Manhattan Midtown-Times Square
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
141 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Nov 26, 2024 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Sep 26, 2024 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN.THERE'S 1 1/2"THICK MARBLE CLADDING AT THE EXP 1/2 CRNR UP TO 16TH STRY&ALSO @EXP2/3 NORTHEAST&EXP1/2(SOUTHWEST)CRNRS.@ EXP1/2(NORTHWEST)CRNR,4MARBLE PANELS HAD APPRX 2"OUTWRD.1.NYSPE QEWI TO IMMED EVAL THE MARBLE CLADDNG&DSGN RPAIRS,2.FILE FOR PRMTS BY 12/2/243.OBTN PRMTS&STRT WRK BY 12/16/24 |
| Sep 26, 2024 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | EMERGENCY WRK.THERES 1/2"THCK MARBLE CLADDNG@EXP1/2CRNR UP TO THE 16TH STRY&ALSO@EXP 2/3(NORTHEAST)CRNR,4MARBLE PANELS HAD APPRX2"OUTWRD BULGE@EXP2 SIDE ON 3RDSTRY.ALSO@EXP 1/2CRNR,2MARBLE PANELS.1.IMMED INSTLL HEAVY DUTY SDWALK SHED ALONG ENT FRNTGE ON EXP1 &EXP2,2.CMPLT EMRGNCY STBILIZATN WRK PRIOR TO INSTLL@EXP1/2 |
| Sep 26, 2024 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | EMERGENCY WORK.@THE EXP1/2 CRNR,THERE WAS 4MARBLE PANELS W/2" OUTWRD BLGE@EXP2 SIDE ON 3RD STRY.ALSO@EXP 1/2CRNR, MARBLE PANELS HAD A 1/2 OUTWRD BLGE@EXP1 SIDE ON 3RD&4THFL LEVELS.1.IMMED INSTLLSHRNG&BRACNG & RMVE BULGD MARBLE CLADDNG@DIRCTN OF PE,2.ALL WRK TO BE DRCTLY SPRVSD& DRCTD BY ONSITE NYSPE |
| Sep 26, 2024 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | EMERGENCY WORK.AT THE EXP 1/2 CORNER,THERE WERE 4MARBLE PANELS W/A 24 OUTWRD BULGE@EXP SIDE ON 3RD STRY.ALSO AT EXP 1/2CRNR,2MARBLE PANELS HAD A 1/2 OUTWRD BYKGE@EXP 1 SIDE ON 3RD&4THFL LVL.1.IMMED INSTLL CONSTRCTN FENCE TO ENCLOSRE 15MIN OF SDWALK @EXP1&EXP2 FOR DSTNCE OF 30''ALNG EXP1&40'ALNG EXP2 TO SRRND |
| Sep 26, 2024 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN FACADE & APPURTENANCES. MARBLE CLADDING FAILURE @3 FL, EXP2, N ELEV. REMEDY:THE OWNER TO RETAIN SERVICE OF NYS REG DESIGN PROF WITH QEWI CERTIFICATE & MARBLE WORKS EXPERIENCE TO INSPECT & EVAL 100% ON ALL FACADE-MARBLE STONES CLADDING WORKS @ ALL ELEVS. PROVIDE REPORT FACADES@BUILDINGS.NYC.GOV NO LATER THAN 10/10/2024 |
| Sep 26, 2024 | V-DOB VIOLATION - ACTIVE | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | PROVIDE APPRX 40 LINEAR FEET OF CONSTRUCTION FENCE @ EXPO#2 (WEST 40 S TREET) TO EXTEND TO THE CURB LINE & APPRX 30 LINEAR FEET OF CONSTRUCTI ON FENCE @ EXPO#1 (BROADWAY) TO EXTEND TO THE CURB LINE IN AN L SHAPE TO SAFEGUARD PUBLIC AND PROPERTY |
| Sep 26, 2024 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | OBSERVED 2-EXTERIOR MARBLE PANEL APPROX. SIZE 4'-0" X 10'-0" EACH DISLODGED, BUILDING POPPED-OUT AND LOOSE ON 3RD FLOOR LEVEL AT THE CORNER OF EXPO # 01 & 02. BULGING LOOSE PANELS ARE HANGING OVER MTA SUBWAY ENTRANCE AT W 40 STREET AND POTENTIAL FALLING CONDITION. |
| Feb 21, 2022 | V-DOB VIOLATION - ACTIVE | FISPFCS-FAILURE TO CORRECT SWARMP CONDITIONS (FACADE) FACADE REQUIRED | CYCLE 9A FAILURE TO CORRECT SWARMP CONDITIONS |
| Jul 22, 2021 | V*-DOB VIOLATION - Resolved | E-ELEVATOR ELEVATORREQUIRED | E-ELEVATOR ELEVATORREQUIRED |
| Jul 20, 2020 | V*-DOB VIOLATION - Resolved | E-ELEVATOR ELEVATORREQUIRED | E-ELEVATOR ELEVATORREQUIRED |
| Jul 20, 2020 | V*-DOB VIOLATION - Resolved | E-ELEVATOR ELEVATORREQUIRED | E-ELEVATOR ELEVATORREQUIRED |
| Sep 6, 2019 | V*-DOB VIOLATION - DISMISSED | ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED | VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST |
| Sep 6, 2019 | V*-DOB VIOLATION - DISMISSED | ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED | VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST |
| Sep 6, 2019 | V*-DOB VIOLATION - DISMISSED | ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED | VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST |
| Sep 6, 2019 | V*-DOB VIOLATION - DISMISSED | ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED | VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST |
| Sep 6, 2019 | V*-DOB VIOLATION - DISMISSED | ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED | VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST |
| Sep 6, 2019 | V*-DOB VIOLATION - DISMISSED | ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED | VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST |
| Sep 6, 2019 | V*-DOB VIOLATION - DISMISSED | ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED | VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST |
| Sep 6, 2019 | V*-DOB VIOLATION - DISMISSED | ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED | VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST |
| Sep 6, 2019 | V*-DOB VIOLATION - DISMISSED | ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED | VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST |
| Sep 3, 2019 | V*-DOB VIOLATION - DISMISSED | LL2604S-SPRINKLER NONE | FAILED TO FILE FINAL SPRINKLER REPORT BY JULY 1, 2019 |
| Apr 5, 2019 | V*-DOB VIOLATION - DISMISSED | EVCAT1-ELEVATOR ANNUAL INSPECTION / TEST ELEVATORREQUIRED | VIOLATION ISSUED TO ELEVATOR - FAILURE TO FILE CATEGORY 1 2017 INSPECTION/TEST |
| Apr 5, 2019 | V*-DOB VIOLATION - DISMISSED | EVCAT1-ELEVATOR ANNUAL INSPECTION / TEST ELEVATORREQUIRED | VIOLATION ISSUED TO ELEVATOR - FAILURE TO FILE CATEGORY 1 2017 INSPECTION/TEST |
| Apr 5, 2019 | V*-DOB VIOLATION - DISMISSED | EVCAT1-ELEVATOR ANNUAL INSPECTION / TEST ELEVATORREQUIRED | VIOLATION ISSUED TO ELEVATOR - FAILURE TO FILE CATEGORY 1 2017 INSPECTION/TEST |
| Apr 5, 2019 | V*-DOB VIOLATION - DISMISSED | EVCAT1-ELEVATOR ANNUAL INSPECTION / TEST ELEVATORREQUIRED | VIOLATION ISSUED TO ELEVATOR - FAILURE TO FILE CATEGORY 1 2017 INSPECTION/TEST |
| Aug 1, 2018 | V*-DOB VIOLATION - Resolved | E-ELEVATOR ELEVATORREQUIRED | E-ELEVATOR ELEVATORREQUIRED |
| May 31, 2018 | V*-DOB VIOLATION - DISMISSED | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | FAILED TO FILE FISP CYCLE 8A TECHNICAL REPORT BY 02/21/2017 |
| Jan 26, 2018 | V*-DOB VIOLATION - DISMISSED | ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED | VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST |
| Jul 10, 2017 | V*-DOB VIOLATION - Resolved | E-ELEVATOR ELEVATORREQUIRED | E-ELEVATOR ELEVATORREQUIRED |
| Jul 10, 2017 | V*-DOB VIOLATION - Resolved | E-ELEVATOR ELEVATORREQUIRED | E-ELEVATOR ELEVATORREQUIRED |
| Jul 10, 2017 | V*-DOB VIOLATION - Resolved | E-ELEVATOR ELEVATORREQUIRED | E-ELEVATOR ELEVATORREQUIRED |
| Jul 10, 2017 | V*-DOB VIOLATION - Resolved | E-ELEVATOR ELEVATORREQUIRED | E-ELEVATOR ELEVATORREQUIRED |
| Jul 10, 2017 | V*-DOB VIOLATION - Resolved | E-ELEVATOR ELEVATORREQUIRED | E-ELEVATOR ELEVATORREQUIRED |
| Jul 10, 2017 | V*-DOB VIOLATION - Resolved | E-ELEVATOR ELEVATORREQUIRED | E-ELEVATOR ELEVATORREQUIRED |
| Jul 10, 2017 | V*-DOB VIOLATION - Resolved | E-ELEVATOR ELEVATORREQUIRED | E-ELEVATOR ELEVATORREQUIRED |
| Jul 10, 2017 | V*-DOB VIOLATION - Resolved | E-ELEVATOR ELEVATORREQUIRED | E-ELEVATOR ELEVATORREQUIRED |
| Jul 5, 2017 | V*-DOB VIOLATION - Resolved | E-ELEVATOR ELEVATORREQUIRED | E-ELEVATOR ELEVATORREQUIRED |
| Jul 5, 2017 | V*-DOB VIOLATION - Resolved | E-ELEVATOR ELEVATORREQUIRED | E-ELEVATOR ELEVATORREQUIRED |
| Jul 5, 2017 | V*-DOB VIOLATION - Resolved | E-ELEVATOR ELEVATORREQUIRED | E-ELEVATOR ELEVATORREQUIRED |
| Apr 5, 2017 | V-DOB VIOLATION - ACTIVE | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Jan 3, 2017 | V*-DOB VIOLATION - DISMISSED | ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED | VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST |
| Jun 9, 2016 | V*-DOB VIOLATION - Resolved | E-ELEVATOR ELEVATORREQUIRED | E-ELEVATOR ELEVATORREQUIRED |
| Jun 9, 2016 | V*-DOB VIOLATION - Resolved | E-ELEVATOR ELEVATORREQUIRED | E-ELEVATOR ELEVATORREQUIRED |
| Jun 9, 2016 | V*-DOB VIOLATION - Resolved | E-ELEVATOR ELEVATORREQUIRED | E-ELEVATOR ELEVATORREQUIRED |
| Jun 9, 2016 | V*-DOB VIOLATION - Resolved | E-ELEVATOR ELEVATORREQUIRED | E-ELEVATOR ELEVATORREQUIRED |
| Jun 9, 2016 | V*-DOB VIOLATION - Resolved | E-ELEVATOR ELEVATORREQUIRED | E-ELEVATOR ELEVATORREQUIRED |
| Jun 9, 2016 | V*-DOB VIOLATION - Resolved | E-ELEVATOR ELEVATORREQUIRED | E-ELEVATOR ELEVATORREQUIRED |
| Jun 9, 2016 | V*-DOB VIOLATION - Resolved | E-ELEVATOR ELEVATORREQUIRED | E-ELEVATOR ELEVATORREQUIRED |
| Jun 9, 2016 | V*-DOB VIOLATION - Resolved | E-ELEVATOR ELEVATORREQUIRED | E-ELEVATOR ELEVATORREQUIRED |