Manhattan Upper East Side-Lenox Hill-Roosevelt Island
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
9 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Apr 25, 2023 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION |
| Apr 5, 2022 | V-DOB VIOLATION - ACTIVE | P-PLUMBING NONE | THE DEPARTMENT OF BUILDINGS ORDERS ALL PLUMBING WORK UNDER JOB # 122960661 STOPPED IMMEDIATELY DUE TO THE SUSPENSION OF LMP #1549 |
| Apr 5, 2022 | V-DOB VIOLATION - ACTIVE | P-PLUMBING NONE | THE DEPARTMENT OF BUILDINGS ORDERS ALL PLUMBING WORK UNDER JOB # 122872631 STOPPED IMMEDIATELY DUE TO THE SUSPENSION OF LMP #1549 |
| Nov 14, 2018 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| May 16, 2018 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| May 16, 2018 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| May 2, 2018 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | INSTALLATION RELIEVEING WALLS IN APTS 1R & 4R TO START BY 5/3 @ 8 AM UNDER SUPERVISON OF LICENSED P.E., FILE FOR PERMIT AND AMEND DRAWINGS |
| Mar 3, 2015 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT |
| Mar 3, 2015 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT |