Manhattan Murray Hill-Kips Bay
HPD violations
Housing Maintenance Code violations are filed by tax lot (BBL 1-00891-0030), so they can include other buildings on the same lot.
182 records
| Date | Class | Status | Apartment | Summary |
|---|---|---|---|---|
| Jan 10, 2024 | B | VIOLATION CLOSED | 8FW | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE 3rd ROOM FROM NORTH LOCATED AT APT 8FW, 8th STORY, 1st APARTMENT FROM SOUTH AT WEST |
| Jan 10, 2024 | B | VIOLATION CLOSED | 8FW | § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING IN THE 3rd ROOM FROM NORTH LOCATED AT APT 8FW, 8th STORY, 1st APARTMENT FROM SOUTH AT WEST |
| Dec 19, 2023 | B | VIOLATION CLOSED | 8RW | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE 2nd ROOM FROM EAST LOCATED AT APT 8RW, 8th STORY, 3rd APARTMENT FROM SOUTH AT WEST |
| Dec 19, 2023 | B | VIOLATION CLOSED | 8RW | § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER THE CEILING IN THE 2nd ROOM FROM EAST LOCATED AT APT 8RW, 8th STORY, 3rd APARTMENT FROM SOUTH AT WEST |
| Dec 18, 2023 | C | VIOLATION CLOSED | 2RE | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES IN THE ENTRANCE LOCATED AT APT 2RE, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST |
| Dec 18, 2023 | B | VIOLATION CLOSED | 2RE | § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 2RE, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST |
| Dec 18, 2023 | B | VIOLATION CLOSED | 2RE | § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 2RE, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST |
| Dec 18, 2023 | B | VIOLATION CLOSED | 2RE | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE NORTH WALL IN THE 2nd ROOM FROM EAST LOCATED AT APT 2RE, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST |
| Dec 18, 2023 | B | DEFECT LETTER ISSUED | 2RE | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROXIMATELY 15 SQ FT AT THE CEILING IN THE 2nd ROOM FROM EAST LOCATED AT APT 2RE, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST |
| Dec 18, 2023 | A | VIOLATION CLOSED | 2RE | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING IN THE 2nd ROOM FROM EAST LOCATED AT APT 2RE, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST |
| Dec 18, 2023 | B | VIOLATION CLOSED | 2RE | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 2nd ROOM FROM EAST LOCATED AT APT 2RE, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST |
| Nov 30, 2023 | B | VIOLATION CLOSED | 8RW | § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 8RW, 8th STORY, 3rd APARTMENT FROM SOUTH AT WEST |
| Nov 30, 2023 | B | VIOLATION CLOSED | 8RW | § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 8RW, 8th STORY, 3rd APARTMENT FROM SOUTH AT WEST |
| Nov 30, 2023 | B | VIOLATION CLOSED | 8RW | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT WEST WALL IN THE 2nd ROOM FROM EAST LOCATED AT APT 8RW, 8th STORY, 3rd APARTMENT FROM SOUTH AT WEST |
| Nov 30, 2023 | B | VIOLATION CLOSED | 8RW | § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER THE CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 8RW, 8th STORY, 3rd APARTMENT FROM SOUTH AT WEST |
| Nov 30, 2023 | C | VIOLATION CLOSED | 8RW | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 1st ROOM FROM EAST LOCATED AT APT 8RW, 8th STORY, 3rd APARTMENT FROM SOUTH AT WEST |
| Nov 30, 2023 | B | DEFECT LETTER ISSUED | 8RW | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT CEILING APPROXIMATELY 4 SQ. FT AND EAST WALL APPROXIMATELY 7 SQ. FT. IN THE PRIVATE HALLWAY LOCATED AT APT 8RW, 8th STORY, 3rd APARTMENT FROM SOUTH AT WEST |
| Nov 30, 2023 | B | VIOLATION CLOSED | 8RW | § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER THE CEILING IN THE 2nd ROOM FROM EAST LOCATED AT APT 8RW, 8th STORY, 3rd APARTMENT FROM SOUTH AT WEST |
| Nov 30, 2023 | B | VIOLATION CLOSED | 8RW | § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER THE CEILING IN THE 1st ROOM FROM EAST LOCATED AT APT 8RW, 8th STORY, 3rd APARTMENT FROM SOUTH AT WEST |
| Oct 18, 2023 | B | VIOLATION CLOSED | 8RW | § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 8RW, 8th STORY, 3rd APARTMENT FROM SOUTH AT WEST |
| Oct 18, 2023 | B | VIOLATION CLOSED | 8RW | § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 8RW, 8th STORY, 3rd APARTMENT FROM SOUTH AT WEST |
| Oct 18, 2023 | B | VIOLATION CLOSED | 8RW | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND EAST WALL IN THE PRIVATE HALLWAY LOCATED AT APT 8RW, 8th STORY, 3rd APARTMENT FROM SOUTH AT WEST |
| Oct 18, 2023 | B | VIOLATION CLOSED | 8RW | § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 8RW, 8th STORY, 3rd APARTMENT FROM SOUTH AT WEST |
| Oct 18, 2023 | B | VIOLATION CLOSED | 8RW | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND WEST WALL IN THE 2nd ROOM FROM EAST LOCATED AT APT 8RW, 8th STORY, 3rd APARTMENT FROM SOUTH AT WEST |
| Oct 18, 2023 | B | VIOLATION CLOSED | 8RW | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING, SOUTH AND EAST WALLS IN THE 3rd ROOM FROM EAST LOCATED AT APT 8RW, 8th STORY, 3rd APARTMENT FROM SOUTH AT WEST |
| Oct 18, 2023 | B | VIOLATION CLOSED | 8RW | § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT CEILING IN THE 2nd ROOM FROM EAST LOCATED AT APT 8RW, 8th STORY, 3rd APARTMENT FROM SOUTH AT WEST |
| Oct 18, 2023 | B | VIOLATION CLOSED | 8RW | § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT CEILING IN THE 3rd ROOM FROM EAST LOCATED AT APT 8RW, 8th STORY, 3rd APARTMENT FROM SOUTH AT WEST |
| Oct 6, 2023 | B | VIOLATION CLOSED | 8RW | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 8RW, 8th STORY, 3rd APARTMENT FROM SOUTH AT WEST |
| Oct 6, 2023 | B | VIOLATION CLOSED | 8RW | § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 8RW, 8th STORY, 3rd APARTMENT FROM SOUTH AT WEST |
| Oct 6, 2023 | B | VIOLATION CLOSED | 8RW | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE 2nd ROOM FROM EAST LOCATED AT APT 8RW, 8th STORY, 3rd APARTMENT FROM SOUTH AT WEST |
| Oct 6, 2023 | B | VIOLATION CLOSED | 8RW | § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING IN THE 2nd ROOM FROM EAST LOCATED AT APT 8RW, 8th STORY, 3rd APARTMENT FROM SOUTH AT WEST |
| Oct 6, 2023 | B | VIOLATION CLOSED | 8RW | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE 1st ROOM FROM EAST LOCATED AT APT 8RW, 8th STORY, 3rd APARTMENT FROM SOUTH AT WEST |
| Oct 6, 2023 | B | VIOLATION CLOSED | 8RW | § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER THE CEILING IN THE 1st ROOM FROM EAST LOCATED AT APT 8RW, 8th STORY, 3rd APARTMENT FROM SOUTH AT WEST |
| Sep 30, 2023 | C | VIOLATION CLOSED | Not available | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES AT BULKHEAD TO ROOF , 8th STORY |
| Sep 30, 2023 | B | VIOLATION CLOSED | 8RW | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 8RW, 8th STORY, 3rd APARTMENT FROM SOUTH AT WEST |
| Sep 30, 2023 | B | VIOLATION CLOSED | 8RW | § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 8RW, 8th STORY, 3rd APARTMENT FROM SOUTH AT WEST |
| Sep 30, 2023 | B | VIOLATION CLOSED | 8RW | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE 2nd ROOM FROM EAST LOCATED AT APT 8RW, 8th STORY, 3rd APARTMENT FROM SOUTH AT WEST |
| Sep 30, 2023 | B | VIOLATION CLOSED | 8RW | § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING IN THE 2nd ROOM FROM EAST LOCATED AT APT 8RW, 8th STORY, 3rd APARTMENT FROM SOUTH AT WEST |
| Sep 30, 2023 | B | VIOLATION CLOSED | 8RW | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE 1st ROOM FROM EAST LOCATED AT APT 8RW, 8th STORY, 3rd APARTMENT FROM SOUTH AT WEST |
| Sep 30, 2023 | C | VIOLATION CLOSED | 8RW | § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING IN THE 1st ROOM FROM EAST LOCATED AT APT 8RW, 8th STORY, 3rd APARTMENT FROM SOUTH AT WEST |
| Sep 27, 2023 | B | VIOLATION CLOSED | 8RW | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 8RW, 8th STORY, 3rd APARTMENT FROM SOUTH AT WEST |
| Sep 27, 2023 | B | VIOLATION CLOSED | 8RW | § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 8RW, 8th STORY, 3rd APARTMENT FROM SOUTH AT WEST |
| Sep 27, 2023 | B | VIOLATION CLOSED | 8RW | § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING IN THE 2nd ROOM FROM EAST LOCATED AT APT 8RW, 8th STORY, 3rd APARTMENT FROM SOUTH AT WEST |
| Sep 27, 2023 | B | VIOLATION CLOSED | 8RW | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 2nd ROOM FROM EAST LOCATED AT APT 8RW, 8th STORY, 3rd APARTMENT FROM SOUTH AT WEST |
| Sep 27, 2023 | B | VIOLATION CLOSED | 8RW | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 1st ROOM FROM EAST LOCATED AT APT 8RW, 8th STORY, 3rd APARTMENT FROM SOUTH AT WEST |
| Sep 27, 2023 | B | VIOLATION CLOSED | 8RW | § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING IN THE 1st ROOM FROM EAST LOCATED AT APT 8RW, 8th STORY, 3rd APARTMENT FROM SOUTH AT WEST |
| Sep 22, 2023 | B | DEFECT LETTER ISSUED | 8RW | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT CEILING APPROX. 1 (SQ FT) IN THE 1st ROOM FROM EAST LOCATED AT APT 8RW UPPER LEVEL, 8th STORY, 3rd APARTMENT FROM SOUTH AT WEST ORIGINAL VIOLATION 16245348 ISSUED 22-SEP-23 HAS BEEN UPGRADED TO CLASS B PER ADMINISTRATIVE CODE §27-2017.3a(3)(a) or (b). |
| Sep 22, 2023 | B | VIOLATION CLOSED | 8RW | § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER THE CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 8RW UPPER LEVEL, 8th STORY, 3rd APARTMENT FROM SOUTH AT WEST |
| Sep 22, 2023 | B | VIOLATION CLOSED | 8RW | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 8RW UPPER LEVEL, 8th STORY, 3rd APARTMENT FROM SOUTH AT WEST |
| Sep 22, 2023 | A | VIOLATION CLOSED | 8RW | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT CEILING APPROX. 1 (SQ FT) IN THE 1st ROOM FROM EAST LOCATED AT APT 8RW UPPER LEVEL, 8th STORY, 3rd APARTMENT FROM SOUTH AT WEST |