FROM EAST LOCATED AT APT 8RW, 8th STORY, 3rd APARTMENT FROM SOUTH AT WEST
Sep 30, 2023 B VIOLATION CLOSED 8RW § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING IN THE 2nd ROOM FROM EAST LOCATED AT APT 8RW, 8th STORY, 3rd APARTMENT FROM SOUTH AT WEST
Sep 30, 2023 B VIOLATION CLOSED 8RW § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE 1st ROOM FROM EAST LOCATED AT APT 8RW, 8th STORY, 3rd APARTMENT FROM SOUTH AT WEST
Sep 30, 2023 C VIOLATION CLOSED 8RW § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING IN THE 1st ROOM FROM EAST LOCATED AT APT 8RW, 8th STORY, 3rd APARTMENT FROM SOUTH AT WEST
Sep 27, 2023 B VIOLATION CLOSED 8RW § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 8RW, 8th STORY, 3rd APARTMENT FROM SOUTH AT WEST
Sep 27, 2023 B VIOLATION CLOSED 8RW § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 8RW, 8th STORY, 3rd APARTMENT FROM SOUTH AT WEST
Sep 27, 2023 B VIOLATION CLOSED 8RW § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING IN THE 2nd ROOM FROM EAST LOCATED AT APT 8RW, 8th STORY, 3rd APARTMENT FROM SOUTH AT WEST
Sep 27, 2023 B VIOLATION CLOSED 8RW § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 2nd ROOM FROM EAST LOCATED AT APT 8RW, 8th STORY, 3rd APARTMENT FROM SOUTH AT WEST
Sep 27, 2023 B VIOLATION CLOSED 8RW § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 1st ROOM FROM EAST LOCATED AT APT 8RW, 8th STORY, 3rd APARTMENT FROM SOUTH AT WEST
Sep 27, 2023 B VIOLATION CLOSED 8RW § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING IN THE 1st ROOM FROM EAST LOCATED AT APT 8RW, 8th STORY, 3rd APARTMENT FROM SOUTH AT WEST
Sep 22, 2023 B DEFECT LETTER ISSUED 8RW § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT CEILING APPROX. 1 (SQ FT) IN THE 1st ROOM FROM EAST LOCATED AT APT 8RW UPPER LEVEL, 8th STORY, 3rd APARTMENT FROM SOUTH AT WEST ORIGINAL VIOLATION 16245348 ISSUED 22-SEP-23 HAS BEEN UPGRADED TO CLASS B PER ADMINISTRATIVE CODE §27-2017.3a(3)(a) or (b).
Sep 22, 2023 B VIOLATION CLOSED 8RW § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER THE CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 8RW UPPER LEVEL, 8th STORY, 3rd APARTMENT FROM SOUTH AT WEST
Sep 22, 2023 B VIOLATION CLOSED 8RW § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 8RW UPPER LEVEL, 8th STORY, 3rd APARTMENT FROM SOUTH AT WEST
Sep 22, 2023 A VIOLATION CLOSED 8RW § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT CEILING APPROX. 1 (SQ FT) IN THE 1st ROOM FROM EAST LOCATED AT APT 8RW UPPER LEVEL, 8th STORY, 3rd APARTMENT FROM SOUTH AT WEST