| May 16, 2026 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FTM BLDG EXTERIOR WALLS & APPURT IN A CODE COMPLIANT MANNER. AT TIME OF INSPECTION, OBSERVED CRACKED WINDOW LINTEL MASONRY DECOR, MULTI LOCATIONS, AT EXP 2 EAST ELEVATION, SPALLED CONCRETE STUCCO, CRACKED/ SPALLED BRICKS MULTI LOCATIONS AT EXP 3 SOUTH ELEVATIONS. REMEDY: OWNER TO REPAIR AND/OR REPLACE |
| Mar 18, 2025 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN BUILDING EXTERIOR FACADE AND APPURTENANCES IN A CO DE COMPLIANT MANNER.AT TIME OF INSPECTION,IT WAS OBSERVED AT EXP1 NORT H ELEV CRACKED STONE AND SPALLING,AND DAMAGED WINDOW LINTEL.AT EXP2 DA MAGED/DETERIORATED MORTAR JOINTS AND CRACKED STONES WERE OBSERVED.AT E XP3 SPALLING BRICK,STUCCO FACADE.REMEDY:REPAIR AND/OR REPLACE |
| Oct 3, 2024 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.OBSERVED AT EXP1 NORTH ELEV DAMAGED COPING AND SPALLING AT WINDOW LINTELS.EXP2 DAMAGED JOINTS AND CRACKED STONE ON MULTIPLE FLOORS.EXP3 DAMAGED BULGING AT PA RAPET AND 1 FLOOR SET BACK.EXP4 DAMAGED JOINTS.REMEDY:MAINTAIN BUILDIN G.REPAIR AND/OR REPLACE |
| May 23, 2024 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | VACATE ORDER DUE TO SPALLING STUCCO ABOVE EXP3 SOUTH ELEV COURTYARD.CO NDITION POSES HAZARD TO TENANTS AND PROPERTY.REMEDY:EXP3 SOUTH ELEV CO URTYARD TO BE VACATED AND TAKE MEASURES TO PREVENT ACCESS TO VACATED A REA |
| May 23, 2024 | V*-DOB VIOLATION - DISMISSED | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | REMEDY: PROVIDE APPROX 30' TOTAL LINEAR FEET (APPROX. 30 LF AT SOUTHWE ST CORNER) OF SIDEWALK SHED AT EXPOSURE #3 SOUTH ELEVATION |
| May 10, 2024 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER.AS NOTED AT TH E TIME OF INSPECTION,I OBSERVED ON EXP1 NORTH ELEV AND EXP2 CRACKED AN D SPALLING TERRA COTTA AT WINDOW ENCLOSURE ON MULTIPLE FLOORS.EXP3 SOU TH ELEV SPALLING,BULGING,CRACKED STUCCO AT PARAPET.REMEDY:REPAIR AND/O R REPLACE DAMAGED FACADE |
| May 10, 2024 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | EMERGENCY WORK ORDER DUE TO HAZARDOUS CONDITION ON EXPOSURE#3 S ELEV AT THE PARAPET WALL. AT THE TIME OF INSPECTION, I OBSERVED BULGING CRACKS & SPALLING STUCCO AT PARAPET WITH AN UNPROTECTED PARKING LOT BELOW. REMEDY:IMMEDIATELY PROVIDE SAFETY MEASURES TO PROTECT THE PUBLIC SECURE LICENSED PROFESSIONAL TO SUPERVISE WORK |
| Apr 29, 2021 | V*-DOB VIOLATION - DISMISSED | EGRADE-FAILURE TO POST ENERGY GRADE/SCORE NONE | FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3 |
| Mar 6, 2019 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Mar 6, 2019 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Sep 29, 2000 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |
| Sep 29, 2000 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |
| May 4, 1998 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Sep 16, 1997 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Jul 26, 1995 | V*-DOB VIOLATION - DISMISSED | ES-ELECTRIC SIGNS NONE | ES-ELECTRIC SIGNS NONE |
| Jul 26, 1995 | V*-DOB VIOLATION - DISMISSED | ES-ELECTRIC SIGNS NONE | ES-ELECTRIC SIGNS NONE |
| Mar 18, 1993 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |