40 records

Date Status Type Summary
Nov 14, 2025 V-DOB VIOLATION - ACTIVE LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
Sep 23, 2024 V-DOB VIOLATION - ACTIVE LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION
Jun 30, 2023 V-DOB VIOLATION - ACTIVE LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION
Apr 25, 2023 V-DOB VIOLATION - ACTIVE LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION
May 3, 2021 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
Apr 6, 2018 V-DOB VIOLATION - ACTIVE LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT
Mar 20, 2018 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
Feb 24, 2017 V-DOB VIOLATION - ACTIVE LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT
Feb 26, 2016 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
Oct 1, 2015 V*-DOB VIOLATION - DISMISSED LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2014 INSPECTION REPORT
Mar 3, 2015 V*-DOB VIOLATION - DISMISSED LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT
Jan 15, 2015 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
May 15, 2014 V*-DOB VIOLATION - DISMISSED LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT
May 15, 2014 V*-DOB VIOLATION - DISMISSED LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT
Jan 20, 2014 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
Jan 9, 2013 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
Oct 17, 2012 V*-DOB VIOLATION - DISMISSED AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
Oct 17, 2012 V*-DOB VIOLATION - DISMISSED AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
Oct 17, 2012 V*-DOB VIOLATION - DISMISSED AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
Oct 17, 2012 V*-DOB VIOLATION - DISMISSED AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
Oct 1, 2012 V*-DOB VIOLATION - DISMISSED EVCAT1-ELEVATOR ANNUAL INSPECTION / TEST ELEVATORREQUIRED VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2011 INSPECTION/TEST
Dec 13, 2011 V*-DOB VIOLATION - DISMISSED LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2010 INSPECTION REPORT
Dec 31, 2009 V*-DOB VIOLATION - DISMISSED LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
Dec 31, 2009 V*-DOB VIOLATION - DISMISSED LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
Oct 8, 2009 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL MISCELLANROUS VILATIONS FAILURE TO COMPLY WITH A ORDER TO STOP WORK BY THE DEPARTMENT NOTED AT TIME OF INSPECTION CONTRACTOR WAS WORKING IN APARTMENT 4C & 4 ALSO WORKING IN CELLAR DOING UNDERPINNING AT EXP 4 RE MEDY: COMPLY WITH NOTICE OF VIOLATION STOP WORK IMMEDIATELY
Sep 25, 2009 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL STOP ALL WORK INADEQUATE DETAILS ON APPROVED PLANS FOR TEMPORARY SHORI NG JOIST REPLACEMENT AND FIRST FLOOR CONSTRUCTION SEQUANCE FLOOTING & CONNECTION DESIGN FOR EXISTING COLUMNS TO REMAIN WHERE NEW BOX MEANS LAYOUT INTERSECTS EXITING GIRDERS REMEDY: STOP ALL WORK SUBMIT PLANS F OR SEP EX REVIEW 212 442-1544
Sep 25, 2009 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL STOP ALL WORK UNDERPINNING DOES NOT CONFORM TO APPROVED PLANS TYPICAL OPINS CONSTRUCTED 4 FEET WIDE INSTEAD OF REQUIRED 3 FEET MAX " PINS AR E APPROX 43 INCHES HIGH INSTEAD 2' 6" AS SHOWN ON PLANS PINS CONSTRUCT ED WITHOUT WEDGE AND DRY PACK GROUT FOR LEAD TRANSFOR REMEDY: STOP ALL WORK FORTHWITH SUBMIT PLANS AND SPECIALING REPORTS TO SEP EX FOR ENG
Sep 25, 2009 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL STOP ALL WORK INADEQUATE DETAILS ON APPROVED PLANS FOR TEMPORARY SHORI NG JOIST REPLACEMENT AND FIRST FLOOR CONSTRUCTION SEQUENCE REMEDY: STO P ALL WORK SUBMIT PLANS FOR SEP EX ENG REVIEW 212 442-1544
Sep 25, 2009 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL STOP ALL WORK UNDERPINNING DOES NOT CONFORM TO APPROVED PLANS ¢OMS CPM STRICTED 4 FEET WIDE INSTEADOF REQUIRED 3' - 0" MAX PINS ARE APPROX 43 INCHES HIGH INSTEAD OF 2' 6" AS SHOWN ON PLANS PINS CONSTRUCTED WITHO UT WEDTH & DRYPACK GROUT FOR LOAD TRANSFER REMEDY: STOP ALL WORK SUBMI T PLANS AND INSPECTION REPORTS TO SEP EX ENG REVIEW 212 442-1544
Mar 23, 2009 VW*-VIOLATION - WORK W/O PERMIT DISMISSED C-CONSTRUCTION OTHER OPTIONAL C-CONSTRUCTION OTHER OPTIONAL
Mar 16, 2009 VW*-VIOLATION - WORK W/O PERMIT DISMISSED C-CONSTRUCTION OTHER OPTIONAL C-CONSTRUCTION OTHER OPTIONAL
Jan 1, 2009 V*-DOB VIOLATION - DISMISSED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
Jan 1, 2009 V*-DOB VIOLATION - DISMISSED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
Jan 3, 2008 V*-DOB VIOLATION - DISMISSED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
Feb 7, 2000 V*-DOB VIOLATION - DISMISSED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
Mar 16, 1999 V*-DOB VIOLATION - DISMISSED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
Aug 29, 1995 V*-DOB VIOLATION - DISMISSED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
Mar 18, 1994 V*-DOB VIOLATION - DISMISSED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
Mar 18, 1993 V*-DOB VIOLATION - DISMISSED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
Mar 18, 1993 V*-DOB VIOLATION - DISMISSED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED