141 records

Date Status Type Summary
Nov 26, 2024 V*-DOB VIOLATION - DISMISSED AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
Sep 26, 2024 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FAILURE TO MAINTAIN.THERE'S 1 1/2"THICK MARBLE CLADDING AT THE EXP 1/2 CRNR UP TO 16TH STRY&ALSO @EXP2/3 NORTHEAST&EXP1/2(SOUTHWEST)CRNRS.@ EXP1/2(NORTHWEST)CRNR,4MARBLE PANELS HAD APPRX 2"OUTWRD.1.NYSPE QEWI TO IMMED EVAL THE MARBLE CLADDNG&DSGN RPAIRS,2.FILE FOR PRMTS BY 12/2/243.OBTN PRMTS&STRT WRK BY 12/16/24
Sep 26, 2024 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL EMERGENCY WRK.THERES 1/2"THCK MARBLE CLADDNG@EXP1/2CRNR UP TO THE 16TH STRY&ALSO@EXP 2/3(NORTHEAST)CRNR,4MARBLE PANELS HAD APPRX2"OUTWRD BULGE@EXP2 SIDE ON 3RDSTRY.ALSO@EXP 1/2CRNR,2MARBLE PANELS.1.IMMED INSTLL HEAVY DUTY SDWALK SHED ALONG ENT FRNTGE ON EXP1 &EXP2,2.CMPLT EMRGNCY STBILIZATN WRK PRIOR TO INSTLL@EXP1/2
Sep 26, 2024 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL EMERGENCY WORK.@THE EXP1/2 CRNR,THERE WAS 4MARBLE PANELS W/2" OUTWRD BLGE@EXP2 SIDE ON 3RD STRY.ALSO@EXP 1/2CRNR, MARBLE PANELS HAD A 1/2 OUTWRD BLGE@EXP1 SIDE ON 3RD&4THFL LEVELS.1.IMMED INSTLLSHRNG&BRACNG & RMVE BULGD MARBLE CLADDNG@DIRCTN OF PE,2.ALL WRK TO BE DRCTLY SPRVSD& DRCTD BY ONSITE NYSPE
Sep 26, 2024 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL EMERGENCY WORK.AT THE EXP 1/2 CORNER,THERE WERE 4MARBLE PANELS W/A 24 OUTWRD BULGE@EXP SIDE ON 3RD STRY.ALSO AT EXP 1/2CRNR,2MARBLE PANELS HAD A 1/2 OUTWRD BYKGE@EXP 1 SIDE ON 3RD&4THFL LVL.1.IMMED INSTLL CONSTRCTN FENCE TO ENCLOSRE 15MIN OF SDWALK @EXP1&EXP2 FOR DSTNCE OF 30''ALNG EXP1&40'ALNG EXP2 TO SRRND
Sep 26, 2024 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FAILURE TO MAINTAIN FACADE & APPURTENANCES. MARBLE CLADDING FAILURE @3 FL, EXP2, N ELEV. REMEDY:THE OWNER TO RETAIN SERVICE OF NYS REG DESIGN PROF WITH QEWI CERTIFICATE & MARBLE WORKS EXPERIENCE TO INSPECT & EVAL 100% ON ALL FACADE-MARBLE STONES CLADDING WORKS @ ALL ELEVS. PROVIDE REPORT FACADES@BUILDINGS.NYC.GOV NO LATER THAN 10/10/2024
Sep 26, 2024 V-DOB VIOLATION - ACTIVE IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL PROVIDE APPRX 40 LINEAR FEET OF CONSTRUCTION FENCE @ EXPO#2 (WEST 40 S TREET) TO EXTEND TO THE CURB LINE & APPRX 30 LINEAR FEET OF CONSTRUCTI ON FENCE @ EXPO#1 (BROADWAY) TO EXTEND TO THE CURB LINE IN AN L SHAPE TO SAFEGUARD PUBLIC AND PROPERTY
Sep 26, 2024 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL OBSERVED 2-EXTERIOR MARBLE PANEL APPROX. SIZE 4'-0" X 10'-0" EACH DISLODGED, BUILDING POPPED-OUT AND LOOSE ON 3RD FLOOR LEVEL AT THE CORNER OF EXPO # 01 & 02. BULGING LOOSE PANELS ARE HANGING OVER MTA SUBWAY ENTRANCE AT W 40 STREET AND POTENTIAL FALLING CONDITION.
Feb 21, 2022 V-DOB VIOLATION - ACTIVE FISPFCS-FAILURE TO CORRECT SWARMP CONDITIONS (FACADE) FACADE REQUIRED CYCLE 9A FAILURE TO CORRECT SWARMP CONDITIONS
Jul 22, 2021 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
Jul 20, 2020 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
Jul 20, 2020 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
Sep 6, 2019 V*-DOB VIOLATION - DISMISSED ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST
Sep 6, 2019 V*-DOB VIOLATION - DISMISSED ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST
Sep 6, 2019 V*-DOB VIOLATION - DISMISSED ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST
Sep 6, 2019 V*-DOB VIOLATION - DISMISSED ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST
Sep 6, 2019 V*-DOB VIOLATION - DISMISSED ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST
Sep 6, 2019 V*-DOB VIOLATION - DISMISSED ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST
Sep 6, 2019 V*-DOB VIOLATION - DISMISSED ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST
Sep 6, 2019 V*-DOB VIOLATION - DISMISSED ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST
Sep 6, 2019 V*-DOB VIOLATION - DISMISSED ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST
Sep 3, 2019 V*-DOB VIOLATION - DISMISSED LL2604S-SPRINKLER NONE FAILED TO FILE FINAL SPRINKLER REPORT BY JULY 1, 2019
Apr 5, 2019 V*-DOB VIOLATION - DISMISSED EVCAT1-ELEVATOR ANNUAL INSPECTION / TEST ELEVATORREQUIRED VIOLATION ISSUED TO ELEVATOR - FAILURE TO FILE CATEGORY 1 2017 INSPECTION/TEST
Apr 5, 2019 V*-DOB VIOLATION - DISMISSED EVCAT1-ELEVATOR ANNUAL INSPECTION / TEST ELEVATORREQUIRED VIOLATION ISSUED TO ELEVATOR - FAILURE TO FILE CATEGORY 1 2017 INSPECTION/TEST
Apr 5, 2019 V*-DOB VIOLATION - DISMISSED EVCAT1-ELEVATOR ANNUAL INSPECTION / TEST ELEVATORREQUIRED VIOLATION ISSUED TO ELEVATOR - FAILURE TO FILE CATEGORY 1 2017 INSPECTION/TEST
Apr 5, 2019 V*-DOB VIOLATION - DISMISSED EVCAT1-ELEVATOR ANNUAL INSPECTION / TEST ELEVATORREQUIRED VIOLATION ISSUED TO ELEVATOR - FAILURE TO FILE CATEGORY 1 2017 INSPECTION/TEST
Aug 1, 2018 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
May 31, 2018 V*-DOB VIOLATION - DISMISSED FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED FAILED TO FILE FISP CYCLE 8A TECHNICAL REPORT BY 02/21/2017
Jan 26, 2018 V*-DOB VIOLATION - DISMISSED ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST
Jul 10, 2017 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
Jul 10, 2017 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
Jul 10, 2017 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
Jul 10, 2017 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
Jul 10, 2017 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
Jul 10, 2017 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
Jul 10, 2017 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
Jul 10, 2017 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
Jul 5, 2017 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
Jul 5, 2017 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
Jul 5, 2017 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
Apr 5, 2017 V-DOB VIOLATION - ACTIVE AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
Jan 3, 2017 V*-DOB VIOLATION - DISMISSED ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST
Jun 9, 2016 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
Jun 9, 2016 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
Jun 9, 2016 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
Jun 9, 2016 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
Jun 9, 2016 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
Jun 9, 2016 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
Jun 9, 2016 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
Jun 9, 2016 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED