Manhattan Washington Heights (South)
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
4 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Dec 29, 2022 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FTM.1ST FL HAD CRCKS THROUGHOUT ENTIRE STORE.FLOOR WAS SLOPE&DMAGED EXP 1/4 CRNR HAD FCADE STONE DMAGE,&CRCKS UNDER STEELHEADER BEAM.LOC ON EXP1 WALL HAD FCADE CRCKS & SPALLED STONES. IMMEDIATELY COMPLY WITH COMMISSIONER'S ORDER 341091 (120722FEU11202ZT) |
| Dec 7, 2022 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | EMER WORK ORDR.OBSRVD DECRTVE STONE ON EXP1&4 WAS DMAGED W/DMAGED W/ LOOSE BRICK HANGNG.STEAL BEAM ON EXP1 WALL HAD VERTCL CRCKS.OWNER TO IMMED RETAIN NYSPE&DOB REG CNTRCTR TO ERECT SIDEWALK SHED @ FULL WIDTH OF EXP1 W/5' EXT ON EXP 1/4 CRNR |
| Dec 7, 2022 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FTM. 1ST FL HAD CRCKS THROUGHOUT ENTIRE STORE.FLOOR WAS SLOPE & DMAGED EXP 1/4 CRNR HAD FCADE STONE DMAGE, CRCKS UNDER STEELHEADER BEAM. LOC ON EXP1 WALL HAD FCADE CRCKS & SPALLED STONES |
| Aug 29, 1995 | V-DOB VIOLATION - ACTIVE | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |