Manhattan Upper East Side-Lenox Hill-Roosevelt Island
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
4 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Nov 24, 2020 | V*-DOB VIOLATION - DISMISSED | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | PROVIDE APPROXIMATELY 35 LINEAR FEET OF SIDEWALK SHED ALONG EXPOSURE 1 (2ND AVENUE) TO SAFEGUARD THE PUBLIC AND PROPERTY |
| Nov 23, 2020 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. AT TIME OF INSPECTION OBSERVED ENTIRE LENGTH OF METAL ROOF CORNICE DISLODGED AND HANGING OVER PEDESTRIANS SIDEWALK AT EXPO # 01. PARAPET STABILITY COMPROMISED. |
| May 15, 2014 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT |
| May 4, 1998 | V-DOB VIOLATION - ACTIVE | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |