NYC Building Report

Manhattan Harlem (North)

136 West 129 Street, Manhattan

DOB violations

Department of Buildings violations attached to this BIN or tax lot.

6 records

Date Status Type Summary
Oct 3, 2025 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL NOTED: AT BASEMENT LEVEL DANCE STUDIO, FINISH FL ACTIVELY GIVING WAY UNDER FOOT, NOTICEABLY WARPED, ESPECIALLY TOWARDS EXP 3. UPON INSPECTION AT THE CELLAR LEVEL, MANY BEAMS APPEARED ROTTED & DETERIORATED, ALONG W/ SUBFLOOR. OWNER HAS ATTEMPTED TO SHORE BEAMS BY SISTERING NEW BEAMS AND POSTS (WWP). SPACE IS ABOUT 45' (L) X 20'
Jun 30, 2023 V-DOB VIOLATION - ACTIVE LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION
Jun 30, 2023 V-DOB VIOLATION - ACTIVE LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION
Jun 20, 2023 V-DOB VIOLATION - ACTIVE LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION
Jun 20, 2023 V-DOB VIOLATION - ACTIVE LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION
Feb 10, 1997 V-DOB VIOLATION - ACTIVE LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED